GENERAL
1.1
REFERENCES
1.2
DEFINITIONS
1.3
SYSTEM DESCRIPTION
1.3.1
General
1.3.2
Energy
1.4
SUBMITTALS
1.5
QUALITY ASSURANCE
1.5.1
Commissioning Firm
1.5.2
Commissioning Specialist
1.5.2.1
General
1.5.2.2
Responsibilities
1.6
SEQUENCING AND SCHEDULING
PART 2
PRODUCTS
PART 3
EXECUTION
3.1
COMMISSIONING TEAM AND TEST FORMS AND CHECKLISTS
3.2
TESTS
3.2.1
Pre-Functional Performance Test Checklists
3.2.2
Functional Performance Tests
3.3
COMMISSIONING REPORT
-- End of Section Table of Contents --
SECTION 23 08 00.00 10
Page 1
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
UFGS-23 08 00.00 10 (January 2008)
---------------------------------Preparing Activity: USACE
Superseding
UFGS-23 08 00.00 10 (April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated January 2015
**************************************************************************
SECTION 23 08 00.00 10
COMMISSIONING OF HVAC SYSTEMS
01/08
**************************************************************************
NOTE: This guide specification covers the
requirements for commissioning of HVAC systems.
Adhere to UFC 1-300-02 Unified Facilities Guide
Specifications (UFGS) Format Standard when editing
this guide specification or preparing new project
specification sections. Edit this guide
specification for project specific requirements by
adding, deleting, or revising text. For bracketed
items, choose applicable items(s) or insert
appropriate information.
Remove information and requirements not required in
respective project, whether or not brackets are
present.
Comments, suggestions and recommended changes for
this guide specification are welcome and should be
submitted as a Criteria Change Request (CCR).
**************************************************************************
PART 1
GENERAL
**************************************************************************
NOTE: Use of this specification is mandatory for
all projects. A properly functioning HVAC system
assures a comfortable, healthy and productive
environment for the user. The "Design Agent's
Representative" will be a member of the HVAC design
team, i.e. from the AE or Engineering Division. The
"Design Agent's Representative" will actively
participate in the process, including review of all
submittals contained herein.
**************************************************************************
1.1
REFERENCES
**************************************************************************
NOTE: This paragraph is used to list the
publications cited in the text of the guide
SECTION 23 08 00.00 10
Page 2
1.2
DEFINITIONS
SECTION 23 08 00.00 10
Page 3
SIMILAR TERMS
Contract Term
ACG
NEBB
TABB
Commissioning
Standard
ACG Commissioning
Guideline
Procedural Standards
for Building Systems
Commissioning
SMACNA HVAC
Commissioning
Guidelines
Commissioning
Specialist
ACG Certified
Commissioning Agent
NEBB Qualified
Commissioning
Administrator
TABB Certified
Commissioning
Supervisor
1.3
1.3.1
SYSTEM DESCRIPTION
General
Energy
SUBMITTALS
**************************************************************************
NOTE: Review submittal description (SD) definitions
in Section 01 33 00 SUBMITTAL PROCEDURES and edit
the following list to reflect only the submittals
required for the project.
The Guide Specification technical editors have
designated those items that require Government
approval, due to their complexity or criticality,
with a "G." Generally, other submittal items can be
SECTION 23 08 00.00 10
Page 4
SECTION 23 08 00.00 10
Page 5
1.5
QUALITY ASSURANCE
1.5.1
Commissioning Firm
Commissioning Specialist
General
SECTION 23 08 00.00 10
Page 6
1.5.2.2
Responsibilities
Begin the work described in this Section only after all work required in
related Sections has been successfully completed, and all test and
inspection reports and operation and maintenance manuals required in these
Sections have been submitted and approved. Pre-Functional Performance Test
Checklists shall be performed at appropriate times during the construction
phase of the Contract.
PART 2
PRODUCTS
Not Used
PART 3
3.1
EXECUTION
COMMISSIONING TEAM AND TEST FORMS AND CHECKLISTS
**************************************************************************
NOTE: The "Design Agent's Representative" will be
included as a member of the commissioning team for
the pre-commissioning checklists and will
participate in the functional performance tests.
The checklists provided are to be used as guides for
the preparation of project checklists. The
appropriate checklist should be included in the
project specification for each HVAC equipment
component. The designer will add additional
checklists for equipment or systems not included in
this guide specification or modify the checklists
where necessary for specific project requirements.
If, for example, a system needs to be tested with
certain internal load, each appropriate checklist
should be modified to include this requirement along
with specifics on how load should be generated.
**************************************************************************
Designate Contractor team members to participate in the Pre- Functional
Performance Test Checklists and the Functional Performance Tests specified
herein. In addition, the Government team members will include a
representative of the Contracting Officer, the Design Agent's
Representative, and the Using Agency's Representative. The team members
shall be as follows:
SECTION 23 08 00.00 10
Page 7
Designation
Function
TESTS
Page 8
COMMISSIONING REPORT
SECTION 23 08 00.00 10
Page 9
APPENDIX A
PRE-FUNCTIONAL PERFORMANCE TEST CHECKLISTS
SECTION 23 08 00.00 10
Page 10
[_____]
Checklist Item
Installation
a. Inspection and access doors are operable
and sealed.
___ ___
___
___
___ ___
___
___ ___
___
___
Electrical
a.
___
___
___
b.
___
___
___
c.
___
___ ___
___
d.
___
___
___
___
___
___ ]
Coils
[a.
___ ___
___ ]
[a.
___ ___
___ ]
[b.
___ ___
___ ]
[b.
___ ___
___ ]
Controls
___
___ ___
b.
___
___ ___
c.
___
___ ___
d.
___
___ ___
a.
Page 11
e.
___
___ ___
___
___ ___
___ ___
___
___
___
___
f.
a.
b.
SECTION 23 08 00.00 10
Page 12
[_____]
Checklist Item
___ ___
___
___
___ ___
___
___ ___
___
___
Installation
a. Inspection and access doors are operable
and sealed.
b.
c.
Electrical
a.
___
___
___
b.
___
___
___
c.
___
___ ___
___
d.
___
___
___
___
___
___]
Coils
[a.
___ ___
___]
[a.
___ ___
___]
[b.
___ ___
___]
[b.
___ ___
___]
SECTION 23 08 00.00 10
Page 13
[_____]
Checklist Item
Installation
a.
___ ___
b.
c.
d.
___ ___
___
___
e.
___
___
Electrical
___ ___
X
___
___ ___
a.
___
___
___ ___
b.
___
___ ___
c.
___ ___
d.
___
___
___ ___
e.
___
___
___ ___
___
Piping
a.
b.
SECTION 23 08 00.00 10
___ ___
___ ___
Page 20
___
O
_____
[_____]
Checklist Item
Installation
a.
___ ___
b.
___ ___
c.
___ ___
___
d.
___ ___
___
Startup
a.
___ ___
___ ___
c.
___ ___
___ ___
d.
___ ___
___ ___
e.
___ ___
___
___
b.
Electrical
a.
Controls
a.
b.
c.
___
___
___ ___
___ ___
___ ___
___ ___
___ ___
___ ___
___
___
SECTION 23 08 00.00 10
___ ___
Page 21
[_____]
Checklist Item
Installation
a.
___ ___
___
b.
___ ___
___
___
c.
___ ___
___
d.
___ ___
___
Startup
a.
___ ___
___ ___
c.
___ ___
d.
___ ___
e.
f.
___ ___
g.
h.
b.
Electrical
a.
SECTION 23 08 00.00 10
___
___ ___
X
___
___
___ ___
___
___
___
___
___
___
___ ___
Page 22
___ ___
[_____]
Checklist Item
___
Installation
a.
___ ___
Electrical
a.
___
___
___
b.
___
___
___
c.
___
___
___ ___
a.
___ ___
___
___
b.
___ ___
___
___
SECTION 23 08 00.00 10
Page 17
[_____]
Checklist Item
Installation
a.
___ ___
Electrical
a.
___
___
___ ___
b.
___
___
___ ___
c.
___
___
___ ___
___
___
___ ___
d.
Controls
a.
___ ___
___ ___
b.
___ ___
___ ___
c.
___ ___
___ ___
d.
___ ___
___ ___
e.
___ ___
f.
SECTION 23 08 00.00 10
Page 18
___
[_____]
Checklist Item
Installation
a.
___ ___
b.
___ ___
c.
[d.
e.
Electrical
a.
___
___
___ ___
b.
___
___
___ ___
c.
___
___
___ ___
___ ___
___ ___
Controls
a.
___ ___
b.
c.
___ ___
e.
g.
i.
___ ___
___ ___
___ ___
___ ___
SECTION 23 08 00.00 10
Page 19
[_____]
Checklist Item
Installation
a.
___ ___
b.
c.
d.
___ ___
___
___
e.
___
___
Electrical
___ ___
X
___
___ ___
a.
___
___
___ ___
b.
___
___ ___
c.
___ ___
d.
___
___
___ ___
e.
___
___
___ ___
___
Piping
a.
b.
SECTION 23 08 00.00 10
___ ___
___ ___
Page 20
___
O
_____
[_____]
Checklist Item
Installation
a.
___ ___
b.
___ ___
c.
___ ___
___
d.
___ ___
___
Startup
a.
___ ___
___ ___
c.
___ ___
___ ___
d.
___ ___
___ ___
e.
___ ___
___
___
b.
Electrical
a.
Controls
a.
b.
c.
___
___
___ ___
___ ___
___ ___
___ ___
___ ___
___ ___
___
___
SECTION 23 08 00.00 10
___ ___
Page 21
[_____]
Checklist Item
Installation
a.
___ ___
___
___
b.
___ ___
___
c.
___ ___
___
___
___
Electrical
a.
b.
c.
d.
___ ___
___ ___
e.
Coils
___ ___
X
___
[a.
___ ___
[a.
___ ___
[c.
___ ___
[c.
___ ___
___]
Controls
a.
___]
___ ___
b.
___ ___
c.
___ ___
d.
Dampers/actuators operable.
___ ___
e.
___ ___
A
Page 30
a.
SECTION 23 08 00.00 10
___ ___
Page 31
___
___
[_____]
Checklist Item
Installation
a.
___ ___
___
___
b.
___ ___
___
c.
___ ___
___
___
Electrical
a.
___ ___
b.
___ ___
c.
d.
___]
[e.
Coils
[a.
___ ___
[b.
___ ___
[c.
___ ___
Controls
a.
___ ___
b.
___ ___
c.
___ ___
SECTION 23 08 00.00 10
___ ___
Page 24
___
___ ___
___]
___ ___
___
___
[_____]
Checklist Item
Installation
[a.
[a.
___ ___
___ ___
Electrical
___]
a.
b.
c.
___ ___
___ ___
d.
Controls
a.
___ ___
b.
___ ___
c.
___ ___
SECTION 23 08 00.00 10
___ ___
Page 25
___ ___
X
___
___ ___
___
___
[_____]
Checklist Item
Installation
a.
___
___
___ ___
Electrical
a.
b.
c.
Controls
___ ___
X
___
___ ___
a.
___ ___
b.
___ ___
c.
___ ___
d.
Dampers/actuators operable.
___ ___
e.
___ ___
a.
___ ___
SECTION 23 08 00.00 10
Page 26
T
X
___
O
X
___
[_____]
b.
__________________
h.
2.
Verify chiller inlet/outlet pressure and flow reading, compare to
Testing, Adjusting, and Balancing (TAB) Report, chiller design conditions,
and
chiller manufacturer's performance data.
DESIGN
TAB REPORT
ACTUAL
__________
____________________
__________
____________________
Chiller flow
__________
__________
L/secGPM
__________
3.
Measure chiller amperage each phase and voltage phase to phase and
phase to ground for both the fully loaded condition.
Motor F/L AMPS
Amperage Phase 1 __________ Phase 2__________ Phase 3_______ _________
Voltage
Ph1-Ph2 __________
Ph1-Ph3__________
SECTION 23 08 00.00 10
Ph2-Ph3_______
Page 38
Voltage
Ph1-gnd __________
Ph2-gnd__________
SECTION 23 08 00.00 10
Ph3-gnd_______
Page 39
[_____]
Design
deg
deg
deg
deg
CF
CF
CF
CF
__________
__________
__________
5.
6.
Certification: We the undersigned have witnessed the above functional
performance tests and certify that the item tested has met the performance
requirements in this section of the specifications.
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 40
[_____]
Checklist Item
Installation
a.
___ ___
___
___
b.
___ ___
___
c.
___ ___
___
___
___
Electrical
a.
b.
c.
d.
___ ___
___ ___
e.
Coils
___ ___
X
___
[a.
___ ___
[a.
___ ___
[c.
___ ___
[c.
___ ___
___]
Controls
a.
___]
___ ___
b.
___ ___
c.
___ ___
d.
Dampers/actuators operable.
___ ___
e.
___ ___
A
Page 30
a.
SECTION 23 08 00.00 10
___ ___
Page 31
___
___
[_____]
Checklist Item
Installation
a.
___ ___
Startup
a.
Controls
a.
b.
___ ___
T
X
___
O
X
___
___
___ ___
___ ___
SECTION 23 08 00.00 10
Page 32
- End of Appendix A -
SECTION 23 08 00.00 10
Page 33
APPENDIX B
FUNCTIONAL PERFORMANCE TESTS CHECKLISTS
SECTION 23 08 00.00 10
Page 34
HAND__________
OFF__________
AUTO__________
kPa gaugepsig
kPa gaugepsig
TAB
_________
ACTUAL
__________
__________
__________
__________
d. Operate pump at shutoff and at 100 percent of designed flow when all
components are in full flow. Plot test readings on pump curve and
compare results against readings taken from flow measuring devices.
SHUTOFF
100 percent
__________
__________
__________
__________
__________
__________
SETPOINT
________
SECTION 23 08 00.00 10
Page 35
Pump [_____]
SHUTOFF
__________
100 percent
__________
__________
__________
__________
__________
SETPOINT
________
2.
Measure motor amperage each phase and voltage phase to phase and phase
to ground for both the full flow and the minimum flow conditions. Compare
amperage to nameplate FLA.
a.
Full flow:
Nameplate FLA
__________
Amperage
Phase 1 __________
Phase 2__________
Phase 3__________
Voltage
Ph1-Ph2 __________
Ph1-Ph3__________
Ph2-Ph3__________
Voltage
Ph1-gnd __________
Ph2-gnd__________
Ph3-gnd__________
b. Minimum flow:
Phase 1 __________
Phase 2__________
Phase 3__________
Voltage
Ph1-Ph2 __________
Ph1-Ph3__________
Ph2-Ph3__________
Voltage
Ph1-gnd __________
Ph2-gnd__________
3.
Amperage
Ph3-gnd__________
___________________________________________________________________________
___________________________________________________________________________
SECTION 23 08 00.00 10
Page 36
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 37
[_____]
b.
__________________
h.
2.
Verify chiller inlet/outlet pressure and flow reading, compare to
Testing, Adjusting, and Balancing (TAB) Report, chiller design conditions,
and
chiller manufacturer's performance data.
DESIGN
TAB REPORT
ACTUAL
__________
____________________
__________
____________________
Chiller flow
__________
__________
L/secGPM
__________
3.
Measure chiller amperage each phase and voltage phase to phase and
phase to ground for both the fully loaded condition.
Motor F/L AMPS
Amperage Phase 1 __________ Phase 2__________ Phase 3_______ _________
Voltage
Ph1-Ph2 __________
Ph1-Ph3__________
SECTION 23 08 00.00 10
Ph2-Ph3_______
Page 38
Voltage
Ph1-gnd __________
Ph2-gnd__________
SECTION 23 08 00.00 10
Ph3-gnd_______
Page 39
[_____]
________
___________________
down.
(kPa gauge)
(psig)
(kPa gauge)
(psig)
L/secGPM
DESIGN
__________
__________
TAB TEST
__________
__________
ACTUAL
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
Voltage
SECTION 23 08 00.00 10
Page 56
degrees
degrees
degrees
degrees
Design
CF
CF _____degrees CF
CF _____degrees CF
CF _____degrees CF
___________________________________________________________________________
___________________________________________________________________________
6. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 57
[_____]
Phase 1 __________
Phase 2__________
Phase 3_______
Voltage
Ph1-Ph2 __________
Ph1-Ph3__________
Ph2-Ph3_______
Voltage
Ph1-gnd __________
Ph2-gnd__________
Ph3-gnd_______
3.
4.
___________________________________________________________________________
___________________________________________________________________________
5. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
Contractor's Mechanical Representative
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 58
a.
(1)
Verify VAV box response to room temperature set point adjustment.
Turn thermostat to 3 degrees C5 degrees F below ambient and measure maximum
airflow. Turn thermostat to 3 degrees C5 degrees F above ambient and
measure minimum airflow.
Setting
Measured
Design
Maximum flow
[______]
[_____]
[_____] L/scfm
Minimum flow
[______]
[_____]
[_____] L/scfm
b.
(1)
Verify VAV box response to room temperature set point adjustment.
Turn thermostat to 3 degrees C5 degrees F above ambient and measure maximum
airflow. Turn thermostat to 3 degrees C5 degrees F below ambient and
measure minimum airflow.
Maximum flow
Minimum flow
Setting
[______]
[______]
Measured
[_____]
[_____]
Design
[_____] L/scfm
[_____] L/scfm
(2) Verify reheat coil operation range (full closed to full open) by
turning room thermostat 3 degrees C5 degrees F above ambient _______.
With heating water system and boiler in operation providing design
supply hot water temperature record the following:
Design HW supply temperature______ deg CF
Actual HW supply temperature______ deg CF
AHU supply air temperature______ deg CF
VAV supply air temperature______ deg CF
Calculate coil capacity and compare to design:
Design ______ WBTU/hr Actual _____WBTU/hr
SECTION 23 08 00.00 10
Page 43
Maximum flow
Minimum flow
Setting
[______]
[______]
Measured
[_____]
[_____]
Design
[_____] L/scfm
[_____] L/scfm
d.
Maximum flow
Setting
[______]
Measured
[_____]
SECTION 23 08 00.00 10
Design
[_____] L/scfm
Page 44
Minimum flow
[______]
[_____]
SECTION 23 08 00.00 10
[_____] L/scfm
Page 45
_____ deg CF
_____ deg CF
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 46
[_____]
1.
Functional Performance Test: Contractor shall verify operation of air
handling unit in accordance with specification including the following:
a. Ensure that a slight negative pressure exists on inboard side of
the outside air dampers throughout the operation of the dampers. Modulate
OA, RA, and EA dampers from fully open to fully closed positions__________.
b. The following shall be verified [supply fan operating][supply and
return fans operating] mode is initiated:
(1) All dampers in normal position prior to fan start___________.
(2) All valves in normal position prior to fan start____________.
(3) System safeties allow start if safety conditions are met.____
(4) VAV fan controller shall "soft-start" fan. __________________
(5) Modulate all VAV boxes to minimum air flow and verify that
the static pressure does not exceed the high static pressure shutdown
setpoint_____________.
(6) Return all VAV boxes to auto _______________.
c.
Page 47
SECTION 23 08 00.00 10
Page 48
Min cooling
Supply air temp.
h.
Verify safety shut down initiated by low temperature protection
thermostat. _________
i.
Verify occupancy schedule is programmed into time
clock/UMCS________.
2. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 49
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 50
[_____]
1.
Functional Performance Test: Contractor shall verify operation of air
handling unit in accordance with specification including the following:
a.
Ensure that a slight negative pressure exists on inboard side of the
outside air dampers throughout the operation of the dampers. Modulate OA,
RA, and EA dampers from fully open to fully closed positions.
(1)
Outside air damper modulated to maintain mixed air
temperature set point. Setpoint _______deg CF Actual _____deg CF O/A
damper position ___________ percent Return Air Temperature_____deg CF
Outside Air Temperature _______ deg CF
(2) Relief air damper modulates with outside air damper according
to sequence of operation. Relief air damper position ________ percent
(3) Chilled water control valve modulating to maintain space
cooling temperature set point. Setpoint _______deg CF Actual _____deg CF
Return sensor overrides to normal operation.
d. Unoccupied mode of operation.
(1)
Observe fan starts when space temperature calls for
heating/cooling ____.
(2)
All dampers in normal position. _________________________
(3)
Verify low limit space temperature is maintained as
specified in sequence of operation. ______________________________________
SECTION 23 08 00.00 10
Page 51
-End of document
-- End of Section --
SECTION 23 08 00.00 10
Page 74
[_____]
1.
Functional Performance Test: Contractor shall verify operation of air
handling unit in accordance with specification including the following:
a.
Ensure that a slight negative pressure exists on inboard side
of the outside air dampers throughout the operation of the dampers.
Modulate OA, RA, and EA dampers from fully open to fully closed positions.
b.
The following shall be verified when the supply and return fans
operating mode is initiated:
(1) All dampers in normal position. _____________________________
(2) All valves in normal position. ______________________________
(3) System safeties allow start if safety conditions are met. ___
b.
SECTION 23 08 00.00 10
Page 53
____________________________
_____________________________
_______
____ Supply Air Temperature at Max Cooling _______deg CF
____ Supply Air Temperature at Max Heating _______deg CF
____Hot Deck Damper leakage at Max cooling _______l/SCFM
____Cold Deck Damper leakage at Max heating _______l/SCFM
Zone
Zone
Zone
Zone
Zone
_______
____ Supply Air Temperature at Max Cooling _______deg CF
____ Supply Air Temperature at Max Heating _______deg CF
____Hot Deck Damper leakage at Max cooling _______l/SCFM
____Cold Deck Damper leakage at Max heating _______l/SCFM
SECTION 23 08 00.00 10
Page 54
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
UFGS-23 08 00.00 10 (January 2008)
---------------------------------Preparing Activity: USACE
Superseding
UFGS-23 08 00.00 10 (April 2006)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated January 2015
**************************************************************************
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
SECTION 23 08 00.00 10
COMMISSIONING OF HVAC SYSTEMS
01/08
PART 1
GENERAL
1.1
REFERENCES
1.2
DEFINITIONS
1.3
SYSTEM DESCRIPTION
1.3.1
General
1.3.2
Energy
1.4
SUBMITTALS
1.5
QUALITY ASSURANCE
1.5.1
Commissioning Firm
1.5.2
Commissioning Specialist
1.5.2.1
General
1.5.2.2
Responsibilities
1.6
SEQUENCING AND SCHEDULING
PART 2
PRODUCTS
PART 3
EXECUTION
3.1
COMMISSIONING TEAM AND TEST FORMS AND CHECKLISTS
3.2
TESTS
3.2.1
Pre-Functional Performance Test Checklists
3.2.2
Functional Performance Tests
3.3
COMMISSIONING REPORT
-- End of Section Table of Contents --
SECTION 23 08 00.00 10
Page 1
[_____]
________
___________________
down.
(kPa gauge)
(psig)
(kPa gauge)
(psig)
L/secGPM
DESIGN
__________
__________
TAB TEST
__________
__________
ACTUAL
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
Voltage
SECTION 23 08 00.00 10
Page 56
degrees
degrees
degrees
degrees
Design
CF
CF _____degrees CF
CF _____degrees CF
CF _____degrees CF
___________________________________________________________________________
___________________________________________________________________________
6. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 57
[_____]
Phase 1 __________
Phase 2__________
Phase 3_______
Voltage
Ph1-Ph2 __________
Ph1-Ph3__________
Ph2-Ph3_______
Voltage
Ph1-gnd __________
Ph2-gnd__________
Ph3-gnd_______
3.
4.
___________________________________________________________________________
___________________________________________________________________________
5. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
Contractor's Mechanical Representative
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 58
SECTION 23 08 00.00 10
_____________________________
Page 59
[_____]
_________
c. Verify boiler senses hot water temperature below set point and
control system activates boiler start. Setpoint_________deg CF
3.
ACTUAL
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
Verify
a.
b.
c.
d.
e.
f.
g.
________________________
6.
Shut off building heating equipment to remove load on hot water
system. Verify boiler shutdown sequence is initiated and accomplished after
load is removed.
_______________________________________________________
SECTION 23 08 00.00 10
Page 60
SECTION 23 08 00.00 10
Page 61
___________________________________________________________________________
___________________________________________________________________________
8. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 62
[_____]
DESIGN
Boiler inlet feedwater temp deg CF
__________
Boiler outlet pressure kPa gaugepsig
__________
Flue-gas temperature at boiler outlet deg CF
Percent carbon dioxide in flue-gas
Draft at boiler flue-gas exit kpainches-wg
Stack emission pollutants concentration __________
Fuel type
__________
Combustion efficiency
__________
3.
4.
5.
___________________________________________________________________________
___________________________________________________________________________
6. Visually check refractory for cracks or spalling and refractory and
tubes for flame impingement._______________________________________________
SECTION 23 08 00.00 10
Page 63
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 64
(1) Verify fan coil unit response to room temp set point
adjustment.
1.
Check blower fan airflow. _____ L/scfm
2.
Check cooling coil water flow. _____ L/sgpm
3.
Verify proper operation of cooling water control
valve.______
4.
Cooling mode inlet air temperature ______deg CF
5.
Cooling mode outlet air temperature______deg CF
6.
Calculate coil sensible capacity and compare to design:
Calculated _______WattsBTU/hr Design______WattsBTU/hr
b.
(1) Verify fan coil unit response to room temp set point
adjustment.
1. Check blower fan airflow. _____ L/scfm
2. Check cooling coil water flow. _____ L/sgpm
3. Verify proper operation of cooling water control valve. ____
4. Check cooling mode inlet air temperature. _____deg CF
5. Check cooling mode outlet air temperature. _____deg CF
6. Calculate cooling coil sensible capacity and compare to
design:
7. Calculated _________WattsBTU/hr Design_____WattsBTU/hr
8. Check heating coil water flow. _____ L/sgpm
9. Verify proper operation of heating water control valve. _____
10. Check heating mode inlet air temperature. _____ deg CF
11. Check heating mode outlet air temperature. _____deg CF
12. Calculate heating coil capacity and compare to design:
Calculated______WattsBTU/hr design_______WattsBTU/hr
2. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
____________________________
_____________________________
______________________________
______________________________
_____________________________
SECTION 23 08 00.00 10
Page 65
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 66
a.
Verify unit heater response to room temperature set point
adjustment.___________________________________
b.
Check heating mode inlet air temperature. _____ deg CF
c.
Check heating mode outlet air temperature. _____ deg CF
d.
Record manufacturer's submitted fan capacity _____L/scfm
e.
Calculate unit heater capacity using manufacturer's fan capacity
and recorded temperatures and compare to design.
f.
Calculated_____WattsBTU/hr Design______WattsBTU/hr
2. Certification: We the undersigned have witnessed the above
functional performance tests and certify that the item tested has met the
performance requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 67
[_____]
_______________________________
b. Verify converter senses hot water temperature below set point and
control system modulates steam valve. ____________________________________
c. Shut off building heating equipment to remove load on heating
system. Verify converter steam valve closes after load is removed. ______
2. Verify converter inlet/outlet pressure reading, compare to converter
design conditions and manufacturer's performance data.
DESIGN
ACTUAL
Converter inlet water temp deg CF
__________ __________
Converter outlet water temp deg CF
__________ __________
Converter inlet steam pressure kpapsig
__________ __________
Determine water flow rate based
on pressure drop through converter (L/SGPM)__________ __________
Determine water flow rate with flow
measuring device L/SGPM
__________ __________
Verify that temperature of water
Current
Actual
is in accordance with outdoor air
Setpoint Temperature
reset schedule
__________ __________
3.
_____________________
____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 68
SECTION 23 08 00.00 10
_____________________________
Page 69
[_____]
______
____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
_____________________________
SECTION 23 08 00.00 10
Page 70
[_____]
3.
Verify all required I/O points function from the UMCS system_____.
4.
Certification: We the undersigned have witnessed the Performance
Verification Test and certify that the item tested has met the performance
requirements in this section of the specifications.
Signature and Date
Contractor's Commissioning Specialist
_________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
SECTION 23 08 00.00 10
Page 71
[_____]
b.
Design
__________
__________
__________
__________
__________
__________
__________
__________
Actual
__________
__________
__________
__________
__________
__________
__________
__________
__________________________
___________________________
___________________________
___________________________
___________________________
__________________________
___________________________
___________________________
SECTION 23 08 00.00 10
Page 72
- End of Appendix B -
SECTION 23 08 00.00 10
Page 73
-End of document
-- End of Section --
SECTION 23 08 00.00 10
Page 74