Sunteți pe pagina 1din 14

M900/M1800 Base Station Subsystem

Signaling Analysis Manual

Contents

Contents
B Difference between Phase1- Phase2- Phase2+....................................................................B-1
B.1 Difference between Messages o the A Interface in Different Phases ............................................................ B-2
B.2 Difference Analysis......................................................................................................................................... B-2

Issue 01 (2007-03-15)

Huawei Technologies Proprietary

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

Tables

Tables
Table B-1 message differences in Phase1/Phase2/Phase2+................................................................................. B-2
Table B-2 message IE difference in Phase1-Phase2-Phase2+Phase1Phase2Phase2........................................... B-9

ii

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Difference between Phase1- Phase2Phase2+

About This Chapter


The following table lists the contents of this chapter.
Title

Description

B.1 Difference between Messages


on the A Interface in Different
Phases

Introduces the differences between the A interface


messages in PHASE 1, PHASE 2, and PHASE 2+.

B.2 Difference Analysis

Analyses the differences in the IEs of the A interface


messages in PHASE 1, PHASE 2, and PHASE 2+.

Issue 01 (2007-03-15)

Huawei Technologies Proprietary

B-1

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

B.1 Difference between Messages on the A Interface in


Different Phases
The GSM technical specification is a standard constantly improved and perfected. With the
introduction of Phase1, Phase2 and Phase2+, GSM provides different new services for user to
satisfy the requirements from the market. Phase1 of the GSM technical specification includes
3.x.x series standard; Phase2 includes 4.x.x series standard, and the subsequent series
standards 5.x.x, 6.x.x and 7.x.x belong to Phase2+. This technical specification provides good
compatibility in the development.
This section gives the development of the A-interface L3 protocol (GSM 08.08) in each phase.
To facilitate description, take the typical protocol in each phase for analysis: GSM08.08
version 3.10.1 is for Phase1, GSM08.08 version 4.7.1 for Phase2, and GSM08.08 version
7.6.1 for Phase2+.

B.2 Difference Analysis


Message Differences in Phase1-Phase2-Phase2+
Table B-1 illustrates the message differences in Phase1/Phase2/Phase2+.
Table B-1 message differences in Phase1/Phase2/Phase2+
Message

Phase1

Phase2

Phase2+

Assignment
Request

Supported

Layer 3 header information


changed as optional IE

Group Call Reference


newly added, optional
IE

RADIO CHANNEL
IDENTITY cancelled,
optional IE

Assignment
Complete

Supported

Talker Flag newly


added, optional IE

CLASSMARK
INFORMATION
2Reference newly added,
optional IE

LSA Access Control


Suppression newly
added, optional IE

Radio channel identity


cancelled,

Circuit Identity Code


newly added, optional
IE

Chosen channel Reference


newly added, optional IE
Chosen encryption
algorithm Reference newly
added, optional IE

Circuit Pool newly


added, optional IE
Speech Version
(Chosen) newly added,
optional IE
LSA Identifier newly
added, optional IE

B-2

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Message

Phase1

Phase2

Phase2+

Assignment
Failure

Supported

Basically consistent, with


cause value adjusted

Circuit Pool newly


added, optional IE
Circuit Pool List newly
added, optional IE
Some cause values
added

Block

(BSC to MSC)
supported

(BSC to MSC) supported

Changed as
bi-directional
(MSC-BSC) messages:
(MSC to BSC)
Connection Release
Requested Reference
newly added, optional
IE

Blocking
Acknowledge

Supported

Supported

Changed to
bi-directional

Unblock

(BSC to MSC)
supported

(BSC to MSC) supported

Changed to
bi-directional

Unblocking
Acknowledge

Supported

Supported

Changed to
bi-directional

Issue 01 (2007-03-15)

Huawei Technologies Proprietary

B-3

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Message

Phase1

Phase2

Phase2+

Handover
Request

Supported

Radio channel identity


cancelled,

Current Channel type 1


newly added, optional
IE

Cause Reference newly


added, optional IE
Classmark information
Reference newly added,
optional IE

Speech Version (Used)


newly added, optional
IE
Group Call Reference
newly added, optional
IE
Talker Flag newly
added, optional IE
Configuration
Evolution Indication
newly added, optional
IE
Chosen Encryption
Algorithm (Serving)
newly added, optional
IE
Old BSS to New BSS
Information newly
added, optional IE
LSA Information
newly added, optional
IE
LSA Access Control
Suppression newly
added, optional IE

Handover
Required

Supported

Optional IE Cell identifier


list (preferred) modified as
mandatory
Current radio environment
cancelled, optional IE
Environment of BS "n"
cancelled, optional IE

Circuit Pool List newly


added, optional IE
Current Channel Type
1 newly added,
optional IE
Speech Version (Used)
newly added, optional
IE
Queuing Indicator
newly added, optional
IE
Old BSS to New BSS
Information newly
added, optional IE

B-4

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Message

Phase1

Phase2

Phase2+

Handover
Request
Acknowledge

Supported

Layer 3 Information
modified in code

Circuit Pool newly


added, optional IE

Chosen channel Reference


newly added, optional IE

Speech Version
(Chosen) newly
added, optional IE

Chosen encryption
algorithm Reference newly
added, optional IE

Circuit Identity Code


newly added, optional
IE
LSA Identifier newly
added, optional IE

Handover
Command

Supported

Layer 3 Information
modified in code

Cell Identifier newly


added, optional IE

Handover
Complete

Supported

Supported

Supported

Handoer
Succeeded

Not supported

Not supported

Newly added

Handover
Candidate
Enquire

Supported

Optional IE Cell identifier


modified as mandatory

Supported

Handover
Canidate
Response

Supported

Optional IE Cell identifier


modified as mandatory

Supported

Handover Failure

Supported

Supported

Circuit Pool newly


added, optional IE
Circuit Pool List newly
added, optional IE

Resource
Request

Supported

Optional IE Cell identifier


modified as mandatory

Supported

Extended Resource
Indicator Reference newly
added, optional IE
Resource
Indication

Supported

Resource Indication Method


newly added, Mandatory IE

Supported

Mandatory IE Resource
available modified as
optional
Total Resource accessible
newly added, optional IE
Paging

Supported

TMSI code changed


Channel Needed newly
added, optional IE

Clear Request

Issue 01 (2007-03-15)

Supported

Supported

Huawei Technologies Proprietary

eMLPP Priority newly


added, optional IE

Supported

B-5

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Message

Phase1

Phase2

Phase2+

Clear Command

Supported

Mandatory IE Layer 3
header information modified
as optional

Supported

Clear Complete

Supported

Supported

Supported

Reset

Supported

Supported

Supported

Reset
Acknowledge

supported

Supported

Supported

handover
Performed

Supported

Optional IE Cell identifier


modified as mandatory

Speech Version
(Chosen), optional IE

Optional IE Radio channel


identity deleted

LSA Identifier newly


added

Chosen channel newly


added, optional IE
Chosen encryption
algorithm newly added,
optional IE
Overload

Supported

Supported

Supported

Trace Invocation

Supported

Modified as 2 messages:

Modified as 2
messages:

MSC INVOKE TRACE ;


BSS INVOKE TRACE

MSC INVOKE
TRACE ;
BSS INVOKE
TRACE

MSC Invoke
Trace

Not supported

Newly added

Supported

BSS Invoke
Trace

Not supported

Newly added

Supported

Classmark
Update

From BSC to
MSC

Modified as bi-directional

Supported

Change to the optional IE


Classmark information type
2
Classmark information type
3 newly added, optional IE

Cipher Mode
Command

Supported

Mandatory IE Layer 3
header information modified
as optional

Supported

Cipher response mode


newly added, optional IE

B-6

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Message

Phase1

Phase2

Phase2+

Cipher Mode
Complete

Supported

Layer 3 message contents


newly added, optional IE

Supported

Chosen encryption
algorithm newly added,
optional IE
Complete Layer3
Information

Supported

Chosen channel newly


added, optional IE

LSA Identifier List


newly added, optional
IE
APDU newly added,
optional IE

Queuing
Indication

Supported

Supported

Supported

SAPI "n" Reject

Supported

Supported

Supported

SAPI "n" Clear


Command

Supported

Not supported

Not supported

SAPI "n" Clear


Complete

Supported

Not supported

Not supported

handover
Required Reject

Supported

Supported

Supported

Reset Circuit

Supported

Supported

Supported

Reset Circuit
Acknowledge

Supported

Supported

Supported

Handover Detect

Supported

Supported

Supported

Circuit Group
Block

Not supported

Newly added (from BSC to


MSC)

Supported(bi-direction
al)

Circuit Group
Blocking
Acknowledge

Not supported

Newly added (from MSC to


BSC)

Supported
(bi-directional)

Circuit Group
Unblock

Not supported

Newly added (from BSC to


MSC)

Supported
(bi-directional)

Circuit Group
Unblock
Acknowledge

Not supported

Newly added (from MSC to


BSC)

Supported
(bi-directional)

Confusion

Not supported

Newly added

Supported

Classmark
Request

Not supported

Newly added

Supported

Unequipped
Circuit

Not supported

Newly added

Supported

Cipher Mode
Reject

Not supported

Newly added

Supported

Issue 01 (2007-03-15)

Huawei Technologies Proprietary

B-7

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

B-8

Message

Phase1

Phase2

Phase2+

Load Indication

Not supported

Not supported

Newly added

VGCS.CBS
Setup

Not supported

Not supported

Newly added

VGVS/VBS
Setup ACK

Not supported

Not supported

Newly added

VGCS/VBS
Assignment
Request

Not supported

Not supported

Newly added

VGCS/VBS
Assignment
Result

Not supported

Not supported

Newly added

VGCS/VBS
Assignment
Failure

Not supported

Not supported

Newly added

VGCS/VBS
Assignment
Indication

Not supported

Not supported

Newly added

Uplink Request

Not supported

Not supported

Newly added

Uplink Request
Acknowledge

Not supported

Not supported

Newly added

Uplink Request
Confirmation

Not supported

Not supported

Newly added

Uplink Release
Indication

Not supported

Not supported

Newly added

Uplink Reject
Command

Not supported

Not supported

Newly added

Uplink Release
Command

Not supported

Not supported

Newly added

Uplink Seized
Command

Not supported

Not supported

Newly added

Suspend

Not supported

Not supported

Newly added

Resume

Not supported

Not supported

Newly added

Change Circuit

Not supported

Not supported

Newly added

Change Circuit
Acknowledge

Not supported

Not supported

Newly added

LSA Information

Not supported

Not supported

Newly added

Location
Information
Command

Not supported

Not supported

Newly added

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

Message

Phase1

Phase2

Phase2+

Location
Information
Report

Not supported

Not supported

Newly added

message IE difference in Phase1-Phase2-Phase2+Phase1Phase2Phase2


Table B-2 illustrates the IE differences of messages in Phase1/Phase2/Phase2+.
Table B-2 message IE difference in Phase1-Phase2-Phase2+Phase1Phase2Phase2
ELEMENT

Phase1

Phase2

Phase2+

Circuit identity code

Supported

Supported

1544k/s supported

Radio channel identity

Supported

Deleted

Deleted

Resource available

Supported

Supported

Supported

Cause

Supported

Directed Retry
added

Joined group call


channel added

Invalid cell added

Traffic added

Invalid message
contents added

Traffic Load added

Information
element or field
missing added

Circuit pool mismatch


added

Incorrect value
added
Unknown
Message type
added
Unknown
Information
Element added

Preemption added

Switch Circuit pool


added
Requested speech
version unavailable
added
LSA not allowed added
VGCS/VBS call non
existent added

Cell identifier

Supported

Supported

Support for PCS1900


newly added

Priority

Supported

PCI domain added

Supported

Layer 3 header
information

Supported

Supported

Supported

IMSI

Supported

Supported

Supported

TMSI

Supported

Supported

Supported

Encryption information

Supported (only
A5/1 not
encrypted)

Supported (A5/1
A5/2 A5/3 A5/4
A5/5 A5/6 A5/7
not encrypted)

Supported A5/1 A5/2


A5/3 A5/4 A5/5 A5/6
A5/7 not encrypted)

Issue 01 (2007-03-15)

Huawei Technologies Proprietary

B-9

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

ELEMENT

Phase1

Phase2

Phase2+

Channel type

Supported

Channel rate type


newly added

multi-timeslot
assignment supported

Full/half rate
preferred, optional
Speech version 1
supported

Multi-speech version
like EFR,AMR
supported

Data service rate


improved

B-10

Periodicity

Supported

Parameter strictly
defined

Parameter strictly
defined

Extended resource
indicator

Not supported

Newly added

SM domain newly
added

Number of MSs

Supported

Supported

Supported

Current radio
environment

Supported

Deleted

Deleted

Environment of BS "n"

Supported

Deleted

Deleted

Classmark information
type 2

Supported

Code of
CLASSMARK 2
modified

Supported

Classmark information
type 3

Not supported

Newly added

Supported

Interference band to be
used

Supported

Supported

Supported

RR Cause

Supported

Supported

Supported

Trace number

Supported

Deleted

Deleted

Layer 3 information

Supported

Supported

Supported

DLCI

Supported

Supported

Supported

Downlink DTX flag

Supported

Supported

Supported

Cell identifier list

Supported

Supported

Newly addedPCS1900
supported

Response Request

Supported

Supported

Supported

Resource Indication
Method

Supported

Supported

Supported

Classmark information
type 1

Supported

Supported

Supported

Circuit identity code list

Not supported

Newly added

Supported

Diagnostic

Not supported

Newly added

Supported

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

ELEMENT

Phase1

Phase2

Phase2+

Layer 3 message
contents

Not supported

Newly added

Supported

Chosen channel

Not supported

Newly added

channel mode domain


added
Newly added
multi-channel supported

Total resource accessible

Not supported

Newly added

Supported

Cipher response mode

Not supported

Newly added

Supported

Channel needed

Not supported

Newly added

Understanding of 11
modified, half/full rate
supported

Trace type

Not supported

Newly added

Supported

Trigger Id

Not supported

Newly added

Supported

Trace reference

Not supported

Newly added

Supported

Transaction Id

Not supported

Newly added

Supported

Mobile identity

Not supported

Newly added

Supported

OMC Id

Not supported

Newly added

Supported

Forward indicator

Not supported

Newly added

Supported

Chosen encryption
algorithm

Not supported

Newly added

Supported

Circuit Pool

Not supported

Not supported

Newly added

Circuit Pool List

Not supported

Not supported

Newly added

Time Indication

Not supported

Not supported

Newly added

Resource Situation

Not supported

Not supported

Newly added

Current Channel type 1

Not supported

Not supported

Newly added

Queuing Indicator

Not supported

Not supported

Newly added

Speech Version

Not supported

Not supported

Newly added

Assignment
Requirement

Not supported

Not supported

Newly added

Talker Flag

Not supported

Not supported

Newly added

Connection Release
Requested

Not supported

Not supported

Newly added

Group Call Reference

Not supported

Not supported

Newly added

EMLPP Priority

Not supported

Not supported

Newly added

Issue 01 (2007-03-15)

Huawei Technologies Proprietary

B-11

M900/M1800 Base Station Subsystem


Signaling Analysis Manual

B Difference between Phase1- Phase2- Phase2+

B-12

ELEMENT

Phase1

Phase2

Phase2+

Configuration Evolution
Indication

Not supported

Not supported

Newly added

Old BSS to New BSS


Information

Not supported

Not supported

Newly added

LSA Identifier

Not supported

Not supported

Newly added

LSA Identifier List

Not supported

Not supported

Newly added

LSA Information

Not supported

Not supported

Newly added

LCS QoS

Not supported

Not supported

Newly added

LSA access control


suppression

Not supported

Not supported

Newly added

LCS Priority

Not supported

Not supported

Newly added

Location Type

Not supported

Not supported

Newly added

Location Estimate

Not supported

Not supported

Newly added

Positioning Data

Not supported

Not supported

Newly added

LCS Cause

Not supported

Not supported

Newly added

LCS Client Type

Not supported

Not supported

Newly added

APDU

Not supported

Not supported

Newly added

Network Element
Identity

Not supported

Not supported

Newly added

GPS Assistance Data

Not supported

Not supported

Newly added

Deciphering Keys

Not supported

Not supported

Newly added

Return Error Request

Not supported

Not supported

Newly added

Return Error Cause

Not supported

Not supported

Newly added

Segmentation

Not supported

Not supported

Newly added

Huawei Technologies Proprietary

Issue 01 (2007-03-15)

S-ar putea să vă placă și