Documente Academic
Documente Profesional
Documente Cultură
Revision A: 09/10/2014
Presented by: Taranpreet
1. Objective
1.1. Introduction
The main purpose of this document is to explain the Energy Metering and
Management System for the Switchboards in GFC Plant. The offered system
interfaces with Rishabh make (3440) for Main & DG Incommer & Rishabh make
(Delta Energy) for outgoing Feeders, Energy Meters and provide comprehensive
energy management systems. All the meters will be networked to Energy
Management System for reporting, archiving and performance benchmarking.
1.3. Architecture
LEGENDS
PA 330
RS-232 Link
Serial Network
Rs-485
RS-485 Link
Meters On
MODBUS
Doc Ref: RBH/WRK/COM/EI/GFC/01
2.2. Performance
2.3. Functionality
o EnMS will connect meters and stat acquiring data from meters
o All types of reports, hourly, daily, weekly, monthly, yearly, etc. are
user configurable with Index repotting feature.
2.4. Services
Service offered under this project are mentioned below
Supervision of installation of Energy Meters, Serial converters and
Looping of Meters in field.
Supply and Installation of Energy Management System
Factory Acceptance Test & Site Acceptance Tests
Warranty period will be of 1 year. The warranty period shall cover both the
Hardware and software supplied under this project.
Training and Assistance for preparing the reports is also given.
The distance between the Serial converter from the location of Energy
Management System Installation shall be within 15m ,Distance from serial
converters to the Meter looping in switchboards not more than 1000m
PC for the Installation of EnMS is provided by client.
Serial Network cable and Inter panel looping of Meters is done by
customer only, Supervision shall be provided before commissioning for
field network.