CONSTRUCTION OFA STANDARD URBAN ROAD IN A FLAT TERRAIN

UNIT RATE COST DERIVATION (ROAD TYPE A)


NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Land acquisition
4 The road has no Relocation of services
5 The road has no PAPS
6 The road has no RAPS
7 The road is standard 2 lane, each 3.5 metre wide with:a Lined, covered drains on either side
b 1.5 metre wide foot paths on either side
c 9-meter high, single-arm solar street light (60w luminaire) unit
ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

A FLAT TERRAIN
YPE A)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A ROLLING TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE B)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Land acquisition
4 The road has no Relocation of services
5 The road has no PAPS
6 The road has no RAPS
7 The road is standard 2 lane, each 3.5 metre wide with:a Lined, covered drains on either side
b 1.5 metre wide foot paths on either side
c 9-meter high, single-arm solar street light (60w luminaire) unit
ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

ROLLING TERRAIN
YPE B)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A MOUNTAINOUS TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE C)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Land acquisition
4 The road has no Relocation of services
5 The road has no PAPS
6 The road has no RAPS
7 The road is standard 2 lane, each 3.5 metre wide with:a Lined, covered drains on either side
b 1.5 metre wide foot paths on either side
c 9-meter high, single-arm solar street light (60w luminaire) unit
ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

OUNTAINOUS TERRAIN
YPE C)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A FLAT TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE D)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Relocation of services
4 The road has no PAPS
5 The road has no RAPS
6 The road is standard 2 lane, each 3.5 metre wide with:7 Lined, covered drains on either side
a 1.5 metre wide foot paths on either side
b 9-meter high, single-arm solar street light (60w luminaire) unit

ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

A FLAT TERRAIN
YPE D)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A ROLLING TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE E)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Relocation of services
4 The road has no PAPS
5 The road has no RAPS
6 The road is standard 2 lane, each 3.5 metre wide with:7 Lined, covered drains on either side
a 1.5 metre wide foot paths on either side
b 9-meter high, single-arm solar street light (60w luminaire) unit

ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

ROLLING TERRAIN
YPE E)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A MOUNTAINOUS TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE F)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Relocation of services
4 The road has no PAPS
5 The road has no RAPS
6 The road is standard 2 lane, each 3.5 metre wide with:7 Lined, covered drains on either side
a 1.5 metre wide foot paths on either side
b 9-meter high, single-arm solar street light (60w luminaire) unit

ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

OUNTAINOUS TERRAIN
TYPE F)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A FLAT TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE G)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Relocation of services
4 The road is standard 2 lane, each 3.5 metre wide with:5 Lined, covered drains on either side
6 1.5 metre wide foot paths on either side
7 9-meter high, single-arm solar street light (60w luminaire) unit

ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

A FLAT TERRAIN
YPE G)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A ROLLING TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE H)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Relocation of services
4 The road is standard 2 lane, each 3.5 metre wide with:5 Lined, covered drains on either side
6 1.5 metre wide foot paths on either side
7 9-meter high, single-arm solar street light (60w luminaire) unit

ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

ROLLING TERRAIN
YPE H)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500

CONSTRUCTION OFA STANDARD URBAN ROAD IN A MOUNTAINOUS TERRAIN


UNIT RATE COST DERIVATION (ROAD TYPE I)
NOTES
This road description is for a road traversing a flat terrain,underlain by suitable
1
subgrade material
2 The road has no profound drainage strucrures
3 The road has no Relocation of services
4 The road is standard 2 lane, each 3.5 metre wide with:5 Lined, covered drains on either side
6 1.5 metre wide foot paths on either side
7 9-meter high, single-arm solar street light (60w luminaire) unit

ITEM
1
4
5
7
8
9
12
14
15
17
20
21
22
24
25

DESCRIPTION
PRELIMINARY AND SUPERVISORY/SUPPORT SERVICES
SITE CLEARANCE AND TOPSOIL STRIPPING
EARTHWORKS
EXCAVATION AND FILLING FOR STRUCTURES
CULVERTS AND DRAINAGE WORKS
PASSAGE OF TRAFFIC
NATURAL MATERIAL SUBBASE AND BASE
CEMENT AND LIME TREATMENT
BITUMINOUS SURFACE TREATMENT AND SURFACE DRESSING
CONCRETE WORKS
ROAD FURNITURE
MISCELLANEOUS BRIDGE WORKS
DAYWORKS
LAND SCAPING AND ENVIRONMENTAL MITIGATION MEASURES
HIV/AIDS AWARENESS AND EDUCATION

SUB TOTAL (1)


SUB TOTAL (2)
Add 10% of Sub-Total 2 of Bills as Provisional Sums for Contingencies in
accordance with sub-clause 52(4) and clause 58 of the Conditions of Contract (2)
Add 15% of Sub-Total 2 of Bills as Provisional Sums for Variation of Price in
accordance to Clause 70 of the Conditions of Contract.
SUB-TOTAL (3)
Add 16% of Sub-Total (3) for V.A.T. - (3)
TOTAL COST OF ROAD TYPE A PER KILOMETRE LENGTH

OUNTAINOUS TERRAIN
TYPE I)

AMOUNT
RATE
10%
400
500
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700

(Kshs)
1,470,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
1,000,000.00
1,100,000.00
1,200,000.00
1,300,000.00
1,400,000.00
1,500,000.00
1,600,000.00
1,700,000.00
14,700,000
16,170,000

1,617,000

2,425,500
20,212,500
3,234,000
23,446,500