BOQ 3
H.S.R.
ITEM
No.
3.1
DESCRIPTION
3.4
ST-055
3.5
3.6
3.7
3.8
3.9
AMOUNT
m3
132.00
### 174,240.00
Cu.m
203.00
### 224,518.00
m3
9.00
###
16,992.00
kg
###
236.00 311,048.00
kg
###
230.00 255,300.00
m2
494.00
463.00 228,722.00
m2
498.00
### 498,996.00
m3
64.00
###
###
No
18.00
###
27,198.00
No
18.00
46.00
828.00
m3
13.00
741.00
9,633.00
Provisional sum
350,000.00
###
District :- Kandy
Divisional Secretary Area :- Pathahewahata
E.E.Division :- Kandy
ITEM
DESCRIPTION
ITEM
TOTAL
In Rs.
AMOUNT In Rs.
NO
This estimate provides for all labour, Meterial,
1
2
2,578,190.78
2,950,331.09
2,760,909.25
.
Class of road
:Total
Platform Width
Carriage way
Length Of Road
:::-
Transport of metal
:- 40km
Transport of Sand :80Km
Transport of Cement :- 10.0Km
Transport of soil
:-
02.0km
3
4
8,289,431.12
2,552,850.00
158,309.25
11,000,590.37
550,029.52
1,320,070.84
19,309.27
12,890,000.00
11,000,590.37
Head Office :-
Checked by :Name
:Designation :Signature :-
Checked by :Name
:Designation :Signature :- ..
E.E.Division :-Kandy
ITEM
DESCRIPTION
TOTAL
ITEM
In Rs.
NO
This estimate provides for all labour, Meteria 1
Tools transport expenses necessary for the 2
AMOUNT In Rs.
3,023,765.25
3,433,315.35
:::-
Total
3
4
Transport of metal
:- 40 km
5
6
Transport of sand
:- 80 km
Transport f Soil
:- 2 km
Transport of Cement
:- 10 km
allow
allow
allow
allow
for
for
for
for
6,457,080.60
2,552,850.00
158,309.25
VAT - (12%)
overserages & travelling expences &
Administration charges (5%)
Contingencies - ( sum)
2,711,159.25
9,168,239.85
774,849.67
458,411.99
98,498.49
1,331,760.15
10,500,000.00
Divisional Office
Head Office :-
Prepared by :Name
:- Sgd.M.K.Samarasekara
Designation
:- T.O.
Signature
:-
Checked by :Name
:- Sgd.N.G.D.Muthunayake
Designation :- T.O.
Signature
:-
Checked by :Name
:- W.G.Ranaweera
Designation :- T.O.
Signature
:- ..
Checked by :Name
:Designation
:- T.O.
Signature
:-
Recommended by:Name
:- R.A.Sirisena
Designation :- Office Engineer
Signature :-
Approved :Name
:- A.M.M.Faleel
Designation :- General Manager (P.R.D.A.)
Signature :-
From 0+000-2+000 km
Summary
B.O.Q 1 Item No.1.1 to 1.13
B.O.Q 2 Item No.2.1 to 2.13
Rs
Signature of Tenderer.............................................................................................................
Seal
Name of Tenderer..................................................................................................................
Address of Tenderer...............................................................................................................
VAT No ....................................................................
(If available)
Witness
1. Signature :...............................................
2. Signature : .....................................
file:///var/www/apps/conversion/tmp/scratch_3/263531468.xls
NT OF KOLABISSA - PATTIYAGAMA
rom 0+000-2+000 km
file:///var/www/apps/conversion/tmp/scratch_3/263531468.xls
Original / Duplicate
Duplicate
Issued to Mr./Mrs. ....................................................................................................................
Address : ........................................................................................................................................
..............................................................................
Receipt. No. of REFUNDABLE tender deposit : .......................................................................
Receipt. No. of NON REFUNDABLE tender fee : ......................................................................
IMPROVEMENT OF KOLABISSA - PATTIYAGAMA
From 0+000-1+000 km
BOQ1
ITEM
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
HSR
QUANTI
DESCRIPTION
UNIT
NO.
TY
MS-023 Cleaning medium Jungle Including
Removing High Growing Plants and Trees
of Girth < 300 mm other than those
designated to remain. by Uprooting or by
Cutting and then uprooting the Stumps or
Km
1.00
by Cutting only as Directed
E1-027 Roadway Excavation in Unclassified Soil
Using Machinery including Loading and
Piling (Cutting Measurement) & transport
m3
95.00
Scarifying
Road
Surface
to
50
mm
Depth
M1-003
by roller, Screen, & Replace Old
890.00
m2
Aggregate.
S1Tack Coat with 30% Cut Back Bitumen
018A
Using 0.5 ltr/Sq.m Including Brushing and
Cleaning Road Surface (Manual)
Department bitumen
(incl.transport)
###
m2
M1-013 Dense Graded Agg.Base [ABC],
Spreading Watering and Compacting
Graded 37.5mm Aggregate to form a
Dense Aggregate Base in Strips, Av Width
not exceeding 1.2m for Road Widening
incl Transport of Aggregate(Loose
93.00
m3
Volume) [SSCM 405.1 -.4]
A1-018 Piling Available Aggregate
A1-010 37.5 mm Aggregate, Single Size Crusher
Production Including Piling , Loading &
transport[SSCM 404.1-406.1 : Table 17014
A1-011 19 mm Aggregate, Single Size Crusher
Production Including Piling , Loading &
transport [SSCM 404.1-406.1 ]
M1-004 Spreading & Compaction 50-19 mm New
Aggregate by Roller Including Watering
Hire, Etc. (Loose Volume) [SSCM 403.3(c)]
S1001A
m3
93.00
m3
275.00
m3
28.00
m3
303.00
m2
###
file:///var/www/apps/conversion/tmp/scratch_3/263531468.xls
RATE
AMOUNT
ITEM
HSR
NO.
S1008A
DESCRIPTION
1.12
1.13
1.11
UNIT
QUANTI
TY
m2
###
Barrels
Day
RATE
AMOUNT
79.00
1.00
Total
2.2
2.3
2.4
2.5
2.8
2.9
2.10
H.S.R.
DESCRIPTION
UNIT QUANTITY RATE
No.
MS-023 Cleaning medium Jungle Including
Removing High Growing Plants and Trees
of Girth < 300 mm other than those
designated to remain. by Uprooting or by
Cutting and then uprooting the Stumps or
Km
1.00
by Cutting only as Directed
Reducing
High
Sides
in
Medium
Soil
MS-035
(incl.transport)
m3
27.00
Scarifying
Road
Surface
to
50
mm
Depth
M1-003
by roller, Screen, & Replace Old
m2
###
Aggregate.
Tack
Coat
with
30%
Cut
Back
Bitumen
S1-018A
Using 0.5 ltr/Sq.m Including Brushing and
Cleaning Road Surface (Manual)
m2
###
Department bitumen
Dense
Graded
Agg.Base
[ABC],
M1.013
Spreading Watering and Compacting
Graded 37.5mm Aggregate to form a
Dense Aggregate Base in Strips, Av Width
not exceeding 1.2m for Road Widening
incl Transport (Loose Volume) [SSCM
m3
188.00
405.1 -.4]
37.5
mm
Aggregate,
Single
Size
Crusher
A1-010
Production Including Piling , Loading &
transport [SSCM 404.1-406.1 : Table
268.00
m3
1701-4
A1-011 19 mm Aggregate, Single Size Crusher
Production Including Piling , Loading &
transport [SSCM 404.1-406.1 ]
m3
27.00
M1-004 Spreading & Compaction 50-19 mm New
Aggregate by Roller Including Watering
Hire, Etc. (Loose Volume) [SSCM 403.3(c)]
m3
295.00
m2
###
m2
###
file:///var/www/apps/conversion/tmp/scratch_3/263531468.xls
AMOUNT
ITEM
2.13
HSR
NO.
DESCRIPTION
Transport of Empty Barrels
UNIT
Barrels
QUANTI
TY
76.00
TOTAL
file:///var/www/apps/conversion/tmp/scratch_3/263531468.xls
RATE
AMOUNT
Section 1- Transport
See Section 1 of General Notes for Selection of Mode of Transport
Item No
Description
Unit
T1-001
Cu.m
T1-002
Cu.m
T1-003A
Cu.m
T1-003B
Cu.m
T1-003C
Cu.m
TM-2
Cu.m
TM-3
Cu.m
TM-4
Cu.m
TM-5
Cu.m
TM-6
Cu.m
TM-7
Cu.m
TM-8
Cu.m
TM-9
Cu.m
TM-10
Cu.m
TM-11
Cu.m
TM-12
Cu.m
TM-13
Cu.m
TM-14
Cu.m
TM-15
Cu.m
TM-16
Cu.m
TM-17
Cu.m
TM-18
Cu.m
TM-19
Cu.m
TM-20
Cu.m
TM-21
Cu.m
TM-22
Cu.m
TM-23
Cu.m
TM-24
Cu.m
TM-25
Cu.m
TM-26
Cu.m
TM-27
Cu.m
TM-28
Cu.m
TM-29
Cu.m
TM-30
Cu.m
TM-31
Cu.m
TM-32
Cu.m
TM-33
Cu.m
TM-34
Cu.m
TM-35
Cu.m
TM-36
Cu.m
TM-37
Cu.m
TM-38
Cu.m
TM-39
Cu.m
TM-40
Cu.m
TM-45
Cu.m
TM-50
Cu.m
TM-55
Cu.m
TM-60
Cu.m
TM-65
Cu.m
TM-70
Cu.m
TM-75
Cu.m
TM-80
Cu.m
TM-85
Cu.m
TM-90
Cu.m
TM-95
Cu.m
TM-100
Cu.m
TM-110
Cu.m
TM-120
Cu.m
TM-130
Cu.m
TM-140
Cu.m
TM-150
Cu.m
TM-160
Cu.m
TB-1
BrlKm
TB-2
BrlKm
TB-3
BrlKm
TB-4
BrlKm
TB-5
BrlKm
TB-6
BrlKm
TB-7
BrlKm
TB-8
BrlKm
TB-9
BrlKm
TB-10
BrlKm
TB-11
BrlKm
TB-12
BrlKm
TB-13
BrlKm
TB-14
BrlKm
TB-15
BrlKm
TB-16
BrlKm
TB-17
BrlKm
TB-18
BrlKm
TB-19
BrlKm
TB-20
BrlKm
TB-21
BrlKm
TB-22
BrlKm
TB-23
BrlKm
TB-24
BrlKm
TB-25
BrlKm
TB-26
BrlKm
TB-27
BrlKm
TB-28
BrlKm
TB-29
BrlKm
TB-30
BrlKm
TB-31
BrlKm
TB-32
BrlKm
TB-33
BrlKm
TB-34
BrlKm
TB-35
BrlKm
TB-36
BrlKm
TB-37
BrlKm
TB-38
BrlKm
TB-39
BrlKm
TB-40
BrlKm
TB-45
BrlKm
TB-50
BrlKm
TB-55
BrlKm
TB-60
BrlKm
TB-65
BrlKm
TB-70
BrlKm
TB-75
BrlKm
TB-80
BrlKm
TB-85
BrlKm
TB-90
BrlKm
TB-95
BrlKm
TB-100
BrlKm
TB-110
BrlKm
TB-120
BrlKm
TB-130
BrlKm
TB-140
BrlKm
TB-150
BrlKm
TB-160
BrlKm
TEB-1
BrlKm
TEB-2
BrlKm
TEB-3
BrlKm
TEB-4
BrlKm
TEB-5
BrlKm
TEB-6
BrlKm
TEB-7
BrlKm
TEB-8
BrlKm
TEB-9
BrlKm
TEB-10
BrlKm
TEB-11
BrlKm
TEB-12
BrlKm
TEB-13
BrlKm
TEB-14
BrlKm
TEB-15
BrlKm
TEB-16
BrlKm
TEB-17
BrlKm
TEB-18
BrlKm
TEB-19
BrlKm
TEB-20
BrlKm
TEB-21
BrlKm
TEB-22
BrlKm
TEB-23
BrlKm
TEB-24
BrlKm
TEB-25
BrlKm
TEB-26
BrlKm
TEB-27
BrlKm
TEB-28
BrlKm
TEB-29
BrlKm
TEB-30
BrlKm
TEB-31
BrlKm
TEB-32
BrlKm
TEB-33
BrlKm
TEB-34
BrlKm
TEB-35
BrlKm
TEB-36
BrlKm
TEB-37
BrlKm
TEB-38
BrlKm
TEB-39
BrlKm
TEB-40
BrlKm
TEB-45
BrlKm
TEB-50
BrlKm
TEB-55
BrlKm
TEB-60
BrlKm
TEB-65
BrlKm
TEB-70
BrlKm
TEB-75
BrlKm
TEB-80
BrlKm
TEB-85
BrlKm
TEB-90
BrlKm
TEB-95
BrlKm
TEB-100
BrlKm
TEB-110
BrlKm
TEB-120
BrlKm
TEB-130
BrlKm
TEB-140
BrlKm
TEB-150
BrlKm
TEB-160
BrlKm
TCE-0.5-1
Transport of cement
Unloading)
up to 0- 1.0km
TCE-1
Transport of cement
Unloading)
up to
1.0km
TCE-2
Transport of cement
Unloading)
up to
2.0km
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
TCE-3
Transport of cement
Unloading)
up to
3.0km
TCE-4
Transport of cement
Unloading)
up to
4.0km
TCE-5
Transport of cement
Unloading)
up to
5.0km
TCE-6
Transport of cement
Unloading)
up to
6.0km
TCE-7
Transport of cement
Unloading)
up to
7.0km
TCE-8
Transport of cement
Unloading)
up to
8.0km
TCE-9
Transport of cement
Unloading)
up to
9.0km
TCE-10
Transport of cement
Unloading)
up to
10.0km
TCE-11
Transport of cement
Unloading)
up to
11.0km
TCE-12
Transport of cement
Unloading)
up to
12.0km
TCE-13
Transport of cement
Unloading)
up to
13.0km
TCE-14
Transport of cement
Unloading)
up to
14.0km
TCE-15
Transport of cement
Unloading)
up to
15.0km
TCE-16
Transport of cement
Unloading)
up to
16.0km
TCE-17
Transport of cement
Unloading)
up to
17.0km
TCE-18
Transport of cement
Unloading)
up to
18.0km
TCE-19
Transport of cement
Unloading)
up to
19.0km
TCE-20
Transport of cement
Unloading)
up to
20.0km
TCE-21
Transport of cement
Unloading)
up to
21.0km
TCE-22
Transport of cement
Unloading)
up to
22.0km
TCE-23
Transport of cement
Unloading)
up to
23.0km
TCE-24
Transport of cement
Unloading)
up to
24.0km
TCE-25
Transport of cement
Unloading)
up to
25.0km
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
TCE-26
Transport of cement
Unloading)
up to
26.0km
TCE-27
Transport of cement
Unloading)
up to
27.0km
TCE-28
Transport of cement
Unloading)
up to
28.0km
TCE-29
Transport of cement
Unloading)
up to
29.0km
TCE-30
Transport of cement
Unloading)
up to
1.0km
TCE-31
Transport of cement
Unloading)
up to
31.0km
TCE-32
Transport of cement
Unloading)
up to
32.0km
TCE-33
Transport of cement
Unloading)
up to
33.0km
TCE-34
Transport of cement
Unloading)
up to
34.0km
TCE-35
Transport of cement
Unloading)
up to
35.0km
TCE-36
Transport of cement
Unloading)
up to
36.0km
TCE-37
Transport of cement
Unloading)
up to
37.0km
TCE-38
Transport of cement
Unloading)
up to
38.0km
TCE-39
Transport of cement
Unloading)
up to
39.0km
TCE-40
Transport of cement
Unloading)
up to
40.0km
TCE-45
Transport of cement
Unloading)
up to
45.0km
TCE-50
Transport of cement
Unloading)
up to
50.0km
TCE-55
Transport of cement
Unloading)
up to
55.0km
TCE-60
Transport of cement
Unloading)
up to
60.0km
TCE-65
Transport of cement
Unloading)
up to
65.0km
TCE-70
Transport of cement
Unloading)
up to
70.0km
TCE-75
Transport of cement
Unloading)
up to
75.0km
TCE-80
Transport of cement
Unloading)
up to
80.0km
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
TCE-85
Transport of cement
Unloading)
up to
85.0km
TCE-90
Transport of cement
Unloading)
up to
90.0km
TCE-95
Transport of cement
Unloading)
up to
95.0km
TCE-100
Transport of cement
Unloading)
up to
100.0km
TCE-110
Transport of cement
Unloading)
up to
110.0km
TCE-120
Transport of cement
Unloading)
up to
120.0km
TCE-130
Transport of cement
Unloading)
up to
130.0km
TCE-140
Transport of cement
Unloading)
up to
140.0km
TCE-150
Transport of cement
Unloading)
up to
150.0km
TCE-160
Transport of cement
Unloading)
up to
160.0km
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
Bags(50kgs)
50kgs
TST-1
50kgs
TST-2
50kgs
TST-3
50kgs
TST-4
50kgs
TST-5
50kgs
TST-6
50kgs
TST-7
50kgs
TST-8
50kgs
TST-9
50kgs
50kgs
TST-11
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
50kgs
TLH-.5-1
Lm.Km
TLH-1
Lm.Km
TLH-2
Lm.Km
TLH-3
Lm.Km
TLH-4
Lm.Km
TLH-5
Lm.Km
TLH-6
Lm.Km
TLH-7
Lm.Km
TLH-8
Lm.Km
TLH-9
Lm.Km
TLH-10
Lm.Km
TLH-11
Lm.Km
TLH-12
Lm.Km
TLH-13
Lm.Km
TLH-14
Lm.Km
TLH-15
Lm.Km
TLH-16
Lm.Km
TLH-17
Lm.Km
TLH-18
Lm.Km
TLH-19
Lm.Km
TLH-20
Lm.Km
TLH-21
Lm.Km
TLH-22
Lm.Km
TLH-23
Lm.Km
TLH-24
Lm.Km
TLH-25
Lm.Km
TLH-26
Lm.Km
TLH-27
Lm.Km
TLH-28
Lm.Km
TLH-29
Lm.Km
TLH-30
Lm.Km
TLH-31
Lm.Km
TLH-32
Lm.Km
TLH-33
Lm.Km
TLH-34
Lm.Km
TLH-35
Lm.Km
TLH-36
Lm.Km
TLH-37
Lm.Km
TLH-38
Lm.Km
TLH-39
Lm.Km
TLH-40
Lm.Km
TLH-45
Lm.Km
TLH-50
Lm.Km
TLH-55
Lm.Km
TLH-60
Lm.Km
TLH-65
Lm.Km
TLH-70
Lm.Km
TLH-75
Lm.Km
TLH-80
Lm.Km
TLH-85
Lm.Km
TLH-90
Lm.Km
TLH-95
Lm.Km
TLH-100
Lm.Km
TLH-110
Lm.Km
TLH-120
Lm.Km
TLH-130
Lm.Km
TLH-140
Lm.Km
TLH-150
Lm.Km
TLH-160
Lm.Km
TSH-.5-1
Lm.Km
TSH-1
Lm.Km
TSH-2
Lm.Km
TSH-3
Lm.Km
TSH-4
Lm.Km
TSH-5
Lm.Km
TSH-6
Lm.Km
TSH-7
Lm.Km
TSH-8
Lm.Km
TSH-9
Lm.Km
TSH-10
Lm.Km
TSH-11
Lm.Km
TSH-12
Lm.Km
TSH-13
Lm.Km
TSH-14
Lm.Km
TSH-15
Lm.Km
TSH-16
Lm.Km
TSH-17
Lm.Km
TSH-18
Lm.Km
TSH-19
Lm.Km
TSH-20
Lm.Km
TSH-21
Lm.Km
TSH-22
Lm.Km
TSH-23
Lm.Km
TSH-24
Lm.Km
TSH-25
Lm.Km
TSH-26
Lm.Km
TSH-27
Lm.Km
TSH-28
Lm.Km
TSH-29
Lm.Km
TSH-30
Lm.Km
TSH-31
Lm.Km
TSH-32
Lm.Km
TSH-33
Lm.Km
TSH-34
Lm.Km
TSH-35
Lm.Km
TSH-36
Lm.Km
TSH-37
Lm.Km
TSH-38
Lm.Km
TSH-39
Lm.Km
TSH-40
Lm.Km
TSH-45
Lm.Km
TSH-50
Lm.Km
TSH-55
Lm.Km
TSH-60
Lm.Km
TSH-65
Lm.Km
TSH-70
Lm.Km
TSH-75
Lm.Km
TSH-80
Lm.Km
TSH-85
Lm.Km
TSH-90
Lm.Km
TSH-95
Lm.Km
TSH-100
Lm.Km
TSH-110
Lm.Km
TSH-120
Lm.Km
TSH-130
Lm.Km
TSH-140
Lm.Km
TSH-150
Lm.Km
TSH-160
Lm.Km
T1-006
Cu.mkm
T1-007A
Cu.mkm
T1-007B
Cu.mkm
T1-009
TonKm
T1-010A
BrlKm
T1-010B
BrlKm
T1-010C
BrlKm
T1-010E
BrlKm
T1-010F
BrlKm
T1-010G
BrlKm
Brls
Brls
Brls
T1-013
Brls
T1-014
Brls
T1-015A
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
T1-024A
T1-027A
T1-030A
T1-033A
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
L.mkm
T1-036
No
T1-037
No
T1-038
No
T1-039
No
T1-040
No
T1-041
No
T1-042
No
T1-043
L.mKm
T1-044
L.mKm
T1-045
L.mKm
T1-046
L.mKm
T1-047
No.km
T1-048
Transport of Emulsion
T1-049
No km
TRO-25
No
TRO-30
No
TRO-35
No
TRO-40
No
TRO-45
No
TRO-50
No
km
T1- 050A
100ltr km
1 bags(50kg)
1 bags(50kg)
T1- 051B
50kg
50kg
T1- 052B Transport of steel each Subsequent 1.0 km to 9.0 km by any means
50kg
Section 2- Exacavation
Roadway Excavation ( Including Loading ,Unloading and Transport within 25 meters Distance
Unless Otherwise Specified)
Item No Description
Unit
Cu.m
Cu.m
Cu.m
Cu.m
E1-007 Excavation
301.2(VII)]
Cu.m
Measurement)
[SSCM
[SSCM
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Description
Unit
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
A1-014 Crusher Fines 6.3 mm Down, Including Piling and Loading for
1.0 cu.m
A1-014A Crusher Fines
cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Unit
EW-001 Approved Soil (Type I & II Materials) Excavation for Bases &
Shoulder Construction Including Loading and Piling (Loose
[SSCM
601.4]Including
transport
of material.
EW-002 Volume)
Spreading
Piled Approved
Soil (Loose
Volume)
Cu.m
Cu.m
EW-003 Approved Soil Spread & Rolled Including Roller Hire Charges,
Fuel & Watering (Loose Volume) [SSCM 601.1 - 4]
EW-003A Approved Soil Spread & Rolled Using Machinery Including Motor
Grader & Roller Hire Charges, fuel & Watering (Loose Volume)
601.1
4]
EW-004 [SSCM
Approved
Soil- Spread
& Rolled in Strips Where Average Width
is less than 1.2 meters for Road Widening including Roller Hire
& Watering
Volume) [SSCM
601.1 - Behind
4]
EW-006 Charges,
Approved fuel
Soil
Spread (Loose
& Compacted
in Places
Abutments and Structures, Shoulders about Sub Bases level
in Service
Trenches,
Using 1/2into150
1 Ton
EW-007 and
Approved
Soil line
Spread
& Compacted
to Vibrating
225 mm Roller
Thick
Including
Watering
(Loose
Volume)
[SSCM
601.1
- 4]
Layers Using Machine Rammer at Narrow Places
(Loose
EW-008 Volume)
Spreading , Leveling and Compacting Manually Using Standard
Cast Iron Stamper or Equivalent and Filling in 150-225 mm
Layers,(Loose
Volume)and
EW-009 Thick
Trimming
Leveling
Compaction
of
Original
Ground/Subgrade to 100 % STD Density [SSCM 304.3(c)]
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Sq.m
EW-010 Trimming
,
Leveling
and
Compaction
of
Original
Ground/Subgrade to 95 % STD Density [SSCM 304.3(c)]
Sq.m
Cu.m
Cu.m
Cu.m
Cu.m
Unit
P1-001
Sq.m
P1-002
Sq.m
P1-003
Sq.m
P1-004
Sq.m
Description
Unit
Cu.m
Cu.m
Sq.m
Sq.m
Cu.m
Cu.m
Sq.m
Sq.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Description
S1-001 Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with
Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
S1-001A Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with
Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1] (department
including T.P.
Sand
S1-002 Bitumen
Bitumen )Surfacing
1St of
Coat
using 2ltr/Sq.m including Blinding
with Gravel where Sand is not Available within 16km.
S1-002A Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding
with Gravel where Sand is not Available within 16km.
(Department
Bitumen)Surface Treatment with Hot Bitumen
S1-003 Double
Bituminous
(Manual) including Internal Transport (Binder and Aggregate
505.1-.5
and with
TableHot
505.1]
S1-004 Paid
SingleSeparately)
Bituminous[SSCM
Surface
Treatment
Bitumen (Manual,
Unit
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
S1-018A Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)
bitumen
S1-019 Department
Tack Coat with
30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)
S1-020 Tack Coat with 30% Cut Back Bitumen Using 0.75 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual) [SSCM
S1-021 503.4(d)]
Rolling over Blinding Material Spread over Subsequent Bitumen
Surfacing using diesel Roller (8-10 Tones) [SSCM 503.4(d)]
S1-022 Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1
Ltr/Sq.m Including Blinding with Sand at The Rate of 250
Cleaning
and Moistening
Road
S1-022A Sq.m/Cu.m
Prime Coat and
with Brushing
Emulsion/Cold
Bitumen(CSS-1)
Using
1
Surface
Ltr/Sq.m Part A of Item S1-022
S1-022B Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1
Ltr/Sq.m Part B of Item S1-022
Sq.m
Sq.m
Sq.m
Sq.m
ltr
Sq.m
Sq.m
ltr
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
S1-025 Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
without
Blinding but Inclusive Brushing, Cleaning and
Mostening
Road
Surface
S1-026 Sweeping Over Tarred
Surface to Arrest Bleeding.
Sq.m
Sq.m
ltr
S1-028 Blinding the Bitumen Surfacing with Sand at the rate of 125
Sq.m1 Cu.m Using Material from Stock Pile
Sq.m
Sq.m
Sq.m
M.ton
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
M.ton
Sq.m
Sq.m
Description
MN-001 Patching with Hot Bitumen Using 14 Liters per 1/2 km (SSCM
1102.1-3)
Unit
km
MN-002 Patching With hot Bitumen Using 21 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-003 Patching With hot Bitumen Using 28 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-004 Patching With hot Bitumen Using 35 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-005 Patching With hot Bitumen Using 42 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-006 Patching With hot Bitumen Using 49 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-007 Patching With hot Bitumen Using 56 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-008 Extensive Patching for Every Additional 7 Ltrs. Hot Bitumen
1/2 K.m
MN-009 Patching with Cold Bitumen (CRS-1) Using 14 Ltrs per 1/2 K.m.
km
MN-010 Patching with Cold Bitumen (CRS-1) Using 21 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-011 Patching with Cold Bitumen (CRS-1) Using 28 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-012 Patching with Cold Bitumen (CRS-1) Using 35 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-013 Patching with Cold Bitumen (CRS-1) Using 42 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-014 Patching with Cold Bitumen (CRS-1) Using 49 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-015 Patching with Cold Bitumen (CRS-1) Using 56 Ltrs. Per 1/2 K.m.
1/2 K.m
MN-016 Extensive Patching for Every Additional 7 Ltrs. Cold Bitumen,
CRS-1
1/2 K.m
Description
Unit
Cu.m
Cu.m
Transport
and
Watering
Sq.m
Sq.m
L.m
L.m
L.m
Culverts
Description
Unit
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Sq.m
Cu.m
ST-015 Grouting Rubble Paving with approved cement & Sand mortar
(1:3)
Sq.m
No
ST-017 Forming Weep Holes Using P.V.C. Pipes of Int. Dia. Not less
than 100mm Complete with Dripledge and Surround Finish
ST-018 Smooth.
Shoring with 37.5 mm Thick Class II Timber Planks up to 3 m
Depth
L.m
Sq.m
ST-019 Supplying & Fixing class II Timber Struts Etc. For Shoring up to
3m Depth
Sq.m
Sq.m
ST-021 Lifting Soil For Every 1.5 m Beyond the Initial 1.5m
Cu.m
ST-022 Lifting Wedge Stones For Every 1.5 m Beyond the Initial 1.5m
Cu.m
ST-023 Lifting Rubble or Concrete Every 1.5 m Beyond the Initial 1.5m
Cu.m
ST-024 Lowering Wedged Stones Evety 1.5m Beyond the Initial 1.5 m
Beyond the Initial 1.5 m
Cu.m
ST-025 Lowering Rubble or Concrete Every 1.5m Beyond the Initial 1.5
m
Cu.m
Sq.m
Sq.m
ST-030 Rendering 12.5 mm thick in cement sand Motar 1:3 mix (Rough)
Including T.P. of sand
Sq.m
ST-031 Rendering 12.5mm thick in cement sand Motar 1:3 mix (Smooth
finish)
Sq.m
Sq.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Aggregate
& Piling)
including
of Materials
ST-041A (excl.
MixingTransport
& LayingofUsing
Concrete
Mixer,
CementT.P.
Concrete
1:3:6
(37.5 mm) with 20% plums Using Crusher Run Aggregate (excl.
Aggregate
& Piling)
including
T.P. of 1:3:6
Sand (19 mm)
ST-042 Transport
Mixing & of
Laying
Manually
Cement
Concrete
(Volume Batching) Using Crusher Run Aggregate (excl.
of Aggregate
Piling) Mixer, Cement Concrete 1:3:6
ST-043 Transport
Mixing & Laying
Using &
Concrete
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
ST-052 Mixing & Laying Using Concrete By Power Driven Concrete
Mixer V/Batching
Cu.m
Sq.m.Day
Kg
Sq.m
Cu.dm
L.m
L.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
L.m
ST-067 Lalying & Jointing 229mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
ST-068 Laying & Jointing 305mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
ST-069 Laying & Jointing 457mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
ST-070 Laying & Jointing 610mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
ST-071 Laying & Jointing 915mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
ST-072 Laying & Jointing 12205mm Dia. Concrete Pipes (Transport and
Bedding Material paid separately) [SSCM 707.3 - 4]
L.m
ST-073 Laying & Jointing 152 mm Dia. Available Concrete Pipes and
Collars
L.m
ST-074 Laying & Jointing 229 mm Dia. Available Concrete Pipes and
Collars
L.m
L.m
ST-076 Laying & Jointing 610 mm Dia. Available Concrete Pipes and
Collars
L.m
ST-077 Laying & Jointing 915 mm Dia. Available Concrete Pipes and
Collars
L.m
ST-078 Laying & Jointing 1220 mm Dia. Available Concrete Pipes and
Collars
L.m
ST-079 Fixing new Bridge Planks Runners and Stacking old Planks
(Available) [SSCM 1402.2(a)]
No
L.m
L.m
Sq.m
ST-088 Cleaning, Wire Brushing & Applying Tar on Steelwork, One Coat
Sq.m
ST-089 Cleaning, with Cotton Waste and Painting Steel Work with
Enamel Paint, One Coat
Sq.m
ST-090 Chipping to Bare Metal etc. & Painting with Anticorrosive Paint,
One Coat
Sq.m
Sq.m
Sq.m
L.m
Cu.m
Cu.m
Cu.m
No
No
No
L.m
ST-102 Lay Standard Precast Bridge Kerbs [Type Drawing No T/B/106Rev 1 of RDA](Cost of Precast Kerbs & Transport to be Paid
ST-103 Separately)
Constructing 150x50mm thick Inset Lower Kerb in Grade
20(14mm) Concrete for Bridges: ( Aggregate Transport to be
Separately)
ST-104 Paid
Laying
450 X 450 X 50 mm Precast Concrete Slabs on Foot
Walks Including av. 40mm Thick 1:3 Cement Mortar Bedding
Sabs &Sand
Transport
Paid
Separately)
ST-104A (Cost
MixingofCement
Mortar
Using
a Mixer
L.m
L.m
Sq.m
Cu.m
Sq.m
L.m
No
No
No
No
L.m
Sq.m
Cu.m
use
Sq.m
Cu.m
Cu.m
L.m
Cu.m
Cu.m
Cu.m
Cu.m
m.
L.m
L.m
L.m
No
ST-127 M.S. Angle Iron and Hard Rubber Expansion Joints as Per
Drawing No T/B/107 Rev. 1
L.m
Unit
No
RF-003 Painting White Back Ground on Parapets etc. & Stencilling nos.
No
RF-004 Fixing Guard Stones in any Soil
No
RF-005 Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
282.5 KG/Cu.m ] including curing, for "A" and "B" Class Roads
No
RF-006 Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
282.5 KG/Cu.m ] including curing, for "C" and "D" Class Roads
No
No
No
No
No
No
[SSCM 810.2 AND 1501.3] - All Paints Should Conform to the Requirements of SLS as Given in
SSCM 1707.
Item No Description
Unit
No
No
RS-003 Cleaning, Painting one Coat & Relettering Etc. Traffic sign
Boards inc. Paint Post in B/W
No
L.m
L.m
L.m
L.m
No
No
Sq.m
using
L.m
Section 13 - Miscellaneous
Item No
Description
MS-001 Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
Transport of Aggregate) (Site Made)
MS-001A Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.
Transport of Aggregate) (Site Made) with Department Bitumen
Sand
MS-002 including
Patching T.P.of
Shallow
Pot Holes. Depth Less 20mm using hot
bitumen 1.2ltr/Sq.m & 12.5mm chips single size @ 13.75 cu.
m/sq.m
hand tamping
(rat. inc.
cost of
bitumen
&
MS-002A deci
Patching
roadincld.
with premix
after preparing
surface
with
30% cut
mater.)
(Excl.
Transport.
of
Aggregate
&
Bitumen)
back
Unit
Cu.m
Cu.m
Sq.m
Cu.m
Sq.m
ltr
Sq.m
Sq.m
Sq.m
Sq.m
M.ton
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
MS-011 Patching Ruts and Depressions Upto 75mm Depth Using Plant
Made Cold Mix (Cut Back) Material with .75Ltr/Sq.m tack
Separately)
MS-012 coat(CSS-1)(Premix
Patching Ruts and paid
Depressions
Deeper than 75mm Depth
Using 50mm Down Aggregate, Top 40mm with Plant Made
Cold Mix (Cut Back) Material with .75Ltr/Sq.m tack coat(CSS-1)
(Premix paid Separately)
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Km
Km
Km
Km
Cu.m
km
km
Sq.m
MS-029 Cutting and Removing Fallen Trees upto 600 mm Girth Including
Cutting into Required number of Pieces Including Disposal as
Piece
lessmm
than
2m(SSCM
MS-030 Directed.
Cutting andminimum
Removing
FallenShall
Treesnot
600be- 900
Girth
1203.2)
Including Cutting into Required number of Pieces Including
No
No
Directed.
minimum
Piece
Shall not
less thanWalls
MS-031 Disposal
Weeding as
Masonry
Culverts
Small
Bridges
andbe
Retaining
2m(SSCM
1203.2)
(SSCM 1303.3)
Culverts
Cu.m
No
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
Sq.m
L.m
L.m
Sq.m
L.m
Sq.m
Sq.m
ltr
MS-057 Patching road with Premix (Loose Volume) after Prep, Surface
with Emulsion (CSS-1) at .75 ltr/sq.m at tack Coat Including
and Hand
Stamping.
(Supply of premix
MS-058 internal
PatchingTransport
Road With
Premix
After Preparing
Surface(Loose
With
Volume)
Paid
Separately)
[SSCM
1102.3(b)]
Emulsion (CSS-1) at .75 ltr/sq.m as Tack Coat, Including Internal
andCoats
Stamping
with
Machine
(Supply
Premix Paid
MS-059 Transport
Painting two
Enamel
Paint
on Kerbs,
AfterofCleaning
and
Separately)
[SSCM
1102.3(b)(i)]
Preparing Surface
MS-060 Preparing and Stock Piling Premix at Site Using 12.5 mm
Aggregate and Emulsion (CSS-1) (Excluding Transport of
MS-061 Aggregate)
Breaking Manually Asphalt layer 2"-3" Thick on the Carriageway
for Kerb Laying
Cu.m
M.ton
Sq.m
Cu.m
L.m
Item No
Description
SV-001
Unit
Err:522
Days
Days
Days
Days
km
SV-006
km
SV-007
km
SV-008 Supply of Labour for Chaining and Cutting Pages and Pegging
SV-009
km
km
km
km
f Transport
Rate Rs
170.50
181.50
194.50
30.25
20.30
224.75
255.00
285.25
315.50
345.75
376.00
406.25
426.55
446.85
467.15
487.45
507.75
528.05
548.35
568.65
588.95
609.25
629.55
649.85
670.15
690.45
710.75
731.05
751.35
771.65
791.95
812.25
832.55
852.85
873.15
893.45
913.75
934.05
954.35
974.65
994.95
1015.25
1035.55
1055.85
1157.35
1258.85
1360.35
1461.85
1563.35
1664.85
1766.35
1867.85
1969.35
2070.85
2172.35
2273.85
2476.85
2679.85
2882.85
3085.85
3288.85
3491.85
42.15
48.95
55.75
62.55
69.35
76.15
82.95
89.75
96.55
100.35
104.15
107.95
111.75
115.55
119.35
123.15
126.95
130.75
134.55
138.35
142.15
145.95
149.75
153.55
157.35
161.15
164.95
168.75
172.55
176.35
180.15
183.95
187.75
191.55
195.35
199.15
202.95
206.75
210.55
214.35
233.35
252.35
271.35
290.35
309.35
328.35
347.35
366.35
385.35
404.35
423.35
442.35
480.35
518.35
556.35
594.35
632.35
670.35
9.50
11.90
14.30
16.70
19.10
21.50
23.90
26.30
28.70
32.85
37.00
41.15
45.30
49.45
53.60
57.75
61.90
66.05
70.20
74.35
78.50
82.65
86.80
90.95
95.10
99.25
103.40
107.55
111.70
115.85
120.00
124.15
128.30
132.45
136.60
140.75
144.90
149.05
153.20
157.35
178.10
198.85
219.60
240.35
261.10
281.85
302.60
323.35
344.10
364.85
385.60
406.35
447.85
489.35
530.85
572.35
613.85
655.35
8.80
10.30
11.80
13.30
14.80
16.30
17.80
19.30
20.80
22.00
23.20
24.40
25.60
26.80
28.00
29.20
30.40
31.60
32.80
34.00
35.20
36.40
37.60
38.80
40.00
41.20
42.40
43.60
44.80
46.00
47.20
48.40
49.60
50.80
52.00
53.20
54.40
55.60
56.80
58.00
59.20
65.20
71.20
77.20
83.20
89.20
95.20
101.20
107.20
113.20
119.20
125.20
131.20
143.20
155.20
167.20
179.20
191.20
203.20
12.40
14.80
17.20
19.60
22.00
24.40
26.80
29.20
31.60
33.40
35.20
37.00
38.80
40.60
42.40
44.20
46.00
47.80
49.60
51.40
53.20
55.00
56.80
58.60
60.40
62.20
64.00
65.80
67.60
69.40
71.20
73.00
74.80
76.60
78.40
80.20
82.00
83.80
85.60
87.40
89.20
98.20
107.20
116.20
125.20
134.20
143.20
152.20
161.20
170.20
179.20
188.20
197.20
215.20
233.20
251.20
269.20
287.20
305.20
214.47
234.32
254.17
274.02
293.87
313.72
333.57
353.42
373.27
387.22
401.17
415.12
429.07
443.02
456.97
470.92
484.87
498.82
512.77
526.72
540.67
554.62
568.57
582.52
596.47
610.42
624.37
638.32
652.27
666.22
680.17
694.12
708.07
722.02
735.97
749.92
763.87
777.82
791.77
805.72
819.67
889.42
959.17
1028.92
1098.67
1168.42
1238.17
1307.92
1377.67
1447.42
1517.17
1586.92
1656.67
1796.17
1935.67
2075.17
2214.67
2354.17
2493.67
127.46
140.66
153.86
167.06
180.26
193.46
206.66
219.86
233.06
242.36
251.66
260.96
270.26
279.56
288.86
298.16
307.46
316.76
326.06
335.36
344.66
353.96
363.26
372.56
381.86
391.16
400.46
409.76
419.06
428.36
437.66
446.96
456.26
465.56
474.86
484.16
493.46
502.76
512.06
521.36
530.66
577.16
623.66
670.16
716.66
763.16
809.66
856.16
902.66
949.16
995.66
1042.16
1088.66
1181.66
1274.66
1367.66
1460.66
1553.66
1646.66
101.50
33.75
33.75
28.25
27.00
5.50
3.80
6.80
2.40
4.15
1.90
0.80
59.25
10.60
4.55
20.10
4.40
3.10
22.65
4.95
3.50
30.25
6.60
4.65
45.25
9.95
6.95
60.25
13.20
9.30
90.50
19.85
13.95
194.50
53.25
38.00
32.75
38.00
75.75
126.00
164.00
302.50
605.00
1.90
2.75
4.75
6.95
2.65
1.60
1.70
7425.00
8937.50
10450.00
11962.50
13475.00
14987.50
302.50
8.80
1.50
1.20
12.40
2.40
1.80
in 25 meters Distance
Rate Rs
230.00
285.00
339.50
298.50
449.00
382.00
668.00
568.00
485.00
723.00
559.00
449.00
559.00
778.00
595.00
668.00
887.00
54.75
72.25
970.00
1040.00
1010.00
1570.00
171.50
172.50
31.00
6.20
g
Rate Rs
833.00
1315.00
1860.00
1440.00
1660.00
1990.00
2320.00
2865.00
4070.00
1390.00
2120.00
2525.00
1675.00
2140.00
1605.00
827.00
2070.00
1950.00
2140.00
60.25
120.50
109.50
Rate Rs
646.00
77.75
285.00
231.50
355.50
359.00
337.00
246.50
59.50
54.00
540.00
300.50
300.50
59.25
ving
Rate Rs
147.00
110.00
73.50
97.75
& Rolling
792.00
1370.00
3945.00
3775.00
2450.00
3030.00
2630.00
ament
ulsion/Bitument to be Paid
Rate Rs
273.00
50.63
271.00
34.75
164.00
84.25
160.00
81.75
113.00
24.65
144.00
34.32
111.50
22.75
142.00
23.80
464.00
458.50
109.00
107.50
72.75
145.50
106.50
70.00
28.75
280.00
99.00
8.95
145.50
143.50
2.15
140.00
134.50
128.50
1.70
134.00
12.00
56.25
117.00
983.00
144.00
10.50
185.00
86.75
121.50
1145.00
134.50
139.00
16 km Included in the
Rate Rs
2390.00
3585.00
4775.00
5970.00
7165.00
8360.00
9555.00
1195.00
2185.00
3280.00
4375.00
5465.00
6560.00
7650.00
8745.00
1095.00
2285.00
1895.00
68.00
122.50
8.80
5.30
38.75
108.50
449.00
13.30
97.75
s etc.
Rate Rs
1335.00
1555.00
701.00
6180.94
5845.00
4465.00
4795.00
2145.00
2670.00
1740.00
394.50
798.00
204.00
12515.00
355.50
155.00
530.00
422.00
31.25
500.00
219.00
657.00
328.50
438.50
219.00
334.50
408.00
490.00
554.00
335.50
391.00
456.00
520.00
6920.00
6705.00
6140.00
6220.00
6730.00
6805.00
8770.00
9777.32
7410.00
6180.94
11103.91
11348.91
11425.00
10445.00
13080.00
14735.00
1960.00
2040.00
20.95
218.00
257.00
88.25
558.00
25.00
45.00
55.75
1395.00
1425.00
1330.00
596.00
819.00
1820.00
2615.00
3585.00
4295.00
5595.00
8940.00
13120.00
282.00
313.00
336.50
629.00
1105.00
1615.00
361.50
226.00
72.25
2730.00
534.00
712.00
106.50
77.50
123.50
84.75
85.00
342.00
270.50
344.50
404.50
32.00
1170.00
1655.00
7235.00
435.50
600.00
866.00
1210.00
206.50
142.00
855.00
12270.00
409.50
679.00
32247.00
34836.00
19740.00
21730.00
427.50
463.00
3900.00
1525.00
22.60
2490.00
2620.00
6995.00
335.00
107.00
499.00
783.00
983.00
83.25
75.75
133.00
3620.00
4165.00
es
Rate Rs
25.75
277.50
111.50
77.50
3310.00
2250.00
579.00
431.50
1055.00
2030.00
269.50
1400.00
igns
Rate Rs
12540.00
5170.56
217.00
4415.00
3135.00
214.50
221.00
1220.00
584.00
690.00
21.70
1160.00
8.90
810.00
621.00
669.00
917.00
1010.00
619.00
117.50
115.50
253.20
15630.00
18.90
323.50
1980.00
3990.00
5540.00
7095.00
291.00
243.50
368.50
1075.00
271.50
387.50
72.50
536.00
143.00
235.50
345.00
454.50
564.00
1125.00
16.80
28.75
29.50
41.25
106.50
115.50
186.50
178.00
95.00
83.75
90.25
33.00
897.00
1030.00
162.50
60.00
7.35
133.00
3480.00
3505.00
186.00
14620.00
180.00
Rate Rs
605.00
666.00
908.00
726.00
2,310.00
3,390.00
4,620.00
636.00
1,270.00
1,270.00
1,695.00