Sunteți pe pagina 1din 6

[Type text]

POWER TRANSFORMER
INDUCE TEST
APPROVED BY:

DOCUMENT
ISSUED DATE
PAGE
1 of 8

REVISION

TABLE OF CONTENTS
No.

Descriptions

Page

TABLE OF CONTENS

TITLE

SCOPE

OBJECTIVE

REFERENCE

RISK AND SAFETY PRECAUTION

TEST ITEMS

TEST PROCEDURE

TEST FORM

7-8

POWER TRANSFORMER
[Type text]

DOCUMENT

[Type text]

INDUCE TEST
APPROVED BY:

1.

2.
3.

ISSUED DATE
PAGE
2 of 8

REVISION

TITLE
TRANSFORMER WITHSTAND TEST
SCOPE

TRANSFORMER INDUCE TEST

OBJECTIVE
This is to assure that the requirements of electrical individual test works are
meets the codes requirements and contract specifications. To make sure, the
works are carried out in acceptable workmanship and follow the requirements in
the quality manual.

4.

REFERENCE
4.1 Reference Manual
4.2 Applicable Manufacturers Manuals/Standards
4.3 Contract Specifications and Construction Drawing
4.4

Standard for hand-over test of electric equipment electric equipment


installation engineering ( GB Standard 50150-2006 ).

4.5 Transformer JEAC-5001-84


5.

RISK AND SAFETY PRECAUTION


5.1 Everyone must wear safety helmet when come into construction site and tie
safety belt when work at height.
5.2

High voltage testing area should be circled by rail with warning board and
make special person to watch.

DOCUMENT

POWER TRANSFORMER
INDUCE TEST
APPROVED BY:
CHIEF ENGINEER

5.3

PAGE
3 of 8

REVISION

If happen anything abnormal, the testing must be stopped, and strengthen


test warding.

[Type text]

ISSUED DATE

[Type text]

5.4

Clean all tools and instruments, prevent something to leave on instrument


after test; if some wires are changed, it need be restored after test.

6.

TRANSFORMER TEST ITEM


6.1 Visual Inspection
6.2 Insulation resistance test
6.3 Transformer Induce Test
6.4 Secondary winding Withstand test
6.5 Primary neutral point withstand test

7.

TRANSFORMER TEST PROCEDURE


7.1

Visual Inspection

7.1.1 Check the nameplate of Transformer is identical or not


7.1.2 Check oil level, has been filled to transformer and conservator of
main tank and OLTC
7.1.3 Check grounding connection good or not
7.1.4

Transformer must be freely from external connection, primary and


secondary connection.

7.2.4 Insulation resistance


- Use 5000V insulation resistance tester, record the environment temperature
and moisture while measuring, the value should be not less than 1M/kilo
Volt in normal temperature condition.

POWER TRANSFORMER
INDUCE TEST
APPROVED BY:

DOCUMENT
ISSUED DATE
PAGE
4 of 8

REVISION

- PI value of the machine = 10 minute / 1 minute value.


( PI value shall not less than 1.2 and the unballance result value
of each phase must not more than twist / 2x ).
-

7.3
[Type text]

Insulation resistance must be measured before and after applied voltage test.
Power Frequency Induce Test

[Type text]

7.3.1` Precaution

7.3.2

Transformer oil in good condition.


Insulation resistance of the all winding must have value

1M/kiloVolt or more and have IP 1.2 or more.


During testing, excitation current must be constant.
OLTC on highest voltage tap position

Induce test Voltage ( Specification )


Test Voltage

0,64 x Highest Voltage Tap

Test Frequency

50 Hz

Test Duration

15 minute

kV

Test Voltage

15 minute

7.3.3 Application / Test circuit

Time duration
TRANSFORMER UNDER TEST

Test set

LV

HV
A

Trafo Step up
400 V / 20 kV

Power
input

c
Trafo Regulator
0 - 240 V/ 2 X 30 kVA

V Test

kV
meter

Vin
Amp

V Test = 0,64 Vp-p Tap 1

POWER TRANSFORMER

DOCUMENT

INDUCE TEST
APPROVED BY:

PAGE
7 of 8

Test Form.
TRANSFORMER AC VOLTAGE WITHSTAND TEST

Power Plan/Substation

: Tanjung Priok ( Pelindo )

Equipment

: Power Transformer

Number of Unit

: ....

[Type text]

REVISION

[Type text]

Manufacture

: Unindo

Model / Type

Power Rating

: 60 MVA

Operating Voltage

: 150 kV / 20kV

Nominal current

Cooling system

: ONAF

Serial Number

Year

: 20

Amp

HV Wind Ins Level :

kV

HV neutral Ins Level :

kV

Induce test
Test Point

TEST VOLTAGE ( kV )

Time

TEST RESULT

Durantion
R phase

107

15 minute

S phase
T phase

DOCUMENT

POWER TRANSFORMER
INDUCE TEST

ISSUED DATE

APPROVED BY:

PAGE
8 of 8

REVISION

INSULATION RESISTANCE (BEFORE APPLIED VOLTAGE TEST)


Meausere Point

INSULATION RESISTANCE ( M )
15 Second

60
second

HV LV
HV - TV
[Type text]

10 minute

Absorbtion

PI

R1/R15

R10/R1

REMARK

[Type text]
HV - Ground
LV - Ground
TV - Ground
LV - TV

Remark :
INSULATION RESISTANCE (AFTER APPLIED VOLTAGE TEST)
Meausere Point

INSULATION RESISTANCE ( M )
15 Second

60

10 minute

Absorbtion

PI

R1/R15

R10/R1

REMARK

second
HV LV
HV - TV
HV - Ground
LV - Ground
TV - Ground
LV - TV

Remark :

Tested by

Signature

Name
Date

[Type text]

Witneesed by

Supervised by