Sunteți pe pagina 1din 11

1.

CLCULO DE LA EVAPOTRANSPIRACIN POTENCIAL


A. MTODO DE THORNTHWAITE

CLCULO DE LA EVAPOTRANSPIRACIN - MTODO DE T


CONCEPTO
ME
ENE.
FEB. MAR. ABR.
MAY.
14.11 13.97 13.07 13.43 14.07
Temperatura media mensual c
4.81
4.74
4.28
4.46
4.79
Indice calrico mensual
12.54 12.28 10.67 11.30 12.46
Evapotrans. sin corregir ( mm/mes/Ha)
1.07
0.97
1.05
0.99
1.01
Factor de correccin
Evapotrans. Corregida ( Eto)(mm/mes)
134.46 118.62 111.81 112.05 126.11
Valor del exponente

"a"

Det. del factor de correcin por


interpolacin. Latitud: 9 38'

1.39
5.00
9.06
10.00

1.04
1.07
1.08

0.95
0.97
0.97

1.04
1.05
1.05

1.00
0.99
0.99

CIN - MTODO DE THORNTHWAITE


MESES
JUN.
JUL.
AGO.
SEP.
OCT.
NOV.
DIC. ANUAL
13.75
13.9 14.633 14.74 14.45 14.467 13.87 168.46
4.63
4.70
5.08
5.14
4.99
5.00
4.69
57.30
11.87 12.15 13.54 13.75 13.18 13.22 12.09 149.04
0.97
1.00
1.01
1.00
1.06
1.05
1.09
114.65 121.93 137.25 137.48 139.49 138.26 132.10 1524.22

1.02
1.01
1.01

0.99
0.97
0.96

1.02
1.00
1.00

1.03
1.01
1.01

1.00
1.00
1.00

1.05
1.06
1.06

1.03
1.05
1.05

1.06
1.09
1.10

CLCULO DE LA DEM
MES

ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC

AREA

Etp (mm/mes)

Kc

3x4=5

31
28
31
30
31
30
31
31
30
31
30
31

20.8
20.8
20.8
20.8
20.8
2.8
17.2
14.4
14.4
14.4
14.4
0.0

134.46
118.62
111.81
112.05
126.11
114.65
121.93
137.25
137.48
139.49
138.26
132.10

0.199
0.497
0.776
0.970
0.951
1.039
0.212
0.368
0.629
0.755
0.567
0.000

26.71
58.94
86.81
108.65
119.88
119.07
25.86
50.52
86.52
105.25
78.37
0.00

82.70
81.20
121.10
71.10
21.00
26.30
10.20
6.90
24.20
158.00
73.30
99.80

68.51
67.53
90.25
59.45
15.20
20.24
4.94
1.81
18.24
100.65
61.26
79.62

El caudal mximo requerido es :

ETP
Kc
ETR
PE

:Evapotranspiradin potencial
:Coeficiente de cultivo ponderado
:Evapotranspiracin real
:precipitacin efectiva

42.34 lt/seg

D. PROY:Demanda del proyecto


mm3

Eficiencia de riego
Ef = ef.captacin x ef. Conduccin x ef. Aplicacin
Ef = 80% x 80% x 60%
Ef =
38.40%
N de horas de riego :

Etr (mm/mes) Pp (mm/mes)

P Efec
(mm/mes)

N de dias

12

:Miles de metros cubicos

LCULO DE LA DEMANDA DE AGUA DEL PROYECTO


DEM. BRUTA.
(mm/mes)

DEM.
mm/dia

DEM. BRUTA mm/dia

DEM. BRUTA
mm/mes

7-5=8

8/1=9

9/Ef=10

10x1=11

-41.79
-8.59
-3.44
49.20
104.68
98.83
20.92
48.71
68.28
4.60
17.11
-79.62

-1.35
-0.31
-0.11
1.64
3.38
3.29
0.67
1.57
2.28
0.15
0.57
-2.57

-3.51
-0.80
-0.29
4.27
8.79
8.58
1.76
4.09
5.93
0.39
1.49
-6.69

-108.84
-22.37
-8.96
128.12
272.59
257.38
54.48
126.85
177.82
11.98
44.56
-207.34

MODULO DE RIEGO
(lt/seg)

VOLUMEN (mmc)

9x2/n de horas de
riego=12
-16.90
-3.85
-1.39
20.56
42.34
5.56
7.00
13.64
19.76
1.29
4.95
0.00

11x1xnde horas
de riego)=13
-22.64
-4.65
-1.86
26.65
56.70
7.21
9.37
18.27
25.61
1.73
6.42
0.00

2. COEFICIENTE DE USO CONSUNTIVO KC DE LOS CULTIVOS DETERMINADOS PARA VARIAS ETAPAS DE CRECIMIENTO
CULTIVOS BASE
TRIGO
PAPA
MAIZ CHOCLO
CEBADA

meses
7
5
5
5

Ene
0.19
0.15
0.15

Feb
0.53
0.50
0.49

Mar
0.81
0.86
0.77

Abr
1.00
1.03
0.97

May
1.09
0.77
0.91

0.40

0.50

0.70

0.90

1.15

Jun
1.04

Jul
0.74
0.15
0.15

Ago

Set

0.49
0.50

0.77
0.86

AGO.

SEP.

10.60
3.80
14.4
0.37

10.60
3.80
14.4
0.63

Fuente: Manual de Uso Consuntivo del Agua para los Principales Cultivos de los Andes Centrales Peruanos

CEDULA DE CULTIVO
CULTIVOS BASE
TRIGO
PAPA
MAIZ CHOCLO
CEBADA
AREA MENSUAL

Kc Ponderado

Ha
2.8
3.8
10.6
3.6
20.8

ENE.
2.80
3.80
10.60

FEB.
2.80
3.80
10.60

MAR.
2.80
3.80
10.60

ABR.
2.80
3.80
10.60

MAY.
2.80
3.80
10.60

3.60

3.60

3.60

3.60

3.60

20.8
0.20

20.8
0.50

20.8
0.78

20.8
0.97

20.8
0.95

CLCULO DE LA EVAPOTRANSPIRACIN REAL (Etr)


Etr = Kc x ETp
Donde:
Etr = Evapotranspiracin Real en mm/mes.
ETp = Evapotranspiracin potencial en mm/mes. (Hargreaves)
Kc = Coeficiente de cultivo.

MESES
JUN.
JUL.
2.80
2.80

2.8
1.04

10.60
3.80
17.2
0.21

IMIENTO
Oct

Nov

0.97
1.03

0.91
0.77

OCT.

NOV.

10.60
3.80
14.4
0.75

10.60
3.80
14.4
0.57

MES

Kc

ENE
FEB
MAR
ABR
MAY
JUN
JUL

0.20
0.50
0.78
0.97
0.95
1.04
0.21

Dic

DIC.

CULTIVOS DE
ROTACIN

MAIZ
PAPA

0.0
0.00

AREA

Etp
(mm/mes)
134.46
118.62
111.81
112.05
126.11
114.65
121.93

Etr
(mm/mes)
26.71
58.94
86.81
108.65
119.88
119.07
25.86

Ha

10.60
3.80
14.4

AGO
SEP
OCT
NOV
DIC

0.37
0.63
0.75
0.57
0.00

137.25
137.48
139.49
138.26
132.10

50.52
86.52
105.25
78.37
0.00

CALCULO DE LA PRECIPITACION EFECTIVA (Ppe)


Cuadro para obtener la Ppe
Pp (mm)
Pp Efec %
5
0
30
95%
55
90%
80
82%
105
65%
130
45%
155
25%
Mas de 155
5%
FUENTE: USER UNITED BOREAU OF RECLAMATION
En el siguiente Cuadro mostramos la precipitacion efectiva:
PP
Pe
MES
(mm)
(mm)
68.51
ENE
82.70
67.53
FEB
81.20
90.25
MAR
121.10
59.45
ABR
71.10
15.20
MAY
21.00
20.24
JUN
26.30
4.94
JUL
10.20
1.81
AGO
6.90
18.24
SEP
24.20
100.65
OCT
158.00
NOV
73.30
61.26
79.62
DIC
99.80
TOTAL
775.80
587.68

on efectiva:

S-ar putea să vă placă și