Sunteți pe pagina 1din 2

Project:

Kharg island Gas Gathering and NGL Recovery Project


Client:
IOOC
GPC Ref: CT-1285
Breakdown of Prices
Offshore Installation of Decks and Bridges
A. ABOOZAR Gas Compression Platform (AB-GCP) Water Depth: + 35.9 meters
Item No.

Description

Qty.

1
2

Management
Installation Engineering

1
1

Mobilization of Crane Barge Spread (including


Cargo Barge & Assisting Tugboats)

Floatover Installation (Using Sascha)

Unit Rate
(US$)

Total Price
(US$)

Unit Rate
(US$)

Total Price
(US$)

Unit Rate
(US$)

Total Price
(US$)

a) Floatover Staff
b) Floatover Crews
c) Floatover Marine Spread
d) Welding & Inspection of Deck Legs @ 4
Locations
5

Installation of Deck Shipped Loose


Structures after Floatover
a) ESDV / Drain Deck Loose Structural
Members @ 2 Locations
b) Access Platform & Stair to Boatlanding @ 1
Location

Installation of Bridge after Floatover


a) Installation of Bridge Landing @ existing ABPP Production Platform
b) Rigging, Lifting and Position on Bridge
c) Welding and Inspection of Bridge

7
8
9

As-built Documentation
Demobilization of Floatover Spread
Demobilization of Crane Barge Spread

1
1
1

Provide Day Rates for Additional Work


Item No.
1
2
3
4
5

Description
Crane Barge Spread Working
Crane Barge Spread Standby
Cargo Barge
Towing Tugboat (sailing or towing)
Towing Tugboat (standby)

Qty.
1
1
1
1
1

Offshore Construction Management


Item No.
1
2
3
4

Description
Loadout of Deck & Bridge
Sailaway of Deck & Bridge
Floatover of Deck
Installation of Bridge

Filename: Breakdown of Prices


Date: 11/27/2008

Qty.
1
1
1
1

Page 1 of 1

Project:
Kharg island Gas Gathering and NGL Recovery Project
Client:
IOOC
GPC Ref: CT-1285
Breakdown of Prices
Offshore Installation of Decks and Bridges
B. BAHREGANSAR Gas Compression Platform (B-GCP) Water Depth: + 4.3 meters
Item No.

Description

Qty.

1
2

Management
Installation Engineering

1
1

Mobilization of Crane Barge Spread (including


Cargo Barge & Assisting Tugboats)

Floatover Installation (Using Sascha)

Unit Rate
(US$)

Total Price
(US$)

Unit Rate
(US$)

Total Price
(US$)

Unit Rate
(US$)

Total Price
(US$)

a) Floatover Staff
b) Floatover Crews
c) Floatover Marine Spread
d) Welding & Inspection of Deck Legs @ 4
Locations
5

Installation of Deck Shipped Loose


Structures after Floatover
a) ESDV / Drain Deck Loose Structural
Members @ 1 Location
b) Access Platform & Stair to Boatlanding @ 1
Location
c) Riser Access Platform & 16 inch Riser @ 1
Location

Installation of Bridge after Floatover


a) Installation of Bridge Landing @ existing
B-PP Production Platform
b) Rigging, Lifting and Position on Bridge
c) Welding and Inspection of Bridge

7
8
9

As-built Documentation
Demobilization of Floatover Spread
Demobilization of Crane Barge Spread

1
1
1

Provide Day Rates for Additional Work


Item No.
1
2
3
4
5

Description
Crane Barge Spread Working
Crane Barge Spread Standby
Cargo Barge
Towing Tugboat (sailing or towing)
Towing Tugboat (standby)

Qty.
1
1
1
1
1

Offshore Construction Management


Item No.
1
2
3
4

Description
Loadout of Deck & Bridge
Sailaway of Deck & Bridge
Floatover of Deck
Installation of Bridge

Filename: Breakdown of Prices


Date: 11/27/2008

Qty.
1
1
1
1

Page 1 of 1

S-ar putea să vă placă și