rekor beban puncak tertinggi di April 2014 sebesar 22.974 MW (terjadi pada tanggal 24 Ap
rekor tertinggi padabulan April dan Mei, yakni 23.420 Megawatt (MW) yang terjadi pada Senin, 9 Juni pukul 18.
rjadi pada tanggal 24 April jam 18.00 WIB) dan rekor beban puncak tertinggi bulan lalu sebesar 23.208 MW (ter
POSCO
PARTNER COMPARISON
Partner
Skoda Praha
210 MW Pljevlja
power plant,
Montenegro (2013)
Experience
Ansaldo
Ansaldo STS
Ansaldo Energia
Freight
Railways & Mass Transit
a 600 MW gas
plant in Egypt
2011
3000 MW power
plant in Vietnam
2007
Negara
Ceko
Italia
TYPE
EPC
EPC
Doosan
Muandra, India
4000 MW
2013
Korea
EPC
PLTU Lontar 3
Kapasitas
Awarded
investasi
jenis batubara
Teknologi
:
:
:
:
3 x 315 MW
unit 1 COD Dec 2011
unit 2 COD 2012
unit 3 COD 2013
Dongfang Electric Corporation & PT Dalle Energy
USD 588 Juta + Rp 2 T
= Rp 7 Triliun
Batubara Loreng/kalori rendah
Supercritical
(digunakan untuk batubara kalori rendah sehingga
meningkatkan efektifitas pembakaran 20%)
2005 AnsaldoCaldaie Boilers India Pvt. Ltd. is established in Chennai. The Company, 85%
manufactures and supplies Utility Boilers and Heat Recovery Steam Generators in India.
2006 A milestone: HRSG # 100 awarded (250 MWe Horizontal Rizziconi Combined Cyc
successes for Ansaldo Caldaie in the supply 250 MW Class HRSGs installed in 400 MW Com
Santa Barbara, Vado Ligure, Escatron.
2008 Contract award for 2650 MW oil and gas fired boilers for Abu Qir Power Plant, Egy
MW Units for El Tebbin Power Plant in 2007, Ansaldo Caldaie enlarges its track record in Egy
2009 Shuaibah (Saudi Arabia) and Torrevaldaliga North (Italy) units start successfully com
2012With the contract awards for 2 HRSGs for Bahna 400 MW Combined Cycle Power Pl
Ansaldo Caldaie confirms its leadership on Egypts market
Rizziconi Combined Cycle Power Plant, Italy). The award follows a number of other
nstalled in 400 MW Combined Cycle Power Plants such as Rosignano, Sparanise,
Abu Qir Power Plant, Egypt. With this award, which follows the contract for 2350
ges its track record in Egypt.
Combined Cycle Power Plant and 1650 MW oil/gas fired boiler for Suez Power Plant,