Concept to Completion
Best Practice in Delivering Complex Projects
Building Confidence
O&M
Best
Practice
Project
Delivery
Expertise
World
Leading
Technology
Study
FEED
EPCm
PMC
Services
Upstream
Oil & Gas
LNG
& Midstream
Refining
Chemicals &
Petrochemicals
Environmental
Power
FEED
EPCm
PMC
Services
Upstream
Oil & Gas
LNG
& Midstream
Refining
Chemicals &
Petrochemicals
Environmental
Power
400,000 bpsd
1,300 ktpa
300 ktpa
2,300 ktpa
John Payne
Chief Static Equipment Engineer
Safety
Operational reliability
Minimum turnaround time and risk to schedule
Lowest possible cost
Take advantages of process improvements
SO MUST
FCC Turnarounds
What are the Key Drivers?
FCC Turnarounds
Significant Revenue and Margin Implications
Lost revenue is $1 million to $2 million per day when not operating
Typical turnaround time is 35 days or fewer
Run times have grown from 3 to 5/6 years continuous so need to
plan earlier and predict operational reliability a lot further ahead
10
Client Needs
Process /
Technology
Improvements
Maintenance
Requirement
Feasible Options
Licensor
Selection
Cost Estimate
Engineering &
Construction
Planning TAR
Duration
Risk / What-if
Analysis
Conclusion &
Execution Strategy
Foster Wheeler. All rights reserved.
11
3 Years
6 Months
Study
3-6 Months
Licensor
3 Months
Equipment
Procurement
18 Months
Equipment
Delivery
Min
3 Months
Pre-TAR
TAR
12
13
14
12 pairs of cyclones
Cyclones interlinked and
share secondary hangers
Full trial assembly of
cyclones
at fabricators works
Precision survey of hangers
Data used to position
hanger nozzles in head
Alignment blocks on
cross-overs
15
Use of electronic 3D
solid edge model
Demonstrates
clearances, access and
future maintenance
Input into FEA analysis
16
Cyclone assembly in
transport CAN leaving
fabricators work
Module weight 265te
+15m diameter
Height restriction on
canal of 12m
17
18
19
Head module on
route from dock to
Refinery
Motorway closure
Probably the
largest head &
cyclone assembly
to be transported
to site as one
piece
Movement date of
24 March 2013
set 2 years in
advance
20
Tree pruning
done one year
in advance
21
Head assembly
being transport
through refinery
New site entrance
created
Head assembly
now jacked up to
clear piping either
side of road
22
Final site
assembly
Head assembly
being lifted onto
Dip Leg frame
23
Skid Bridge 35m Long over pipe band allows complete head
frame assembly to be moved from off plot location to crane
24
25
Regenerator Cyclones End of Life, Replace Cyclones complete with Head is normal
Extremely Tight Plot Space and Route Restrictions
Come up with split head frames
Main Crane Remained the problem space and undergrounds
26
Sequence
Install Beams to support cyclones
Secure cyclones at top
Cut and remove head
Remove cyclones as pairs
Replace in reverse order
27
28
29
30
Further
information:
www.fwc.com
refining@fwc.com
www.fwc.com