Type: Service Work Instruction

220KV HARA SS 33KV ISOLATOR


MAINTENACE WORK

Date: 2015-02-06
Class: 1
Page 1 of 9

220KV HARA SS 33KV Isolator Maintenance work


Anyone using this document must read this document in its entirety before performing any work.
Any questions or concerns regarding any of the instructions contained in this document must be
Referred to Vestas.

History of this Document


Version
no.
00

Date

Description of changes

09.02.2015

220KV HARA SS 33KV Isolator Maintenance work

Table of Contents
1. Safety
2. Educational Requirements of Service Technician
3. Terms and Abbreviations
4. Required Documentation
5. Purpose
6. Risk Assessment
7. Note
8. Tools
9. Consumables

QMS 00087 V00

10. Shut down Procedure


11. LOTO Procedure
12. Working Procedure
13. 5S to be done

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Technical
approver
00

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Date: 2015-02-09
Class: 2
Page 2 of 9

Safety

All work involved in the operation and maintenance of Substations including work methods and practices, employee
training and protective measures, and use of tools and equipment, shall be in accordance with the requirements of the
applicable governmental and private occupational safety and health codes and standards. Employers engaged in such
work are also required to be familiar with and comply with Vestas Corporate OH&S Manual and documents holding
specific Substation safety instructions for the relevant, Vestas shall not be responsible for any liabilities arising from
failure to comply with such requirements. Vestas reserves the right to inspect such work to ascertain such compliance.
The service technician must read and understand the Personal Protection Sheets for each of the chemicals used in this
instruction. The Personal Protection Sheets describe the safe use of chemicals within each category.
For chemicals not specified with exact name and item no., contact the local SBU for information regarding Personal
Protective Equipment (PPE) and other safety instructions related to the use of the chemical.
Personal Protection Equipment
Item. No.

Quantity

Description
Standard personal protective equipment (PPE).
Chemical PPE according to 0001-0410 Personal
Protective Equipment Information Sheets.

Educational Requirements of Service Technician

At least two of the service technicians working in a Substation are required to possess valid course
certificates for the Vestas Basic Safety Training for Service Technicians, Supervisory License including
basic safety theory, first aid, fire prevention and firefighting, emergency descent and any additional safety
courses owing to local requirements.
Some tasks require one or more advanced training modules or job specific training as described in the
Vestas Technical Training Programme. The person planning a specific task must ensure that the service
technicians involved possess the proper know-how for completion of that task.

Terms and Abbreviations

Term or
abbreviation

Definition

OH&S

Occupational Health & Safety

PPE

Personal Protective Equipment

SBU

Sales Business Unit

SS

Substation

PTW

Permit to Work

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Term or
abbreviation

Definition

Disconnector

Isolator

CIR

Component Inspection Report

RA

Risk Assessment

JSEA

Job Safety Environment Analyses

MS

Method Statement

LOTO

Lock out Tag Out

MSDS

Material safety Data Sheet

Date: 2015-02-09
Class: 2
Page 3 of 9

Table 3-1: Abbreviations


Term

Explanation

Lock out-Tag out

Use of a sequence of physical locks and warning tags to


ensure that an electrical or mechanical device cannot be
accessed or energized.

Standard tools

Those tools normally using Calibrated and standard tools.

(SCADA)
A computer system that collects data from sensors and
Supervisory
machinery in order to monitor and control equipment in
Control and Data remote locations.
Acquisition
Table 3-2: Explanation of terms.

Required Documentation

Document no.

Title

0000-0496

Vestas Corporate OH&S Manual

0001-0410

Personal Protective Equipment (PPE) Information Sheets


LOTO Procedure
Relevant MSDSs for the chemicals used in this document
33kv Isolator manual.
Service Check List
RA, JSEA, MS and Permit to Work

Table 4-1: Required documentation

Purpose

This service work instruction describes how to perform 33kv Isolator maintenance in outdoor switch yard.

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Date: 2015-02-09
Class: 2
Page 4 of 9

Risk Assessment

Referring JSEA, MS, RA for maintenance of 33kv Isolator in Substation.

Note

The Maintenance of 33kv Isolator requires the following work

Isolate the HV / LV supply as per the LOTO Instructions.

Disconnect the Earthing and Auxiliary supply connections.

Organise the suitable tools for maintenance of 33kv Isolator.

After maintenance connect the all removed connections (Earthing, Auxiliary supply cables, LV & HV
isolation points).

Tools

Item no.

Quantity Description

VT-188191

01

Multimeter

VT-188076

01

Megger 5KV

10M X 02

10 Meter Wire for Meggaring

01

High Voltage detector

01

Allen key set

01

Tapariya set
DE & NDE Spanner Set 10mm to 36mm

01

01

17 to 21 Tube Bits (Clicker set)

Each 01

General tools Kit (Screw driver set, Adjustable


spanner, etc.)

01

Torque wrench

Consumables

Item no.

Quantity

Description

As required

Cotton waste

60047672

As required

Cleaning Agent Locktite 7070

236400

As required

Gloves Cotton Interlock

As required

Gloves nitrile

As required

Rustlick

70000423

As Required Petroleum jelly

10 Shutdown Procedure
10.1 Toolbox Talk
In Tool Box Discussing work related and safety related, safety Alert, HSE Messages.
Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Date: 2015-02-09
Class: 2
Page 5 of 9

10.2 Stop the WTG.


1. Notify affected employees that the turbine will be under LOTO for 33kv Isolator maintenance work. It is
mandatory to notify Vestas site management and any sub-contractor lead technicians if sub-contractors are
on site.
2. Before entering a SCADA-equipped turbine, call the site office and site management to remotely stop the
turbine.
3. After remote shutdown, the site management must enter a note in SCADA confirming work on Substation
maintenance.
10.3 Trip the respective line up and down side SF6 Circuit Breakers 0r 33kv VCB.

10.4 Open the respective line up and down side Isolators.

10.5 Check the absence of Voltage by using High Voltage detector.

General Inspection of HV Detector and Arc flash suit.

Condition of HV Detector and working of siren.

After wearing Arc flash suit wear HT hand gloves.

Keep the HV detector near to the dead line (Dont touch the HV detector to dead line).

Observe no hearing siren at near dead line.

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Date: 2015-02-09
Class: 2
Page 6 of 9

11. Apply the LOTO Procedure as per the LOTO instructions to


Respective line up and down side Isolators: Put Earth rods in both dead line side (always first connect
earth rod wire to earth pit connection and then put earth rod to dead line and discharge the power.) then
apply LOTO in AB Switch.

12. 33kv Isolator Working Procedure:


12.1 Visually inspect the General checks of 33kv Isolator like

General Condition of Isolator on Cleanliness.

Condition of marshalling box external internal paint.

Check the condition of Outer body welding joints.

Condition of Isolator name plate.

Before to work at any place read carefully the displayed WARNINGs.

Check the incoming side and outgoing side PG Clamps for hot spot.

Check the proper Earthing Connections.

Marshalling boxes inspections.

Gas refilling / collecting valves.

Check the cable gland nut and cable condition affected by environment.

Checks the painting condition if rusted apply paint.

Lubricate moving parts with correct lubricate.

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Follow instructions given in the operating manual.

Do not leave any tools at top of the Isolator.

Do not operate the Isolator while testing or cleaning.

Check the all hardwares tightness.

Date: 2015-02-09
Class: 2
Page 7 of 9

12.2 Bushings:

Check the hardware tightness at cone of the bushes.

Clean and observe around the bush for any damage.

Check the mounting hardware condition.

Check the hot spot at the HV terminals.

12.3 Marshalling box.

Using cable schedule & marshalling box wiring diagram check the interlock in between control panel
and Isolator marshalling box through proper communication cable.

Check all control cable condition and nomenclature in cables.

Check the Cable and Wires ferule availability and conditions.

Check the connections tightness at all the terminals.

Check the condition of operating handle earthing connections.

Check the Tendom rod condition and connections.

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Clean the inside marshalling box.

Close the unwanted cable holes to avoid entry of reptiles.

Check the cable rooting with proper cable ties.

Check the door locks condition and operating.

Check the heater, illumination lamp and aux. socket working condition etc.

Date: 2015-02-09
Class: 2
Page 8 of 9

13. 5S To be follow as.


1. All the structure parts and hardwares conditions are properly.
1. Do the housekeeping completely.
2. Get a conformation either all activity completed or not. If completed remove the established LOTO
system according to standards.
3. Remove the earth rod, return the PTW to respective in-charge and power up to transformer and
observe the humming noise during the time of charging. If u feels abnormality suddenly report to
management.
5. Keep door and covers firmly closed to prevent entry of dust, moisture and insects etc.
6. Ensure that Manual Operating handle is kept in the mechanism housing.

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Document no.:
Issued by:
Type: T09 Service Work Instruction

220/33KV SS 33kv Isolator maintenance work

Vestas Wind Systems A/S Alsvej 21 8940 Randers SV Denmark www.vestas.com

Date: 2015-02-09
Class: 2
Page 9 of 9