Table of Contents

1.

Introduction ............................................................................................................................... 1
1.1
Background ....................................................................................................................... 1
1.2. Objectives ......................................................................................................................... 1
1.3. Scope of Work .................................................................................................................. 1
1.4.
Appointment of Consultant ........................................................................................... 2
1.5
Mobilization Consultant Team ......................................................................................... 2
2. Appreciation of the Project and Field Visit .............................................................................. 3
2.1
Project Status .................................................................................................................... 4
2.2
Alignment ......................................................................................................................... 5
2.3
Drainages System.............................................................................................................. 6
2.4
Roadside Drains ................................................................................................................ 7
3. Economic Analysis ................................................................................................................... 7
3.1
Estimating Cost ................................................................................................................. 7
3.2
Salvage Value: .................................................................................................................. 8
3.3
Estimating Benefits: .......................................................................................................... 8
3.4
Vehicle operating costs ..................................................................................................... 8
3.5
Road maintenance benefits ............................................................................................... 9
3.6
Time-savings ..................................................................................................................... 9
3.7
Reduction in Accident Cost: ............................................................................................. 9
3.8
Economic development benefits ..................................................................................... 10
4. Engineering Survey................................................................................................................. 11
5
Engineering Design of Road ................................................................................................... 13
5.1
General ............................................................................................................................ 13
5.2
Geometric Design of Highway ....................................................................................... 13
5.2.1
Special Design Features .......................................................................................... 14
6. Traffic Survey and Study ........................................................................................................ 17
6.1
Objective/Purpose .......................................................................................................... 18
6.2
Traffic Count Survey ...................................................................................................... 18
6.3
Estimating Traffic Flows ................................................................................................ 18
6.4
Traffic Growth Factor: .................................................................................................... 19
7.
Geology and Geo-technical Investigation:.......................................................................... 24
7.1
Geology: .......................................................................................................................... 24
7.2: Geotechnical Investigation: ............................................................................................ 25
8
Design of Pavement ................................................................................................................ 26
8.1
General ............................................................................................................................ 26
8.2
Traffic Count Results and Projected ESAL ................................................................... 26
8.3
Pavement Design ............................................................................................................ 28
9. Hydrological Investigation...................................................................................................... 31
10.
Cross Drainage Design ....................................................................................................... 31
11.
Construction Methodology ................................................................................................. 33
11.1
General ........................................................................................................................ 33
11.2 Widening of Road Formation ......................................................................................... 33
11.3 Construction of Granular Sub-base ................................................................................. 33
11.4 Construction of Granular Base Course: .......................................................................... 34
11.5 Construction of Double Bituminous Surface Dressing/ Otta Seal .................................. 35
12.
Cost Estimate: ..................................................................................................................... 35
12.1 Engineers Estimates ........................................................................................................ 35
12.1.1 General Introduction ............................................................................................... 35
12.1.2 Unit Rates................................................................................................................ 35
12.2 Quantities and Cost Estimates for Road Construction .................................................... 35
i

List of Tables
Table 1.A:
Table 1.B:
Table 2
Table 3:
Table 4:
Table 5:
Table 6:
Table 7:
Table 8:
Table 9:
Table 10:
Table 11:

Benefits and Costs as per Option 1.A


Benefits and Costs as per Option 1.B
Table of Benchmark Details
Design Parameters
Classified Manual Vehicle Count
Equivalent Standard Axle Load per unit
Computation of Equivalent Standard Axle Load and Projection
Pavement Thickness Design
Grading Envelop for Gravel
Physical Requirements of Graded Crushed Stone
Grading envelope for Graded Crushed stone base and sub-base
Adopted Abstract of Cost for 7m width DBST Carriage way and 1.4m width SBST
Shoulder both sides as per Nepal Urban Road Standard (Draft) incorporated with
Nepal Road Standard.

List of Figures
Figure 1:
Figure 2:
Figure 3:
Figure 4:
Figure 5
Figure 6:
Figure 7:
Figure 8:
Figure 9:
Figure 10:
Figure 11:
Figure 12:
Figure 13:
Figure 14:
Figure 15:
Figure 16:

Srijana Chowk
Entrance of Gokul Marga
Starting Point of Gokul Marga
Minor Bridge at 0+715
A glimpse of a Road
An interface of SW-Roads
Format for production of quantity calculation
Format for Production of Summary and Extract of Quantities
Public Transport
Types of Traffic at Gokul Marga
Daily Variation of Traffic flow
Geological Map of the Area
Load dial reading Vs. Penetration graph of sample 1
Load dial reading Vs. Penetration graph of sample 2
Bridge Location in Gokul Marg
Existing Bridge and the Condition

ii

1.

INTRODUCTION

1.1

Background

The second component under the Urban Governance Development Project (UGDP) Emerging
Towns Projects (ETP), under the funding of the World Bank, covers the socio-economic
infrastructure development in the six candidate Municipalities identified in the first phase of
implementation. The six municipalities are Baglung, Tansen and Lekhnath in Western Region
and Itahari, Dhankuta and Mechinagar in the Eastern Region.
Upon the request from the Municipalities for their respective priority infrastructure projects, the
Town Development Fund (TDF) has approved grant to each of these mentioned municipalities to
finance the Feasibility Study and Detailed Engineering Design for seven subprojects to be
implemented at the initial stage as Fast Track subprojects.
The above municipalities were asked to prioritize projects having least environmental and social
issues so that these sub-projects could be undertaken for immediate implementation as fast track
sub-projects. The successful implementation of these fast track sub-projects by the municipalities
will further attract more of such infrastructure projects within the municipalities in the coming
years.
For the purpose of carrying out the consulting services, the sub-projects are grouped into two
Packages. The Package1, for which this consultant is responsible for the services as per the
Terms of Reference, consists of the following five sub-projects:
Beautification of Entrance Gate Mechinagar Municipality
Gokul Marg Blacktop Road, Northern Part Mechinagar Municipality
Sahid Marg Construction Mechinagar Municipality
City Area Surface Drainage Improvement, East West Highway Segment Itahari
Municipality
e) Municipal Office Access Road Baglung Municipality
a)
b)
c)
d)

1.2.

Objectives

The objectives of the consulting services subject to this Terms of References are to elaborate
sub-project, based on the analysis of the physical, economic, financial, social, environmental,
legal and institutional aspects prevailing in the area and alternative scenarios for the
development of the proposed subproject components.
1.3.

Scope of Work

The scope of work is divided into three phases for each of the sub-projects in the three
municipalities. The consultant needs to carry out his obligations as per the Terms of References
in three phases in succession one after the other. The consultant needs to move to the next
phase only after review, decisions on modalities and approval of the first phase by the respective
municipalities and clearance by The TDF. Though the consultant is working for the municipalities,
TDF, the grantor of the assignment, will also monitor the consultants works. The three phases of
the scope of works for each of the sub-projects are as follows:
1. Phase I: Project Concept and Feasibility Support
In the Phase I of the Scope of Work the consultant should carry out the works which
includes but not limited to the following specific steps:
A conceptual design and development of the proposed sub-project
Technical, financial and economic analysis
Examination of the critical risks and the problems (e.g. financial, social, legal and
institutional risks)

Operational feasibility

2. Phase II: Project Engineering Design Support


After approval of the feasibility study and sub-project modalities by the municipalities and
clearance by the TDF, the consultant will carry out the Phase II Scope of Work which
includes but not limited to the following specific steps:
Recommendation, based on feasibility study and agreed modalities the consultant
should carry out detailed engineering works , including the followings:
Complete detailed engineering design documents and detailed cost
estimates;
Implementation Schedule;
Draft tender documents;
3. Phase III: Project Concept and Feasibility Support
After approval of the subproject modalities and the engineering design by the
municipalities and approval of project financing by TDF, the consultant will assist the
municipalities with documents that facilitate the project implementation which includes;
Construction Schedule ;
Tender Documents;
A broad description of the scope of works is described in the three phases above. However,
there are few more project specific scopes of works according to the nature of the sub-projects.
Terms of References, which is included with this report as an annex, describes the scope of
works in detail for each of the following sub-projects;
a) Beautification of Entrance Gate Mechinagar Municipality
b) GokulMarg Blacktop Road, Northern Part Mechinagar Municipality
c) SahidMarg Construction Mechinagar Municipality
d) City Area Surface Drainage Improvement, East West Highway Segment Itahari
Municipality
e) Municipal Office Access Road Baglung Municipality
1.4.

Appointment of Consultant

To carry out the consulting Services for Feasibility Study and Detailed Engineering Design of
Fast Track Sub-projects under Urban Governance and Development Program, Emerging Towns
Project was awarded to MEH/CIS JV. The Contract agreement for the services was signed on
January 18, 2012 between the employer and the consultants. The consultant has commenced its
service from 25th of January,20012. The assignment of the consulting services will complete
within four and half months from the start date.
The office of the consultant is set up in the premise of the MEH Consultants head office located
in New Baneswar.
1.5

Mobilization Consultant Team

The Consultants Team includes:


Professional Staff

Designation

1. Mr. P. J. Shah
2. Mr. A. M. L. Das
3. Mr. S. K. Karna
4. Ms. S. Shrestha
5. Mr. G. M. Tamrakar
6. Mr. G. K. Karna
7. Ms. N. Shrestha
8. Mr. S. S. Karki

Road Design Engineer /Team Leader


Sanitary/ Drainage Engineer/Dy. Team Leader
Geotechnical Engineer/Specialist
Architecture/Planner/Specialist
Civil Engineer/Specialist
Survey Coordinator/Specialist
Draftsman/CAD Operator/Specialist
Environmental Specialist/Specialist

9. Mr. K. R. Mishra
10. Mr. Y. R. Tamrakar
11. Mr. R. R. Adhikari
2.

Social Safeguard Specialist/Specialist


Economist-Financial Expert/Specialist
Civil Overseer/Specialist

APPRECIATION OF THE PROJECT AND FIELD VISIT

Field Survey and The consultant team members visited the site in February and have familiarized
with the site condition, existing road design, standards adopted were verified with the alternative
option as identified during desk study. The Team made a walk over survey along the full lengths
of these sub-projects in all the municipalities to assess presently existing physical, environmental
and social conditions. However, for two road sub-projects GokulMarg and SahidMarg in
Mechinagar Municipality, the team has to drive along the road to assess the present status.
The team identified and took note of the natural watercourses requiring cross-drainage
structures. Similarly, settlement in the urban areas that may be affected by the widening of the
road and the possible mitigation measures for improvement has been noted. It was observed that
for whole of the proposed road length, only one major watercourse, over which a culvert exists, is
there. Therefore no meticulous study or planning is deemed necessary for cross drainages. As
the existing road is built entirely in the shallow embankment and there is no notable evidence of
inundation and water logging, it is assumed that there will be no need of road side drains except
in the built up areas near the start of the project and Pratibha Chowk.
Figure 16: Srijana Chowk

Socio-environmental condition and issues on physical, biological, socioeconomic, cultural aspects has been identified and are included in the Social
Report. Similarly, property to be acquired, if any, has been in general
assessed. From our preliminary design and study at field there is no need to
acquire the additional land, since the Municipality have already allocated11m
on either sides of the road centre line, within which the road will be
constructed. However, there are few temporary houses/shops and few
boundary walls of residential buildings and school built within the road
corridor.
The consultant, after thorough study of possible alternative alignments, has
concluded that the present road corridor is the optimum alignment from
technical and economic point of view. Thus, the consultant has followed the
present road central line to carry out the detail design of the road without
crossing the limits of the road corridor.
2.1

Project Status

The Gokul Marg starts from the East-West highway at the Itabhatta Chowk.
This road serves as access to Ward-4 which is one of the emerging
settlements within the municipality. The road is about 2.5 kilometers under
the sub-project along the Gokul Marg. It starts from Itabhatta Chowk in the
East-West Highway and ends at approximately 2.5 kilometers north along the
Gokul Marg.
Presently the road section to be improved has a graveled surface covering
almost the entire length of the road and it is built in embankment. At the start
of the project, the road carriageway is clear from the encroachment.
However, the road corridor which is 11 meters from the centre line of the road
on either side as informed by the municipality Engineer, needs clearance.
This may not pose any social complication because the houses built there
are mostly of temporary nature. The other place which has permanent
houses inside the proposed right of way is the Pratibha Chowk. But the road
carriage way is clear of any obstructions. Apart from the above two areas
there is one Adarsh Madhyamik Viddyalaya, a school, whose boundary wall
encroaches the right of way but not the carriage way. The road ends at the
Srijana Chowk in the north.
The road alignment runs north-south thus causing minimum drainage
problems. The road shall be constructed entirely in the embankment with
very few cross drainage structures. The cross drainage structures will
facilitate the irrigation canals to pass from one side of the road to the other.
There is only one natural drainage system existing along the entire length of
the road. A culvert is constructed over it.
Environmentally, the road project should pose no adverse effect in the area.
The road passes through the agricultural area and it does not need felling of
any trees for the purpose. It is observed that urbanization is fast growing
alongside of the road. It can be expected that in the future it will grow more
after the road is constructed. Along with urbanization few small and medium
industries are likely to come up as the border with India is very close.

Figure 17: Entrance of Gokul Marga


2.2

Alignment

The road corridor lies in the flood plains of the Ninda River in the west and other small rivulets in
the east. It starts from the foothill of the Siwalik range in the north and ends at the Gangetic
plains in the south. The general geology of the project area is alluvial deposits comprising silts,
sand and clay as found in all over Terai region of the country.
Most part of the land on either side of the road corridor is under cultivation and in the remaining
part semi-urban and rural settlements and shops markets are either developed or are fast
developing as ribbon development. More detail about the general land use is included in the
social report.
The existing alignment of the road from is the most suitable alignment for the development of that
ward of the Mechinagar Municipality. The municipality has demarcated the 22m wide corridor of
the whole length of alignment.
The existing road is a double lane gravel road with varying width of carriageway. The formation
width of the road also varies. The carriageway width varies from 9 to 10 meters wide at the start
and up to 9 meters along most of the road length.
For about first 200 meters length of the road and near Pratibha Chowk, the alignment passes
through the settlement area. The rest of the alignment passes through the rural and scattered
settlements.

s t-

We
st

Hig
hw
ay

Gokul Marg
a

Ea

Figure 18: Starting Point of Gokul Marga


2.3

Drainages System

Gokul Marg Road is an existing trafficable two lane graveled road. The road alignment, starts at
the Itabhatta Chowk and follows the existing road up to the end of the sub-project after passing
Pratibha Chowk in between. There is only one properly constructed minor slab bridge having two
spans. Apart from the existing minor bridge, there is no other culvert properly constructed.

Figure 19: Minor Bridge at 0+715

2.4

Roadside Drains

At present there are no properly constructed road side drains except at the start of the subproject for about 300 meters length, Rest of the road has no road side drain because the road is
built entirely in shallow embankment. There is no need of road side drains.
3.

ECONOMIC ANALYSIS

3.1

Estimating Cost

The cost of a road project consists of the total cash expenditure incurred over the projects life.
There are two main components of this:
investment cost development (construction and upgrading), renewal, rehabilitation; and
Recurrent costs operation and maintenance.
Once a capital investment has been made, this has an inevitable, on-going and never-ending
consequence in terms of recurrent expenditure needs. Thus, capital investments should be
subject to appraisal to determine whether or not a particular investment is worthwhile. Recurrent
expenditures should also be subject to appraisal to determine the optimum expenditure mix
across a range of possible options.
The unit rate estimation technique is based on the traditional bill of quantity approach to pricing
construction work. This contains the quantities of work to be carried out, measured in accordance
with an appropriate method of measurement. The quantities of earthwork, drainage, pavement
works have be extracted by the software called SW-Roads. These quantities thus extracted are
multiplied by the rates calculated from detail rate analysis using respective district rates.
For road maintenance, Robinson (1988) estimated a comparative cost as below:
Road Type
Paved and unpaved
Paved and unpaved
Paved
Paved

Activity
Routine and recurrent
Periodic
Strengthening Overlay
Rehabilitation

Cost Range (units)


1 to 5
4 to 5
25 to 40
60 to 100

Option 1.A Abstract of Cost of DBSD Gokul Marga (7m Road Inclusive of 1.4m SBST
Shoulder both sides from 0+000 to 1+350)
Remarks
S.No.
Items Description
Unit Amount
1
General
NRs. 442,524.68
2
Site Clearance
NRs. 445,263.68
3
Earthwork
NRs. 6,125,287.91
4
Pavement Work
NRs. 17,504,794.10
5
Bituminous Work
NRs. 15,123,322.53
6
Retaining or Breast Wall
NRs. 107,257.56
7
Water Management
NRs. 588,341.30
8
Road Furniture and Traffic Safety Measures
NRs. 55,361.54
9
Bio-engineering Works
NRs. 21,089.70
10
Provisional Sums
NRs. 250,000.00
Grand Total Amount
A
NRs. 40,663,243.00
B
Add10% Contingencies (10% of A)
NRs. 4,066,324.30
C
Total amount with Contingencies (A+B)
NRs. 44,729,567.30
D
Add 13% Value added Tax (VAT) (13% of A)
NRs. 5,286,221.59
E
Total Amount inclusive of Contingencies and VAT (C+D) NRs. 50,015,788.89

S.No.

Items Description
Hence, Estimated Cost per Km section of the Road

Unit
NRs.

Amount

Remarks

19,454,507.89

The total cost of 50.016 million has been used for the purpose of economic analysis in the case
of Option 1.A. The Cost was depicted as per width of the Carriage way demanded by the Public.
Option
1.B
S.No.
1
2
3
4
5
6
7
8
9

10
A
B
C
D
E

Abstract of Cost of DBSD GokulMarga (5.5m Road Inclusive of 2.15m SBST


Shoulder both sides from 0+000 to 1+350)
Items Description
Unit Amount
Remarks
General
NRs. 442,524.68
Site Clearance
NRs. 443,715.21
Earthwork
NRs. 5,533,157.48
Pavement Work
NRs. 17,496,672.90
Bituminous Work
NRs. 12,920,686.02
Retaining or Breast Wall
NRs. 107,257.56
Water Management
NRs. 588,341.30
Road Furniture and Traffic Safety Measures
NRs. 55,361.54
Bio-engineering Works
NRs. 21,089.70
Provisional Sums
NRs. 250,000.00
Grand Total Amount
NRs. 37,858,806.38
Add10% Contingencies (10% of A)
NRs. 3,785,880.64
Total amount with Contingencies (A+B)
NRs. 41,644,687.02
Add 13% Value added Tax (VAT) (13% of A)
NRs. 4,921,644.83
Total Amount inclusive of Contingencies and VAT (C+D) NRs. 46,566,331.85
Hence, Estimated Cost per Km section of the Road
NRs. 18,112,781.80

The total cost of 46.566 million has been used for the purpose of economic analysis in the case
of Option 1.B. The Cost was depicted from the Carriage way width as per Traffic data collection
from the location as well as Nepal Road Standard incorporating public demand too.
3.2

Salvage Value:

Due to the nature of pavement it is always not possible that each alternative have its life used up
precisely at the end of the analysis period. One or more alternative may have some remaining
value of life at a time (IS: 13174 Part II 1994). The final item in such cost analysis is salvage
value at the end of the performance period, which in this instance is 10 years. In any event,
discounting back from as far out as 20 years results in a reduction to only 13 % of the capital
cost. (ISSN: 0975-5462, Vol. 4 No.03 March 2012, Mrs. Vidya Nitin Patil et al. / International
Journal of Engineering Science and Technology (IJEST))
3.3

Estimating Benefits:

For major roads, the following benefits are normally considered:


Vehicle operating costs (VOCs)
Road maintenance benefits
Time savings
Reduction in accident costs
Economic development benefits
3.4

Vehicle operating costs

VOCs are normally reduced when a road is improved. Road users perceive the savings through
lower expenditures in the following areas:
Fuel consumption
Lubricating oil consumption
Spare parts consumption
Vehicle maintenance labour
Tyre consumption
Vehicle depreciation
Crew costs in commercial vehicles.
For the purpose of our calculation, Vehicle operating Cost data has been used from different
project (Rural Transport Services Study and Policy Development). Vehicle Operating Costs in 4
districts at rural roads has been calculated by the consultants team. The 4 district comprises of
two terai and two hills. Vehicle Operating Cost at terai can actually resemble the true nature in
our case as well. It has been found from the studies that the vehicle operating cost differs from
1.35 to 1.9 times the original cost when the road is upgraded from graveled road to blacktopped
road. (Source: D. ilionien, Assoc. Prof. A. A. Juznas, Prof. A. Laurinaviius, Vilnius Gediminas Technical University
Road Department).
3.5

Road maintenance benefits

Maintenance savings can normally be expected with the following types of projects:
paving a gravel road where traffic levels have exceeded the level of economic surface
maintenance; and
Rehabilitation or renewal of a paved road that has deteriorated badly, since the improved
road is less costly to maintain than the existing one.
Due to the current trend of maintenance, road maintenance cost at present is not considerable
amount, hence this is not considered in our study.
3.6

Time-savings

Shorter road alignments and higher average speeds will lead to savings of time. The benefits of
shorter journey times will accrue to passengers being carried and to the commercial vehicle fleet
because higher vehicle utilization can be achieved. The time costs of commercial vehicles
include standing costs, such as crew wages, vehicle depreciation and interest on capital.
Travel time-savings for passengers in buses and private cars should be divided into time-savings
during working hours and during non-working hours. In the absence of better data, working time
can be valued at the average wage rate, plus an element to cover social overheads. The value of
non-working time depends on the willingness to pay for time by those who are commuting or
traveling for private purposes. Normally there are little or no data on this aspect. It can be argued
that, when unemployment is high and wages are low, the value of time is insignificant. However,
the occupants of cars are normally from the highest income group of society, and are likely to
value time relatively highly. Non-working time is then valued at a proportion of working time,
typically in the range of 050 per cent.
Time saving can be utilized by both vehicle and goods/passengers. If the vehicle reaches its
destination on time, it can be used in other important works, or it can also stay idle which both
costs money. For the analysis of time saving minimum cost is taken for vehicles use than its
actual value.
3.7

Reduction in Accident Cost:

In addition to the humanitarian consequences of reducing road deaths and injuries, a strong case
can be made for reducing accidents solely on economic grounds, as they consume massive
financial resources that countries can ill afford to lose.

A study carried out of national accident costs in different countries (Jacobs et al.2000) expressed
these as a percentage of Gross National Income. Results ranged from 0.3 per cent in Vietnam,
and 0.5 per cent in Nepal and Bangladesh, to almost 5 per cent in the United States, Malawi and
Kwa Zulu Natal in South Africa. It should be noted that, in this analysis, the costs determined by
the different countries have been used directly and not amended in any way. However, relatively
little is known about the accuracy of the costing procedures used in each country; for example,
whether or not under-reporting of accidents has been taken into account; how damage-only
accidents have been assessed; what sums (if any) have been added to reflect pain, grief and
suffering; if the human capital approach has been used, etc.
The study shows total accident cost to be around 1% of Gross National Income. The major
income of this area has been identified as agriculture. Total influence area of this road has been
identified as nearly 8500kathas. Out of which agricultural area can produce income of 40,00,000
per year.
3.8

Economic development benefits

The economy in the vicinity of the road may benefit if a road is improved or new access is
provided. It may be easier to make trips to farms or markets, or other commercial centres. There
may be benefits to agricultural producers because of reduced transport costs, which enable
higher prices to be obtained at the farm gate for goods that are produced.

Total Benefit

Total Cost

IRR Calculation

NPV

Net benefit

Total Benefit

User's Cost
Saving

Salvage Value

Total Cost

Maintenance
Cost

Year

Construction
Cost, Mill. Rs.

Table 1.A: Benefits and Costs as per Option 1.A

50.02
1

50.02

0.25

50.27

0.00

8.72

8.72

-41.55

37.10

-34.61

44.88

7.78

0.00

0.25

0.25

0.00

9.15

9.15

8.90

7.10

6.18

0.20

7.29

0.00

0.25

0.25

0.00

9.61

9.61

9.36

6.66

5.41

0.18

6.84

0.00

0.25

0.25

0.00

10.09

10.09

9.84

6.25

4.74

0.16

6.41

0.00

3.00

3.00

0.00

10.59

10.59

7.59

4.31

3.04

1.70

6.01

0.00

0.25

0.25

0.00

11.12

11.12

10.87

5.51

3.63

0.13

5.63

0.00

0.25

0.25

0.00

11.67

11.67

11.42

5.17

3.18

0.11

5.28

0.00

0.25

0.25

0.00

12.26

12.26

12.01

4.85

2.78

0.10

4.95

0.00

0.25

0.25

0.00

12.87

12.87

12.62

4.55

2.44

0.09

4.64

10

0.00

0.25

0.05

6.50

13.51

20.01

19.96

6.43

3.21

0.02

6.44

13.72

0.00

47.57

61.28

NPV @ 12 % DF (in Rs Million)


IRR
BC Ratio @ 12% DF

13.72
20.04%
1.29

10

Total Benefit

Total Cost

IRR
Calculation

NPV

Net benefit

Total Benefit

User's Cost
Saving

Salvage Value

Total Cost

Maintenance
Cost

Year

Construction
Cost, Mill. Rs.

Table 1.B: Benefits and Costs as per Option 1.B

46.57
1

46.57

0.23

46.80

0.00

8.72

8.72

-38.08

34.00

-31.06

41.78

7.78

0.00

0.23

0.23

0.00

9.15

9.15

8.92

7.11

5.93

0.19

7.29

0.00

0.23

0.23

0.00

9.61

9.61

9.37

6.67

5.09

0.17

6.84

0.00

0.23

0.23

0.00

10.09

10.09

9.85

6.26

4.36

0.15

6.41

0.00

2.79

2.79

0.00

10.59

10.59

7.80

4.42

2.81

1.59

6.01

0.00

0.23

0.23

0.00

11.12

11.12

10.89

5.52

3.20

0.12

5.63

0.00

0.23

0.23

0.00

11.67

11.67

11.44

5.18

2.75

0.11

5.28

0.00

0.23

0.23

0.00

12.26

12.26

12.02

4.86

2.35

0.09

4.95

0.00

0.23

0.23

0.00

12.87

12.87

12.64

4.56

2.02

0.08

4.64

10

0.00

0.23

0.05

6.05

13.51

19.56

19.51

6.28

2.54

0.02

6.30

16.85

0.00

44.29

61.14

NPV @ 12 % DF (in Rs Million)


IRR
BC Ratio @ 12% DF

4.

16.85
22.61%
1.38

ENGINEERING SURVEY

The consultant to accomplish the detailed engineering design, entailing the geometric design of
main carriageway and footpaths at places, drainage locations and structures etc. will be carried
out during detail field survey and study. In the course of field survey, following types of surveys
are normally needed:
Walkover survey
Reconnaissance Survey
Chainage Survey
Base Line Survey
Center Line Survey
Topographic Survey
Out of the above surveys, walkover, reconnaissance surveys are already carried out and the
findings are already given under Project Status above.
Chainage Survey: Chainage Survey will be carried out prior to establishing the Baseline and BM
for detail survey. During this survey, centre line pegging at intervals of 20m as mentioned in ToR
shall be carried out. If possible chainages will be written in the pegs and driven at the edge of the
road at the same intervals as centre line. This helps in tracing the important features of the road
during detail survey. This survey will be applicable for all road surveys.
Base Line Survey: The horizontal and vertical coordinates are arbitrarily fixed as the

length of road is not long. These arbitrary co-ordinates can be tied to the national grid if
needed. D-cards were prepared for all the Baseline stations established along the project
road.
Centreline Survey: After establishing the horizontal and vertical control points through Baseline
the consultant will carry the centreline survey. The purpose of the centreline survey is to fix the

11

existing centreline of the road and check whether the existing centreline could be followed for the
improvement. It will help to identify whether the shifting of alignment was necessary from various
points of views such as use of existing structures, avoiding the additional land acquisition etc.
Topographical Survey: The topographical survey for road consists of a strip survey along the
existing road alignment and corridor covering up to its right of way. The detailed survey shall
include among other, the benchmark survey, traverse survey along the proposed centre line and
detail topographic survey for the production of Digitized Terrain Model (DTM). Similarly, the
survey work will include established base line stations, horizontal control points and permanent
reference beacons plus re-establishment of the horizontal and vertical alignment and crosssection. It will also include existing houses, electric and telephone poles, trees, culverts and any
other structure along the road within the road corridor. All survey works shall be carried out using
total stations, EDM and leveling machines to obtain comprehensive topographic surveys for use
as the basis design and improvement.
In general, the Topography Survey covers the following tasks. However, its coverage is not
limited to the followings only.
a) Topography with details such as: trees, water bodies, high-flood level
b) Existing road details such as: formation width, paved area, access roads, bus bays,
footpath, parking places, traffic signs, islands, signals and ROW limits
c) Existing cross-drainage details such as: pier, abutment, railing, river training works
d) Existing power line details such as: high-tension poles, low-tension poles, transformers,
manholes
e) Existing telecommunication details such as: poles, man-holes, cabinets
f) Existing water supply line details such as: supply mains, valves, valve chambers,
hydrants
g) Existing sewer line details such as: trunk sewers, manholes
h) Existing buildings such as: religious shrines, governmental building, residential building
i) Production of a map of 25m wide road corridor in 1:1000 scale and with 0.2 m contour
interval
j) Establishing bench-marks at a maximum distance of every 500m or less depending upon
the visibility of points along the road. Details of the topographical survey drawings and the
digital terrain model developed using the topographical data are shown in the Volume II
drawings.
Table 2 Benchmark Details

Serial
No.
1
2
3
4
5
6
7
8
9
10

Easting X
12583.177
12575.981
12577.701
12571.446
12561.241
12561.392
12563.266
12525.525
12473.146
12447.357

Northing
Reduced
Y
Level Z
Remarks
51588.186 132.403 IBM
51456.982 132.235 IB33
51134.308 134.401 IB34
50876.963 137.610 IBM
50998.620 136.552 IBM
50983.878 137.114 IB1
50972.070 137.393 IB1#
52730.531 128.344 IBM
52135.793 125.438 IBM
51527.060 121.921 IBM

12

ENGINEERING DESIGN OF ROAD

5.1

General

The geometrical design is prepared to meet all the the parameters given in the term of reference.
The engineering design for road upgrading work mainly consists of the followings;
Design of Main Carriageway)
Design of Service Road
Design of intersections, if any.
Design of Service roads, if any.
The structural design of different elements of the Highway involves the design of the following
elements separately.
Geometric design
Pavement design
Road side drain design
Cross-drainage structure design
Generally, the Highway design is carried out to include the following elements as given in the
terms of reference.
Design of the vertical and horizontal alignment for a design speed of 60 kmph
Design of highway carriageway cross-section
Design of cut and fill slopes
Structural design of retaining structures
Structural design of all RCC structures (excluding the bridges and the underpasses, if
any)
Production of design drawings showing plan in 1:1000 scale, longitudinal profile in
1000H:100V scale cross sections at 10m interval in 1:100 scale
All the coordinates in the drawings are in referenced arbitrarily.
The detail design and the drawings of the road are presented in separate volume.
5.2

Geometric Design of Highway

The geometric design effectively superimposes a new, designed surface over the existing ground
surface. The existing ground surface, modeled as a digital terrain model (DTM), is prepared from
a detailed topographical survey carried out using accurate survey instruments such as Total
Station, EDM and Leveling Machines. Geometric design is then prepared digitally, using the
standard parameters of single lane carriageway with, as discussed and agreed during the
inception report presentation and meeting held there after and demand of the present volume of
traffic along the road. The design parameters given in the terms of reference are included while
preparing the geometric design. The computer-aided design process then maps the design
surface over the existing ground surface and evaluates quantities, profiles, and surface
intersections, (fills, cuts etc) and produces design drawings and quantity estimates.
The design of road was prepared using AutoCAD and design software produced by Softwel Pvt.
Ltd as follows:

SW_ DTM for Digital Terrain Modelling


SW_ Road for Highway Design

These two soft wares SW_DTM and SW_Road are widely used in Nepal for the design of roads
of all classes.

13

SW_DTM is software developed by Softwel Pvt. Ltd. And it provides complete package solution
for Digital Terrain Modeling. This software has interactive module for plotting of survey points,
triangulation and plotting of contours at any contour points at any contour interval. The program
provides facilitation to extract data and draw plan, profile/cross-sections for any alignment and
can be plotted in AutoCAD in any scale along with the data extraction as required by the users.
As mentioned in ToR, contours are drawn in 0.2m intervals to prepare the DTM for design
purposes. All the features like, roadside structures. Telephone poles, electric poles, transformers,
tress, shrines, buildings etc are shown in the DTM.
SW_Road is road designing software which has already been used for the design of existing
Belhiya-Butwal Road for upgrading to six lane standards. This software generates precise road
design outputs considering all parameters of road design. It produces all plans, profiles and the
cross-sections. The quantity calculation is done by the software and the output obtained in Excel
format and drawings such as plans, profiles and cross-sections are produced in AutoCAD file
format.

Figure 20 A glimpse of a Road


5.2.1

Special Design Features

Longitudinal Gradient/Radius of Curvature: The Nepal design standards were


adhered to, for the design of the project road. The existing curvatures along the road,
which were less than that required for 60kmph design speed, were increased as far as
possible but near the Punya Chowk it is not possible to increase the curvature for design
speed.

Design Speed: A design speed of 60 kmph was applied to finalize the design. All other
design parameters, confirming to the requirement of the above mentioned design speed
is taken into consideration in the geometric design.

Extra Widening: Extra Widening is basically provided in sharp bends with small radius
curvature when the rear wheel of the vehicles tends to go outside the carriageway.

Super elevation: When determining the super elevation of any road, it is expressed as,

Where,

=super elevation
= coefficient
= design speed in kmph
=radius of curvature
C=constant

14

From the above equation it is clear that super elevation depends on radius of curvature and
design speed. In case of BB road, design speed is considered 80KMPH, minimum radius of
curvature is 240m, and hence the Maximum super elevation provided in this road is 3% due the
larger radius of curvature.

Design Parameters: Some of the important parameters considered for the design of road
are shown in the table below. These parameters are the data required by the road design
software S_W Road.

Table 3: Design Parameters


SN
Descriptions
1.0
Carriage Way
1.1
Road Width
1.2
Camber Slope
1.3
2.0
2.1
2.2
2.4
3.0

Inputs

Unit

9 m
3 %

3.1
3.2
3.3
4.0

Camber Side
Vertical Alignment Design
Design Speed
Stopping Sight Distance
Minimum Change in Grade
Super Elevation Design
Maximum Outer Edge Slope
(1in..)
Normal Outer Edge Slope (1in..)
Minimum Super Elevation
Extra Widening Design

4.1

Extra Widening Transition Rate

0.1 m/m

4.2

Fixed Transition Length


Extra Widening Placement
Method
Extra Widening Transition Length
Calculation
Right of Way
Right of Way
Starting Chainage
Starting Chainage

10 m

4.3
4.4
5.0
5.1
6.0
6.1

Notes

2 for Hill Side, 1 for Both


Side

60 Km/hr
80 m
1.5 %

60 m
100 m
3 %

1
0
11 m

For Extra Widening Totally


Outside the Curve
Fixed Length Irrespective of
Widening
0 for Totally Inside, 1 for 1/3
Inside, 2 for Totally Outside
0 for Transition Rate, 1 for
Fixed Length
Either Direction

0 m

Plotting of Drawings: The Highway design software SW_Road, as mentioned above, generates
the drawings, which can be plotted in AutoCAD format as shown in the figure below. Few sample
drawing generated by the soft were are presented as follows.

15

Figure 21: An interface of SW-Roads


Quantity Calculation: The Design software has the facility to calculate the quantity of various
items in the Excel format as shown below. Besides that, it provides the cumulative quantity in a
summary format as shown below as sample.

Figure 22: Format for production of quantity calculation

16

Figure 23 Format for Production of Summary and Extract of Quantities


6.

TRAFFIC SURVEY AND STUDY

Transport Planning requires understanding of all types movements of all types of modes of
transport. This includes vehicles, pedestrian carts etc. The understanding of transport planning
involves determination of vehicle or pedestrian numbers, types of vehicles. Apart from these, it
also involves vehicle speeds, weights, and origin and destinations. To determine the numbers of
vehicles and the pedestrian traffic count is undertaken. For other characteristics of traffic
movements, require more detailed traffic survey and study. For our project requirement only the
counting of the all types of vehicles and the pedestrian is required. As mentioned in the terms of
reference the traffic and pedestrian count was carried by Classified Manual Vehicular Count
method. Our scope of work mentioned of 12-hour traffic count by CMVC method.

Figure 24: Public Transport

17

6.1

Objective/Purpose

The purpose of the traffic survey/study is to ascertain the number of different types of vehicles
using the road or highway. The data thus obtained by survey are analyzed for the following
objectives;
Projection of traffic growth for the design period,
Capacity of the road or the lanes,
Calculation of the equivalent standard axle load (ESAL) for pavement design
6.2

Traffic Count Survey

The Terms of Reference does not mention about the traffic survey. However, for the purpose of
pavement design a 12-hour traffic count was conducted at Prativa Chowk for Gokul Marg. The
data obtained are enough for the design of pavement. The count was based on Classified
Manual Vehicular Count method. The data obtained are given in the following tables.
For pavement design purposes it is necessary to consider not only the total number of vehicles
that will use the road but also the wheel loads (or, for convenience, the axle loads) of these
vehicles. The loads imposed by private cars do not contribute significantly to the structural
damage. For the purposes of structural design, cars and similar sized vehicles can be ignored
and only the total number and the axle loading of the heavy vehicles that will use the road during
its design life need to be considered in this context, heavy vehicles are defined as those having
an axle load of 3000 kg or more. The equivalence factor for 3000 kg axle load is only 0.01 which
means a vehicle having axle load of 3000 kg can do damage worth of 1% of design heavy
vehicle.
6.3

Estimating Traffic Flows

Transport Planning requires understanding of all types movements of all types of modes of
transport. This includes vehicles, pedestrian carts etc. The understanding of transport planning
involves determination of vehicle or pedestrian numbers, types of vehicles. Apart from these, it
also involves vehicle speeds, weights, and origin and destinations. To determine the numbers of
vehicles and the pedestrian, traffic count is undertaken. For other characteristics of traffic
movements, require more detailed traffic survey and study. For our project requirement only the
counting of the all types of vehicles is required. The traffic count was carried out by Classified
Manual Vehicular Count method. Details of traffic count survey are presented in the Annex of
the Report. Traffic count was conducted at a 15 minute basis to find out the peak hourly flow of
traffic in Gokul Marga. From the survey it was found that the peak hour exists at 11:30 A.M. to
12:30 A.M.

Figure 25: Types of Traffic at Gokul Marga

18

Figure 26: Daily Variation of Traffic flow


6.4

Traffic Growth Factor:

Average annual growth rate of 7.5% has been taken as a growth factor for the calculation of
design Equivalent Standard Axle Load for the design period. This value is recommended by
Indian Road Congress when adequate data are not available.

19

Table 4: Classified Manual Vehicle Count


Date: 15/12/068,

Location: Gokul Marg

Station no.:

Road Link:

Station: Pratibha Chowk

Name of Road: Gokul Marg

Seasonal variation Factor

Surveyed by:
0.89

Supervised by:

Volume of vehicles
Truck
Start Time,
(hrs)

Mul
ti
Axl
e
a b

Bus

Heavy

Light

Bia
Axle

Mini
a

Motorcycl
e

Car

Mic
ro
a

6:00 AM
6:15 AM

Utility
Vehicl
e

Tractor

Three
Wheeler

Rick
shaw

Bullock
Cart
a

4W Drive/
Geep/Va
n
a

Power
Tiller

Bicycle

12

6:30 AM

6:45 AM

7:00 AM
7:15 AM

7:30 AM

7:45 AM

8:00 AM

8:15 AM
8:30 AM

8:45 AM
9:00 AM

9:15 AM
9:30 AM

9:45 AM

10:00 AM
10:15 AM

1
2

2
7

13

11

12

18

20

20

20

20

17

16

20

20

20

20

40

40

40

30

20

30

10

1
1

20

20

45

40

40

20

16

21

20

Date: 15/12/068,

Location: Gokul Marg

Station no.:

Road Link:

Station: Pratibha Chowk

Name of Road: Gokul Marg

Seasonal variation Factor

Surveyed by:
0.89

Supervised by:

Volume of vehicles
Truck
Start Time,
(hrs)

Mul
ti
Axl
e
a b

Bus

Heavy

Light

Bia
Axle

Mini
a

Motorcycl
e

Car

Mic
ro
a

10:30 AM

15

12

10:45 AM

13

12

11:00 AM
11:15 AM
11:30 AM
11:45 AM

1
1

10

22

13

25

25

10

20

15

21

20

15

11

22

23

20

25

15

15

32

35

1
1

35

35

10

10

15

15

20

25

25

13

20

22

20

20

16

20

10

15

12

11
15

21

15

40

11

60

Bicycle

40

1:15 PM

Power
Tiller

58

1:00 PM

4W Drive/
Geep/Va
n

Bullock
Cart

12:45 PM

2:00 PM

10

12:30 PM

1:45 PM

10

1:30 PM

16

2
1

Rick
shaw

10

Three
Wheeler

15

12:15 PM

Tractor

1
1

12:NOON

Utility
Vehicl
e

3
1

12

2:15 PM

12

10

12

13

2:30 PM

11

10

15

15

2:45 PM

3:00 PM

10

10

10

10

15

15

21

Date: 15/12/068,

Location: Gokul Marg

Station no.:

Road Link:

Station: Pratibha Chowk

Name of Road: Gokul Marg

Seasonal variation Factor

Surveyed by:
0.89

Supervised by:

Volume of vehicles
Truck
Start Time,
(hrs)

Mul
ti
Axl
e
a b

Bus

Heavy

Light

Bia
Axle

3:15 PM

3:30 PM

3:45 PM

4:00 PM
4:15 PM

2
1

4:30 PM

Mini
a

2
5

4:45 PM

5:00 PM

5:15 PM

5:30 PM

Three
Wheeler

Rick
shaw

10

30

30

20
5

1
2

1
2
2

5:45 PM

6:00 PM

2
3

Tractor

6:30 PM

Utility
Vehicl
e

6:15 PM

Motorcycl
e

Car

Mic
ro

3
2

20

20

20

25

17

20

25

20

11

10

12

13

10

12

16

12

20

12

10

11

2
7

1
3

1
2

2
2

2
1

7:00 PM

7:45 PM

7:15 PM
7:30 PM

18

6:45 PM

10

Bicycle

10

Power
Tiller

4W Drive/
Geep/Va
n
a

Bullock
Cart

2
1

1
2

2
1

22

Date: 15/12/068,

Location: Gokul Marg

Station no.:

Road Link:

Station: Pratibha Chowk

Name of Road: Gokul Marg

Seasonal variation Factor

Surveyed by:
0.89

Supervised by:

Volume of vehicles
Truck
Start Time,
(hrs)

Mul
ti
Axl
e
a b

Bus

Heavy

Light

Bia
Axle

Mini
a

Motorcycl
e

Car

Mic
ro
a

8:00 PM
8:15 PM

Tractor

Three
Wheeler

Rick
shaw

Bullock
Cart
a

8:45 PM
0

17

Power
Tiller

Bicycle

1
0

4W Drive/
Geep/Va
n

8:30 PM
Total

Utility
Vehicl
e

49

47

0 20

22

1
553

520

85

85

65

67

10

831

834

Total (a+b)
Composition
factor
PCU Factor

26

96

42

1073

170

132

17

1665

0.80

0.15

0.06

2.97

0.00

1.30

33.21

0.00

5.26

0.00

0.09

0.00

4.09

0.53

51.53

1.5

2.5

1.5

1.5

1.5

0.75

1.5

0.5

PCU ADT

0
0.0
0

78

7.5

240

42

1609.5

255

132

25.5

832.5

69.62

6.69

5.36

214.20

0.00

37.49

1436.48

0.00

227.59

0.00

2.68

0.00

117.81

22.76

743.01

AADT, PCU

23

7.

GEOLOGY AND GEO-TECHNICAL INVESTIGATION:

7.1

Geology:

The Himalaya was formed due to collision of Indian Plate and Eurasian Plate at about 40 million
years ago. It extends in 2400km east - west direction. Its width varies from 230 to 320 km and
bounded between the Indo-Gangetic Plain in the south and Tibetan Plateau in the north. Nepal
Himalaya occupies the central 800km part. It can be divided into five distinct morpho-geotectonic
zones, from south to the north as (1) Terai Plain (2) Sub Himalaya (Siwalik Range), (3) Lesser
Himalaya (Mahabharat Range and mid valleys) (4) Higher Himalaya and (5) Inner Himalaya
(Tibetan Tethys). Each of these zones is clearly identified by their morphological, geological and
tectonic features. Main Frontal Thrust (MFT), Main Boundary Thrust (MBT), Main Central Thrust
(MCT) and South Tibetan Detachment Fault system (STDFS), from south to the north
respectively are the major linear geological structures that act as the boundary line between the
two consecutive units.
From mineral resources point of view, Terai Plain is potential for gravel, sand, ground water and
petroleum. The Sub Himalaya is the potential area for construction materials, petroleum and
natural gas. Similarly, Lesser Himalaya is promising for metallic minerals, industrial minerals,
marble, gemstones, fuel minerals, construction materials etc. Some of the areas in Higher
Himalaya are highly promising for precious and semiprecious stones, marble and metallic
minerals. Tibetan Tethys zone is prospective for limestone, gypsum, brine water (salt) and
natural gas.

Mechinagar Municipality

Figure 27: Geological Map of the Area


The geological structure of the region consists of old and new alluvium, both of which constitute
as alluvial deposits mainly of sand, clay, silt, gravels and coarse fragments. The new alluvium is
renewed every year by fresh deposit brought down by active streams, which engage themselves
in fluvial action. Old alluvium is found rather away from river courses, especially on uplands of
the plain where silting is a rare phenomenon. The Terai region has a large number of small and
usually seasonal rivers, most of which originate in the Siwalik Hills. The soil in the Terai is alluvial
and fine to medium textured.
Mechinagar Municipality is composed geologically by quaternary Alluvial river deposits whereas
in the north there is middle-Miocene to Pho-Pleistocene molassic fluvial deposits known as
Siwalik Group. It mainly consists of conglomerates, sandstones and shale with vertebrate fossils
according to the geological map of Nepal.

24

7.2:

Geotechnical Investigation:

The consultant completed geotechnical investigation of the existing road pavement and
determined sub-soil condition through pitting and lab CBR test at Gokul Marga. The main
purpose of the geotechnical investigation was to assess the strength of the existing pavement
and other parameters required to design the road pavement.
The two soil samples thus collected from Gokul Marga was brought to CIS lab for further testing.
To replicate the existing soil condition, compaction from 90-95 % was achieved and testing was
done. From lab results, CBR value was obtained to be 27.4% and 27.1 for sample 1 and sample
2 respectively. An average value of 27.25% is incorporated in the design of pavement. The
details of the CBR tests are incorporated in the annex of this report.

Figure 28: Load dial reading Vs. Penetration graph of sample 1

Figure 29: Load dial reading Vs. Penetration graph of sample 2

25

DESIGN OF PAVEMENT

8.1

General

Pavement design consists of design of sub-grade, sub-base, base and asphalt layers for each
section where the sub-surface conditions and traffic volume changes. Pavement design in Gokul
Marg is carried out based on the TRL Overseas Road Note 31. Basic parameters considered are
sub-grade CBR and Traffic Class.
Maximum use of existing pavement is made as the sub-grade for the pavement. The major
improvements recommended as follows:

8.2

As far as possible embankment is raised so that sub-grade level is above the natural
ground level by minimum of 0.5m.
Construct double lane of width 7meters DBSD with 1.4mSBSD shoulders on either side of
the carriageway from 0+000 to 1+350 and 7meters DBSD beyond 1+350.
Traffic Count Results and Projected ESAL

An Axle Load of 10.2 T is adopted for pavement design. This value when combined with the
projected traffic volume over the design period, determines the total predicted traffic loading the
road will carry over its design life. This is expressed in terms of millions of equivalent standard
axles.
Axle Load is considered 10.2 t for trucks. Unit Equivalent Factor of axle load for trucks are based
upon the 10.2t of axle load whereas, the unit equivalent axle load for other types of vehicles are
taken from the recent survey carried in other roads of similar terrain and geographical conditions.
The unit equivalent factors are listed in Table 5. The axle equivalent factor is computed using
the equation (axle load/8160)^4.5 recommended by TRL ORN 31. For the purpose of the
pavement design only commercial vehicles (bus, truck, minibus, mini truck and tractor) are
considered whereas traffic with un laden weights of less than 1.5 tones are not considered as the
damaging factors are negligible for light vehicles.
Table 5: Equivalent Standard Axle Load per unit
Type of
Mini
Truck
Bus
Vehicles
Truck
ESAL

2.73

0.97

0.90

Mini Bus
0.15

Tractor
0.20

26

Table 6: Computation of Equivalent Standard Axle Load and Projection


Date: 15/12/068, Wednesday
Road Link:
Name of Road:Gokul Marg

Location:Gokul Marg
Station:Pratibha Chowk
Seasonal variation Factor for the month of Chaitra: 0.89

Station no.:
Surveyed by:
Supervised by:

Volume of vehicles
Truck

Start Time, (hrs)

Bus

Multi Axle

Heavy

Light

Bia Axle

Mini

Micro

Total (a+b)
Equivalence factor

26
2.73
70.98

5
0.97
4.85

2
0.9
1.8

96
0.15
14.4

0
0
0

ESAL=

129.43

Daily ESAL at the end of construction

Car

Motorcycle

Utility
Vehicle

Tractor

Three
Wheeler

Rickshaw

Bullock
Cart

4W Drive/
Geep/Van

Power
Tiller

Bicycle

42
0
0

1073
0
0

0
0
0

170
0.2
34

0
0
0

3
0
0

0
0
0

132
0
0

17
0.2
3.4

1665
0
0

139.75

Design Parameters:
Design Traffic in terms of Equivalent Standard Axle Load:
F

=0.811Million Equivalent Standard Axle Load.


Design Life (n): 10 years
Annual Growth Rate (r): 7.5%
Vehicle Damage Factor (F): IRC guides us to use this value of 1.5 for Rolling/Plain terrain when there isless than 150 commercial
vehicles per day.
Lane Distribution Factor (D): for double lane, 75% traffic from both directions are used in design.
Initial traffic in the year of completion of construction (A)
Present Traffic in terms of commercial vehicles per day (P)
Total period of construction (x)

Hence, A=129.43*(1+.075) ^1
A=139.75 commercial vehicle per day.

27

8.3

Pavement Design

Pavement thicknesses are calculated depending upon the design parameters such as
site conditions, existing pavement, and sub-grade soaked CBR and Equivalent Standard
Axle Load (ESAL) value. The sub-grade strength was found to be 27.25% from lab test
of CBR value. The design traffic for 10 years design period is calculated to be 0.811
Million ESAL.
The pavement thickness design has been carried out primarily using the design
parameters in Chart 1 of TRL Road Note 31 page 52 and 53.
The resultant design thicknesses are presented in Table 7 below.

Table 7: Pavement Thickness Design


Design thickness in mm as per
Adopted
Road Section
Design Parameters
TRL ORN 31
Design
ESAL in
CBR for
SubTraffic Surface)
Base Sub-base
106
Pavement
From km To km
grade
Class
(mm)
(mm)
Design (%)
Class
0+000
2+500
27.25
0.811
S5
T3
DBSD
175
100

28

29

30

9.

HYDROLOGICAL INVESTIGATION

Gokul Marg as mentioned earlier in the report starts from Itabhatta Chowk in the south and ends
at Srijana Chowk, Girigaon in the north and its length is approximately 2.50 Kilometers. As the
road orientation is almost south to north and the length of the road is only 2.50 kilometers, there
are not many water courses over which the road crosses. There is only natural water course over
which a two span minor slab bridge is constructed.
There is no evidence of over flowing or breaching of the banks by the flood waters at the location
of existing double span minor bridge, and there is no evidence of flooding and problem of
inundation and water logging for long periods along the entire project area. Therefore, it is
assumed that no hydrological investigation is required. This is true in the sense that except the
Khola other places of drainage are so small that the catchment area is negligible and hence the
discharge.
Therefore, it has been concluded that there is no need of detailed hydrological investigation for
this road sub-project.
10.

CROSS DRAINAGE DESIGN

Control over seepage, groundwater and surface runoff is one of the most important aspects in
the construction of highways and roads. Physical properties of water make it highly destructive
material. It is nearly incompressible and it has no shear strength, therefore, it can penetrate into
most minute cracks and pores under pressure. This property of penetrating into minutest of
cracks and pores under pressure can exert tremendous force resulting into collapse of
structures, mountain slopes and erosion of the earth surface etc.
The purpose of design of drainage systems for the roads or highways is to manage the safe
passage of all types of water away from the road reserve. In spite of the destructive potential of
water forces, there are two fundamental methods used alone or in combination to protect the
road. These are:
I.
Seepage reducing method by lowering the quantities of seepage or diverting it from
places where in can cause harm.
II.
Drainage methods which safely allows the water through without allowing it to cause
damage.
Generally, for roads, water is managed through two types of structures;
1. Cross-Drainage structures
2. Side Drains along the entire length of road
Road side drains are constructed through out the length of the road where as, the cross drainage
structures are constructed, general at the places of existing natural gullies and at places where
the road has valley curves along its profile. Wet areas having high under ground water table may
be encountered at places along the road. These areas as well as other spots of seepages may
require special treatments for safe passage of water away from the road.
As mentioned above in the report, the only water course (Khola) has a minor two span slab
bridge over it. Other culverts are generally required for the irrigation channels. Valley curves
along the road profile do not need culverts as these curves lie in the embankments. Although the
present condition of the bridge is fair, it needs minor repair of its railings. The existing single lane
bridge seems to be sufficient for the present day traffic volume. Therefore, it is recommended
that there is no need of replacing the bridge for the design period of ten years.
However, it is assumed that about five numbers of 600 mm diameter pipe culverts have to be
built to facilitate the irrigation canals to cross the road from east to west or vice versa. These

31

culverts will be constructed at an equal intervals along the 2.5 kilometers of road. Pipe culverts of
size 600 mm diameter are recommended for crossing the irrigation channels. Smaller size pipe
culvert could be sufficient for the purpose but from maintenance point of view 600 mm diameter
pipes are preferred.
.

Bridge
location

Figure 30: Bridge Location in Gokul Marg

Figure 16: Existing Bridge and the Condition

32

11.

CONSTRUCTION METHODOLOGY

11.1

General

Construction methodology for different items of works is described below:

11.2

Widening of Road Formation where ever needed.


Construction of Granular Sub base
Construction of Granular Base Course
Construction of Double Surface Bituminous Treatment.
Widening of Road Formation

The formation level of the road is almost prepared except some improvement is needed to follow
the new design grade level. Since the road is to be constructed over already opened road,
centerline of the existing road has been followed wherever possible. The existing road in general
is constructed on Embankment fill. But in some places road is overtopped by the monsoon run
off. These particular locations are raised during geometric n such a way so that the top of
formation would be at least 500 mm above the normal flood level.
The existing ground needs to be cleaned of vegetation and other deleterious materials and
removed any unsuitable materials before preparation of foundation for embankment fill.
After removal of vegetation, top soil and deleterious materials, the foundation shall be leveled
and compacted to receive the embankment fill materials. The embankment will be prepared in
the entire width. Compaction shall be done properly with appropriate rollers to achieve the
density of each layer as per the requirement of specifications. If any weak spots are
encountered during the preparation of the sub-grade such spots would be specially treated. Any
unsuitable/detrimental material will be removed. The area will be compacted as far as
practicable and possible. Then a reasonable thickness of suitable material will be laid and
compacted to the required density. Following the treatment of weak spots as mentioned above
consecutive layers of fill material will be applied and prepared the sub-grade.
11.3

Construction of Granular Sub-base

The existing road is graveled. During design, efforts have been made to incorporate the existing
pavement materials as far as possible. In some critical locations where monsoon ran overtops
the existing road it has been raised. Sub-base materials shall be obtained from approved
sources in borrow or cut or from such other sources of supply as may be specified or approved
from time to time for use.
Gravel:
The grading of the material after placing and compaction shall be a smooth curve within and
approximately parallel to the envelope given in Table below:
Table 8: Grading Envelop for Gravel
Sieve Size (mm)
Percentage Passing by weight
63
100
40
70-100
20
50-85
10
40-75
4.75
30-60
2.36
20-45
1.18
15-35
0.075
4-15

33

Sands, Silty and Clayey Sands:


% passing 2 mm sieve : max 95%
% passing 0.075 mm sieve : min 10 max 30%
Plasticity Index : min 5 max 12%
Plasticity Modules : max 300%
All Materials
The new granular sub-base material to be used shall conform to sub-base specifications and
have a soaked CBR of not less than 30% after 4 days of soaking when compacted to 95% of
MDD with heavy compaction, a swell less than 1% and plasticity Index and organic content less
than 6% and 3% respectively. These materials are dumped on the finished sub-grade, spread,
watered, mixed, laid and compacted to the density mentioned above to complete the surface for
receiving the granular baser course.
11.4

Construction of Granular Base Course:

Granular base shall consist of crushed stone, free from clay, organic or other deleterious matter.
It shall comply with the physical requirements defined in Table below:
Table 9: Physical Requirements of Graded Crushed Stone

Where, B, C1 are different classes of materials.


The gradation of crushed stone for base material should comply according to the table below,
Table 10: Grading envelope for Graded Crushed stone base and sub-base

The minimum dry densities to be achieved as a percentage of the Maximum Dry Density (MDD)
determined in accordance with IS 2720 Part 8 shall be 98% of MDD for Base material.

34

11.5

Construction of Double Bituminous Surface Dressing/ Otta Seal

DBSD: When Base course is completed the surface shall be cleaned and applied the prime coat.
After completion of binder Curse, Single graded aggregate of designed specification shall be
applied followed by the other layer of single graded aggregate according to the specification and
thickness suggested by TRL ORN 32.
Ottaseal: When base course is completed the surface shall be cleaned and graded aggregate
shall be placed on a relatively thick film of comparatively soft binder which, on rolling and
trafficking, can work its way upwards through the aggregate interstices. In this manner, the
graded aggregate relies both on mechanical interlocking and bitumen binding for its strength a
bit like a bituminous premix. If this method of surfacing is selected, A guide to the use of Otta
Seals, publication number 93 by Norwegian Public Roads Administration is recommended to
follow.
12.

COST ESTIMATE:

12.1

Engineers Estimates

12.1.1 General Introduction


The Consultants JV have prepared an Engineers Cost Estimates and Bill of Quantities for the
Project Road. First of all one comprehensive Cost Estimate and Bill of Quantities is prepared.
The Engineers Estimates for the road construction and pavements works were prepared based
on an evaluation of the unit rates and quantities obtained from the preliminary designs and
inventory, costing has been carried out in the format using District Rates and Norms for Rate
analysis approved by the Government of Nepal, Ministry of Physical Planning and Works,
Department of Roads. The wages of local skilled and unskilled labor are based on approved
district wages rates. The cost of equipment includes, owning, running and maintenance and
equipment and cost for operators.
12.1.2 Unit Rates
Having established a breakdown of the items for inclusion in the Bill of Quantities an analysis
was undertaken to establish the unit rate for each item. It was recognized that these unit rates
would need to reflect the prevailing labor rates and materials. Prevailing Government rates for
manpower, and construction materials and DOR equipment rates were collected and compared
with the prevailing market prices in the District. The cost of equipment includes, owning, running
and maintenance and cost for the operation as well. For new items not included in the norms,
rates were developed by estimating the inputs of three basic components; labor, material and
equipment and applying the respective unit costs of inputs. For manufactured items, the costs
were based on local and Indian manufacturers/ suppliers/agents.
12.2

Quantities and Cost Estimates for Road Construction

The total estimated cost has been calculated by unit rate of individual items based on rate
analysis multiplied by quantities estimated from the design and drawings. The designs were
carried out by Software the SW_DTM and SW_ROADS prepared by a local company Softwel
(P.) Ltd. The design quantity calculation and total estimated construction cost of the Project
Road including VAT and Contingencies have been submitted.
The quantity estimate of the proposed facilities and appurtenant structures, has been prepared
based on plan, cross sections and profiles that are presented in Drawings. The major works
proposed in the project are outlined in Table 11 below:

35

Table 11: Adopted Abstract of Cost for 7m width DBST Carriage way and 1.4m width SBST
Shoulder both sides as per Nepal Urban Road Standard (Draft) incorporated with Nepal
Road Standard.
S.No.

Items Description

General

Site Clearance

Earthwork

Pavement Work

Bituminous Work

Retaining or Breast Wall

Water Management

Road Furniture and Traffic Safety Measures

Bio-engineering Works

10
A
B
C
D
E

Provisional Sums
Grand Total Amount

Add10% Contingencies (10% of A)


Total amount with Contingencies (A+B)
Add 13% Value added Tax (VAT) (13% of A)
Total Amount inclusive of Contingencies and VAT (C+D)
Hence, Estimated Cost per Km section of the Road

Unit
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.
NRs.

Amount

Remarks

442,524.68
445,263.68
6,125,287.91
17,504,794.10
15,123,322.53
107,257.56
588,341.30
55,361.54
21,089.70
250,000.00
40,663,243.00
4,066,324.30
44,729,567.30
5,286,221.59
50,015,788.89
19,454,507.89

36