Sunteți pe pagina 1din 4

vii

LIST OF FIGURES
Figure 1-1: Plunger lift
Figure 1-2: Rod pump
Figure 1-3 API rod Pump designation
Figure 1-4: PCP
Figure 1-5 Hydraulic Lift
Figure 1-6: ESP
Figure 1-7 Gas lift
Figure 3-1 shows the packing type of Compression packing
Figure 3-2 Show a position of Piper valve and Ball Valve (Suction sys.)
Figure 3-3 Show a position of ball valve (injection sys.) and Choke adjustable
(injection sys.)
Figure 3-4 Show a position of the Swab valve at the wellhead Christmas tree
Figure 3-5 Show a position of Ball valve 1, 2 (Production sys.)
Figure 3-6 Show a position of the ball valve (inlet accumulation, Outlet
Production and Outlet suction).
Figure 3-7 Show a position of Gate valve (Production sys.)
Figure 3-8 Show a position of the dual basket strainer 300 lb.
Figure 3-9 Show a position of Start Switch and Power Switch
Figure 3-10 Show a position of Plunger candle cover and Crosshead cover
Figure 3-11 Show a position of Crankshaft.
Figure 3-12 Show a position extension rod stand before loosen
Figure 3-13 Show the extension rod and plunger
Figure 3-14 Show the plunger slide into the stuffing box
Figure 3-15 Show after remove the extension and Wiper box
Figure 3-16 Show the plunger that removed from the pump
Figure 3-17 Show stuffing box, gland nut and Stuffing gland box bushing
Figure 3-18 show the bushing
Figure 3-19 Show the packing rings and the follower of bushing
Figure 3-20 Show the stuffing Box
Figure 3-21 Show the Stuffing box retainer nut and Stuffing box retainer
Figure 3-22 Show the stuffing box
Figure 3-23 Show the stuffing box
Appendix A Fig 1-1 Show the component of the beam pumping.

Page
3
4
5
5
7
8
9
24
27
28
28
29
30
30
31
31
32
33
33
34
34
35
35
36
36
37
38
38
39
39
71

viii

LIST OF FIGURES (Continued)


Page
Appendix A Fig 1-2 Mark the center line.
72
Appendix A Fig 1-3 Mark the center line.
72
Appendix A Fig 1-4 Set the base.
72
Appendix A Fig 1-5 Set the base.
72
Appendix A Fig 1-6 Mark the position of the main frame centers.
72
Appendix A Fig 1-7 Mark the position of the main frame centers.
72
Appendix A Fig 1-8 Mark the center lines of the front of the unit frame.
73
Appendix A Fig 1-9 Mark the center lines of the front of the unit frame.
73
Appendix A Fig 1-10 Lift the structure on concrete.
73
Appendix A Fig 1-11 Align the center lines of the T-head and concrete base.
73
Appendix A Fig 1-12 fill the gear reducer to the appropriate level.
73
Appendix A Fig 1-13 Install the saddle bearing adapters to the Samson post.
73
Appendix A Fig 1-14 Attach the saddle bearing to the saddle bearing adapters.
74
Appendix A Fig 1-15 Attach the Samson post third leg to the Samson post.
74
Appendix A Fig 1-16 Position the hoisting sling between the legs at the
Samson post top.
74
Appendix A Fig 1-17 Attach the Pitman arms to the equalizer beam.
74
Appendix A Fig 1-18 Install the saddle bearing set screw bolts into the walking
beam.
74
Appendix A Fig 1-19 Install the guide lock.
75
Appendix A Fig 1-20 Install all bolts finger tight.
75
Appendix A Fig 1-21 Install the three banjo bolts.
75
Appendix A Fig 1-22 Install the three banjo bolts into the tapped housing.
75
Appendix A Fig 1-23 Check the clearance dimension.
75
Appendix A Fig 1-24 Check the clearance dimension .
75
Appendix A Fig 1-25 Adjust the saddle bearing.
76
76
Appendix A Fig 1-26 Install the Vbelts.
76
Appendix A Fig 1-27 Install the belt guard assembly.
Appendix A Fig 1-28 Install the wireline and reinstall the wireline retaining
76
plate.
77
Appendix A Fig 1-29 Slide the wireline ferrule buttons.
77
Appendix A Fig 1-30 Install the horsehead.
77
Appendix A Fig 1-31 Install the horsehead adjusting.

ix

LIST OF FIGURES (Continued)


Page
Appendix A Fig 1-32 Place the horsehead mounting pin on the horsehead
mount.
Appendix A Fig 1-33 Place the horsehead mounting pin on the weldment.
Appendix A Fig 1-34 Install the bolt into the horsehead mount.
Appendix A Fig 1-35 Install the pawl safety bolt.
Appendix A Fig 1-36 Check the center of the horsehead runners.
Appendix A Fig 2-1 Clean up motors.
Appendix A Fig 2-2 Check motor's connecting terminals check.
Appendix A Fig 2-3 Connection electric line into the motor.
Appendix A Fig 2-5 Connection electric line into the maincontrol.
Appendix A Fig 2-6 Test on.
Appendix A Fig 3-1 Annulus pressure grade.
Appendix A Fig 3-2 Production pressure grade.
Appendix A Fig 3-3 Injection pressure grade.
Appendix A Fig 3-4 Accumulative pressure grade.
Appendix A Fig 3-5 Resurevoir oil and water level.
Appendix A Fig 3-6 Reservoir temperature grade.
Appendix A Fig 3-7 Suction presure grade.
Appendix A Fig 3-8 Injection rate grade.
Appendix A Fig 3-9 Main control.
Appendix B Figure 1-1 Nuclear Applications.
Appendix B Figure 1-2 Carbon packing.
Appendix B Figure 1-3 General Device packing.
Appendix B Figure 1-4 PEFE packing.
Appendix B Figure 1-5 Abrasion Resistant Aramid Fiber Packing.
Appendix C Figure 1-1 Show the Rod Lift system.
Appendix C Figure 1-2 Show beam pumping system.
Appendix C Figure 1-3 Show Beam Pumping Unit Designations.
Appendix C Figure 1-4 Bottom hold-down insert pump.
Appendix C Figure 1-5 the plungers of pump.
Appendix C Figure 1-6 Ball and Seats.
Appendix C Figure 1-7 the API Pump Designation.
Appendix C Figure 1-8 the Rod string.
Appendix C Figure 1-9 the API T Couplings.

77
77
77
77
78
79
79
80
80
81
81
81
81
81
82
82
82
82
83
85
86
87
88
89
90
92
94
96
103
107
108
109
111

LIST OF FIGURES (Continued)


Appendix C Figure 1-10 the API Spray Metal Couplings
Appendix C Figure 1-11 the Sinker Bars

Page
111
112

S-ar putea să vă placă și