Documente Academic
Documente Profesional
Documente Cultură
E- TENDER
FOR
EXPLORATION OF
LIMESTONE, BAUXITE, CLAYS
&
OTHER ASSOCIATED MINERALS WITH
HYDRAULIC
CORE DRILLING RIGS
IN
GUJARAT
(TECHNICAL BID PART-I)
Page No| 2
Brief Introduction
12/05/2005 . The Society was constituted under Societies Registration Act 1860
and Charitable Trust Act 1950 was registered at the District Registrars Office,
Gandhinagar
respectively.
and
Assistant
Charity
Commissioner
Office,
Gandhinagar
Along with other object the main task of GMRDS are to undertake research and
development in the field of mineral analysis & testing of ores, rocks & mineral
samples submitted by the Commissinerate of Geology & Mining, public sector
undertakings,
private
sector
mineral
industries,
research
institutions,
Limestone , Bauxite, Clay and other associated minerals, to develop this deposite
systematically and scientifically proper exploration to the G2 grade of UNFC
Page No| 3
1.
Tender documents are available only in electronic format which Bidders can
download free of cost from the website https://geomining.gujarat.gov.in &
https://www.nprocure.com
2.
All bids (technical and price bid) should be submitted online through the
website https:nprocure.com only. No physical submission of price and
technical bid will be entertained as it should be furnished on-line only. Also
no fax, e-mail, letters will be entertained for the same.
3.
4.
5.
All bids should be digitally signed. For details regarding digital signature
certificate and related training involved at the below mentioned address
should be contacted:
(N) Procure Cell
(N) Code solutions A division of GNFC
403, GNFC, Info-Tower, Bodakdev
Ahmedabad-380 054 (India)
Tel: +91 26857316/17/18 Fax: +91 79 26857321
Toll Free: 1800 -233-1010
E-mail: nprocure@gnvfc.net
Page No| 4
6.
Kindly take note that, valid Digital Signature Certificates is must for all the
interested bidders. Online tendering process is not possible without valid
digital signature certificate.
7.
Interested bidders are also requested to complete their procedure for taking
digital signature certificate in respect to filling of application form, supporting
documents with necessary fees at least 3 days before last date of tender
submission.
8.
(N) code solutions reserve the rights to issue digital signature certificate after
verification of applications forms/supporting documents submitted by bidder.
(N) Code solutions is fully authorized to issue digital signature certificate to
bidders.
9.
All the bidders who have no facility to participate in on-line tenders are
requested to contact (n) code solutions for the same.
10.
Free vendor training camp will be organized every Saturday between 4.00 to
5.00 P.M. at (n) code solutions-A Division of GNFC Ltd., Bidders are requested
to take benefit of the same( Advance Confirmation to (n) code is requested).
11.
Page No| 5
Page No| 6
Chapter II
Criteria for Evaluation of Technical Bids
1. EXPERIENCE
The bidder should have following minimum experience of having successfully
completed similar work during last 7 years.
Three similar completed each work having total 30000 mtrs core
drilling annually
or
Two similar completed each work having total 37500 mtrs. of core
drilling annually
or
One similar completed work having quantity of 60000 mtr. of core
drilling annually.
(Similar work means core drilling experience in any type of formation)
2. Possession of drilling machine
Minimum 7 nos having capacity to drilled up to 200 mtr. along with required
accessories. Bidder has to submit documentary evidence clarifying ownership
of the drilling machine along with technical bid .
3. CONSORTIUM / JOINT VENTURE:
a) A Joint Venture may be formed for the purpose of tender work. However, the
JVC partners should jointly own, possess and be able to deploy required
machinery worth required capacity.
b) The offer shall be submitted in the name of any of the partners of the Joint
Venture Company.
c) The JVC/Consortium should have proper and legally enforceable working
arrangements as a part of the agreement.
d) The bid may be rejected in case the documents in support of the status of
bidder are not clear or if the supporting documents are not enclosed with the
technical bid.
Page No| 8
3. POSSESSION OF MACHINERY
The bidder should directly own and readily available required (As per Sr No 1)
Diamond/TC Core Drilling Rigs with necessary accessories and pump. The
bidder should clearly state its status and submit duly attested supporting
documents for ownership of the drilling rigs.
Bidder should deploy the diamond /TC core drilling rigs in good condition
with duly fitted hydraulic system.
The bidder must have sound financial position so as to buy and deploy
additional machinery so as to meet the targets It will mean that the latest
audited balance sheet of the bidder must show its net-worth equal to 30% of
the cost of additional machinery which the bidder proposes to buy on award
of the contract. A certified copy of the balance sheet and copies of the
documentary proof for the cost of such machinery must be attached with the
technical bid.
4. Technical Manpower
Minimum five Geologist having MSc/M.Tech degree. Bidder has to submit
documentary evidence clarifying employment details of the Geologist with
contractor/consultant along with technical bid
5. Average Annual turnover of the company in last three years
3.60 crore, Bidder has to submit copy of the audited balance sheet along with
technical bid
6. SOLVENCY CERTIFICATE
The bidder should submit latest Solvency Certificate for a value of Rs. 15
(fifteen) Lacs issued from any Nationalized Bank with in last 12 months along
with the technical bid.
7. ACCEPTANCE OF GENERAL TERMS AND CONDITIONS:
The bidder should unconditionally accept all the terms and conditions of the
contract by signing on each page of the technical bid document of the tender
including annexures.
Page No| 9
8. EMD
The bidder should enclose separate crossed demand draft in favour of
Gujarat Mineral Research & Development Society of any nationalized bank or
scheduled bank worth Rs. 36 Lacs (Rupees thirty six Lacs) towards Earnest
Money Deposit along with the documents of technical bid in the cover so
super-scribed. In absence of the DD for EMD or inadequate amount of EMD,
the offer will be rejected. DD issued by co-operative bank shall not be
accepted
9. DECLARATION
The bidder should give a declaration along with the technical bid that it has
not enclosed any conditional offer.
10. BLACK-LISTING OF THE BIDDER:
The Bidder or its directors or partners of JVC should have been not black listed
by any Government Organisation, nor should any litigation should be pending
against any of them. The bidder will submit declaration to this effect along
with the technical bid. If at any time such declaration is found false, the bid
will be rejected or if the contract work is already awarded, it will be
terminated forthwith without payment of any compensation and the EMD/SD
will be forfeited.
Page No| 10
CHAPTER - III
OTHER TERMS AND CONDITIONS OF THE TENDER
Gujarat Mineral Research & Development Society (herein after referred to as
GMRDS) proposes to carry out drilling work by hiring of Hydraulic core drilling rigs to
explore Limestone, Bauxite, Clays & other minerals in various parts of Saurashtra&
Kachchh district of Gujarat.
1) SCOPE OF WORK
1.1) Exploratory Drilling:
(a) The successful bidder will provide 07 numbers of Diamond/TC Core drilling
rigs with necessary accessories and Manpower and other ancillary equipment
for Exploratory core drilling with NX / BX /NQ/ size & AX size if required.
In case of clays contractor has to undertake dry drilling.
The proposed drilling locations for minerals other than lignite such as
Limestone , Bauxite and clays (white clay &china clay etc.)&silica sand etc of
Gujarat
(b) The drill holes will be Vertical.
(c) The drill hole depth will be maximum 150 meters.
(d) The core recovery in all the formation should be at least 85 %.
1.2) Survey Work:
GMRDS will provide the proposed bore hole location plan of all the areas to be
covered under exploration and location (on plan & Field) of minimum two bench
marks with RL and co-ordinates within close proximity of area of Exploration.
The contractor has to make its own arrangements to fix up the proposed bore
hole location on the site. They will also determine the Reduce Level and Co
ordinates of all the bore holes.
In case of the bore hole location shown on plan is not feasible on ground, the
alternative location should be decided in consultation with CGM/GMRDS
Geologist.
Page No| 11
Page No| 12
Abstract
Introduction
1.1
1.2
1.3
1.4
Vegetation
1.5
Previous Work
Geological Setting
3.1
Stratigraphic Classification
3.2
3.3
Structural details
Mode of Sampling
Details of Drilling
classification G2 grade
8
10
Acknowledgement
11
Locality Index
12
Reference
13
List of annexures
Page No| 13
Key plan
Location Plan on Cadastral plan
Location plan on Toposheet. (1: 50,000)
Lithologs of the drilled boreholes.
Reserve Calculation map
The contractor has to submit final exploration report within six months period
after submission of full analysis data from GMRDS
GMRDS responsibility :
To provide bore hole location plan
To provide analysis data for all collected samples during exploration work for
exploration report writing work
Contractor responsibility : In addition to above scope of work following are
additional responsibilities
In case the proposed borehole location are in private land, the contractor has
to make his own arrangement for drilling of borehole in private land.
Contractor has to make his own arrangement for approach road, availability
of land, clear entry, exit and transit at the place of work/borehole location
Contractor has to provide weekly/monthly progress report and respect of
drilling and sampling.
After completion of drilling contractor have to seal (plug) each borehole and
shall construct and erect pillars of standard sizes with borehole number.
Site preparation supply of diesel, lubricant, tools tackles drilling machineries,
transportation of manpower to the drilling site, lodging and boarding
The Contractor shall make his own arrangement for shifting the drilling rigs to
new location / site at his own cost.
The contractor shall arrange the wooden core boxes for preserving the core at
his own cost.
The contractor shall make his own arrangement for diesel, Lubricants, all other
consumables, power, Camping, Transportation Etc.
3) Duration and quantity of work:
(a) The period of the contract and quarterly target will be as Under
Offer for
1,50,000 meters
The Bidder has to quote single rate for exploration in Rs. per running
meters for all depth & formation in given price bids.
(b)
Rate quoted shall remain valid for 180 days from the date of opening of
the technical bid, which shall have to be extended unconditionally for
further maximum of period 60 days, as deem fit by GMRDS
(c)
The firm rate quoted by the successful tenderer shall be valid for the
entire currency of the contract. No escalation in the rates will be
allowed on any account.
(d)
The rates quoted by the tenderer shall be free from corrections and
over writings. Tenders containing over writing, erased rate(s),
corrections or illegible rates shall be liable for rejection.
Page No| 15
5)
ii.
iii.
8)
9)
The Contractor shall submit the monthly Running account bills for
completed Bore holes to Head office GMRDS with following documents
.In no case bill for uncompleted bore hole will be made.
ii.
MODE OF PAYMENT:
90% payment will be made from GMRDS Head office after submission of
Monthly Running bill.
The final 10% payment will be released from Head Office after submission of
Exploration Report.
Page No| 17
The Running Account bills, submitted at Head Office will be processed, after
considering following deductions.
i. Income tax as per provision of Income Tax Act, and other Taxes (and surcharges) applicable in force from time to time
ii. Security Deposit @ 5% of the gross amount of the RA bill as per clause No.2
iii. If any amount becomes payable by as a result of any claim or application in
terms of the provisions or non-compliance of provision of the any Acts and the
Rules and Regulations, By-laws or the orders made there under, applicable
from time to time, such amounts shall be recoverable from the tenderer for
which GMRDS will not be responsible for any compensation.
iv. Liquidated damages or penalty if any.
v. Any other applicable deduction.
10)
b)
c)
12)
MEASUREMENTS
Measurements of quantum of work (i...e in meter) drilled by drill machine will
be carried out in presence of an authorized representative of the contractor
and Geologist at site in charge deputed from GMRDS for look after the entire
work and will also certify the same.
This measurement shall be final and binding to the contractor.
13)
2.
Page No| 19
14)
3)
4)
GMRDS reserves the right to terminate the contract and get the
balance work completed at the cost and risk of the bidder if cumulative
short fall is found more than 20% for five consecutive months/ RA bill
period
Likewise, if the Contractor does not fulfil the terms and conditions of
the contract and does not carry out the work up to the entire
satisfaction of GMRDS, GMRDS has the right to forthwith terminate the
contract at its sole discretion, without assigning any reason, Under such
events, the GMRDS shall be entitled to forfeit the security deposit paid
by the Contractor and the GMRDS shall have a right to complete the
work and / or to get the work completed at the risk and cost of the
Contractor.
c)
Page No| 20
15)
SUB-CONTRACTS
The Contractor shall not assign or sub-contract any portion of this work
without the prior written consent of GMRDS.
16
17
FORCE MAJEURE
(a)
(b)
ii.
The contractor will advise, in the event of his having resort to this
clause by a registered letter duly certified by the statutory authorities,
the beginning and end of the cause of delay, within fifteen days of the
occurrence and cessation of such Force Majeure condition. In the event
of delay lasting over two months, if arising out of Force Majeure, the
contract may be terminated at the discretion of the Corporation.
Page No| 21
18)
(c)
For delay arising out of Force Majeure, the contractor will not claim
extension in completion date for a period exceeding the period of delay
attributable to the causes of force Majeure and neither company nor
he Contractor shall be liable to pay extra costs (like increase in rates,
remobilization, advance, idle charges for labour and machinery etc.)
provided it is mutually established that the Force Majeure conditions
did actually exist.
(d)
(e)
COMPLETION OF WORK
a. When the Contractor fulfils all its obligations under the contract to the
satisfaction of General Manager (P)/Head of the department (as
applicable) and subject to terms and conditions of the Contractors, it
shall be eligible to apply for completion certificate. The General
Manager (P)/Head of the department (as applicable) shall formally
issue completion certificate after verifying from the completion
documents and satisfying himself that the work has been completed in
accordance with all the provisions of this contract and instructions
issued to the contractor by the GMRDS and (concerned authorities)
from time to time. The contractor after obtaining the completion
certificate is eligible to
b. Within completion of the work in all respects as defined in the tender
document, the contractor shall be required to obtain from the General
Manager (P)/Head of the department (as applicable) such completion
certificates as to the (clearing of the areas on the downhill side of site
of all rubbish dirt, rock overburden materials, structures etc..)(may be
modified as per the scope/requirement)
Page No| 22
(d)
(e)
In case of statutory variation in taxes, duties etc... The following clause may be
incorporated:
Any statutory increase / decrease in duties, taxes, cess etc. and / or introduction of
any new duties, taxes, cess, other levies etc., after the last date of submission of
tender till scheduled date of completion of work shall be to GMRDSs account subject
to submission of documentary proof of having remitted / adjusted the same and to
the extent directly related to the services rendered by the contractor.
i.
14 GENERAL CONDITONS
a)
b)
Contractor shall have to work during daylight only with at least half-an hour rest
interval. There will be no work on weekly days of rest and on paid/public holidays.
All the equipment to be deployed by the Contractor must be maintained in proper
working order and be fitted with all the required safety devices.
For any dispute arising out of this Work Order or interpretation of any terms thereof,
the decision of the Committee consisting of concerned Project Head (currently
G.M.[Geo] at H.O., concerned Head of the Exploration Circle (CGM/GMRDS), &
Chairman GMRDS, shall be final and binding upon the tenderer.
i. In case of any Central/State Government directives regarding execution of
work related thereto, the same shall have to be strictly adhered to and
binding upon the tenderer for implementation, for which GMRDS will not
be responsible for any.
Page No| 24
Technical Bid:
FORM A
Status of the Tenderer
Sr.No.
1
2
3
4
5
Particular
Name of the Company/individual /society /firm
Address
Phone No.
Fax no.
Email-id
Name and mobile no of authorized contact person
6
7
8
9
Financial evolution
Tender fee (Amount / ch/DD no)
EMD(Amount / ch/DD no)
Turn over of the company (In case of JV turnover of
Principal company)
2010 - 11
2011-12
2012-13
Total Core drilling experience in meters
2006-07
2007-08
2008-09
2009 10
2010-11
2011-12
2012-13
No of drilling Machines
Man power details
Geologist (Nos)
Surveyor (Nos)
Other (Specify)
10
11
12
Detail
Bidders has to attached hard copy of the balance sheet, work order & work
completion certificate along with above table in physical submission
Page No| 25
Contract
Client
No
and
date
Details
of Work
Order
Value
in Rs
Bidders has to attached hard copy of the work order & work completion certificate along
with above table in physical submission of the tender
Location
Drilling Mechanics
Pump
Accessories
Bidders has to provide documentary evidence for manpower & machinery (With catalog) in
physical submission of the tender
Page No| 26
DECLARATION
(On letter head of the Bidder)
FROM:
DATE:
To,
Director (Tech)
Gujarat Mineral Research & Development Society
(Industries & Mines Department, Govt. of Gujarat: U.T.)
Block 1/7 Udyogbhavan, Gandhinagar -380 017
Dear Sir,
I/we here by solemnly declare that any of our Directors or Partners, jointly or
severally and/or individually or our firm/company have not been black listed by the
Central Govt. or the State Govt. or its undertakings.
I/we here by further declare that, if the declaration is found untrue, the GMRDS shall
be entitled to take any action against us severally and/or individually or our
firm/company in this regard in any manner that may be deemed fit by GMRDS.
Yours faithfully,
_________________________
Signature and Stamp of the contractor
Page No| 27
E- TENDER
FOR
EXPLORATION OF
LIMESTONE, BAUXITE, CLAYS
&
OTHER ASSOCIATED MINERALS WITH
HYDRAULIC
CORE DRILLING RIGS
IN
GUJARAT
(Price- Bid)
Bidding for:
00 to 150 meters
Dated: ______________
Page No| 29