RESULT OF INSPECTION
ROTATING EQUIPMENT - PUMP

I.

II.

GENERAL DATA
1.

Tag No.

2.
3.
d
5.
6.
7.
8.
9.
10.
11.

Name of equipment
Service
Type of Equipment
Owner
Manufacturer
Manufacturer Serial No.
Year of Built
Specification
Location
Inspection Date

TECHNICAL DATA
1.
2.
3.
4.
5.
6.
7.
8.

III.

: P-02
: LPG Pump
: Gas
: Centrifugal
: PT SANGKULIRANG ENERGI UTAMA
: Stearling Sihi
: 10-11020-02
: 2010
: API 610
: SPPBE Swarga Bara,Kutai-KalSel
: Oct 29th 2014

Capacity Rating
Discharge Pressure
Differential Head
MAWP
Speed
Direction of Rotation
Size (Suction x Discharge)
Driver / Prime Mover
- Type
- Manufacturer
- Power Capacity
- Speed

:
:
:
:
:
:
:

7,5
10
70
12
1460
CCW
4 x 3

:
:
:
:

Electric Motor
Siemens
45
KW
1465
RPM

m3/h
Kg/cm 2
M
Kg/cm 2
rpm

INSPECTION SUMMARY
Form For Pump Result of Inspection

Page 2 of 3

NO.
1.

DESCRIPTION

LEVEL OF
INSPECTION

ACCEPTANCE
CRITERIA /
REFERENCE

LEVEL OF
ACCEPTANCE

REMARKS

DOCUMENT REVIEW
a. Specification

N/A

b. Drawing (s)
-

Lay out
P & ID
Area Classification
Grounding Lay Out

c. Data Sheet

d. Manufacturer Document :
- Technical Data
- Acceptance Test Report
- Manufacture Certificate

2.

N/A
Reviewed
Reviewed
Reviewed
Reviewed

Reviewed
R
e
v
i
e
w
e
d
R
e
v
i
e
w
e
d

e. Visual Examination & Dimensional Check


Report

Reviewed

f. Performance Test Report

Verified

g. Test procedure

Reviewed

h. Operating & Maintenance Manual

Reviewed

VISUAL INSPECTION & VERIFICATION


a. Name plate

Verified

OK

Photo

b. Unit Condition / Physical Condition

Verified

OK

No Damage

c. Foundation

Verified

OK

Tighten

d. Main & control cable

Verified

OK

Isolated

e. Liquid level

Verified

OK

f. Control Panel

Verified

OK

Level
properly
Function
Properly

g. Gauge / meter instrument

Verified

OK

Installed

h. Emergency stop device

Verified

OK

Function
Properly

i. Warning sign & safety equipment

Verified

OK

Installed

ACC

ACC

Form For Pump Result of Inspection

Page 3 of 3

ACCEPTANCE
CRITERIA /
REFERENCE

LEVEL OF
ACCEPTANCE

REMARKS

OK

On Skid

OK

On Skid

c. Mechanical Shaft Seal

Verified

Visual

OK

d. Protective and Control Device Operational

Verified

Visual

OK

Function
Properly

e. Shaft Sleeve Leakage

Verified

Visual

OK

No Leak

3.2 PERFORMANCE RUN TEST


a. Flow rated (GPM)

OK

b. Discharge Pressure (Psi)

OK

OK

d. Pump Temperature ( C)

OK

e. Voltage (V)

OK

f. Current (A)

OK

g. Pump Speed (rpm)

OK

h. Max Sound Press Level Reqd (dBA)

NO.
3.

DESCRIPTION

VERIFICATION OF PERFORMANCE TESTING RESULT


3.1 MECHANICAL PERFROMANCE
a. Vibration (mm/s )
o

b. Bearing Temperature ( C)

c. Engine Temperature ( C)
o

IV.

RESULT

CONCLUSION
Based on the inspection and verification, THIS IS TO REPORT that the pump with Tag No. P-2 / 10-11020-02
has been manufactured, installed and operated satisfactory in compliance with the applicable Code/Standard,
Specification, Drawings, and Government Requirement.

Inspected by,

Ditjen Migas

Form For Pump Result of Inspection