SAIC NUMBER
SAIC-G-2023
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
DATE APPROVED
QR NUMBER
25-May-05
Plumb
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
ACCEPTANCE CRITERIA
REFERENCE
A1
Each lift station shall have two sets of pumps, one set to handle normal
incoming flow, and the other set to handle the maximum incoming flow.
Exceptions:
1. This requirement is not applicable to the controlled drainage of diked
area. In this case the lift station shall have at least one set of pumps to
handle normal incoming flow.
2. Sumps, outside diked areas, for bulk plants and air fueling operations
shall be sized to hold 32,000 liters plus a maximum of five minutes of
deluge flow as specified in SAES-B-070 as a minimum.
3. If the difference between normal and maximum flows is 10% or less, a
single set of pumps sized for the maximum flow condition may be used.
A2
The Pump Set handling normal flow shall meet the following
requirements:
a) The Pump Set shall consist of one pump or a group of pumps of equal
operating capacity and one equal capacity standby pump.
b) The total capacity of operating pumps shall be based on normal
washdown, sampling, vessel drainage, etc.
c) The pumps may have a common power source
A3
The Pump Set handling maximum shall consist of one pump or a group
of pumps of equal operating capacity and one equal capacity standby
pump.
SAES-S-020
Para 4.14.5
A4
SAES-S-020
Para 4.14.6
A5
SAES-S-020
Para 4.14.15
A6
SAES-A-104
Para 5.2.1.4
A7
SAES-S-20
4.14.15
A8
SAES-S-20
4.14.16
A minimum of 12 air changes per hour is required for lift stations with
continuous ventilation. A capacity of 30 air changes per hour is required
when ventilation is intermittent.
SAES-A-104
Para 5.2.3.1
SAES-S-020
Para 4.14.3
SAES-S-020
Para 4.14.4
B1
Page 1 of 2
PASS
FAIL
N/A
RE-INSP DATE
ITEM
No.
DATE APPROVED
SAIC-G-2023
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
B2
SAES-A-104
Para 5.2.3.3
B3
Where the pump pit is below the ground surface or within an enclosure,
mechanical ventilation is required which shall ventilate the dry well and
the wet well independently.
Note: There shall be no interconnections between the wet well and the
dry well ventilating systems
SAES-A-104
Para 5.2.3.2
B4
SAES-A-104
Para 5.2.3.3
QR NUMBER
25-May-05
Plumb
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
REMARKS:
REFERENCE DOCUMENTS:
SAES-A-104 -- Wastewater Treatment, Reuse and Disposal, June, 30, 2003
SAES-S-020 -- Industrial Drainage and Sewers, 30 November, 2002
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
PID Representative
QC Inspector
Performed Inspection
QC Supervisor
Quality Record Approved:
Name, Sign and Date:
Name, Organization,
Initials and Date:
Y = YES
Page 2 of 2
N = NO F = FAILED