Sunteți pe pagina 1din 11

ICDS12

International Conference DURABLE STRUCTURES: from construction to rehabilitation


LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

STRENGHTENING AND REPAIR OF MOSTEIR BRIDGE

IC

DS

Joo Pinho, Jos David, Ricardo Antunes

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

MOSTEIR BRIDGE OVERVIEW

Mosteir Bridge: landmark bridge designed by the renowned Portuguese engineer Mr. Edgar Cardoso

Built in 1973: replacing steel bridge to be submerged by Carrapatelo Dam water

Length: 194 m / Width: 9.0 m

LNE
C

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES
MOSTEIR BRIDGE DECK

Continuous box-girder

Spans: 42 + 110 + 42 m

12

LNEC Lisbon 31 May - 1June 2012

Solid slabs / Truss web

Reinforced concrete + Post-tensioned concrete (top slab)

IC

DS

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

MOSTEIR BRIDGE PIERS

Casing and raising of the masonry piers


of the previous bridge with reinforced
concrete.

LNE
C

Central pier partially demolished

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES
MOSTEIR BRIDGE - ABUTMENTS
Casing and raising of the masonry
abutments of the previous bridge with
reinforced concrete

12

LNEC Lisbon 31 May - 1June 2012

DS

Bearings tied to the abutments through vertical high-strength steel bars, to withstand upward forces

Free abutment

IC

Fixed abutment

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

MOSTEIR BRIDGE REPAIR WORKS IN THE 1990s

1992: Breaking of steel bars connecting the deck to the bearings at the fixed abutment

Main repair works:

Replacement of broken high-strength bars

Strengthening of deck-abutment connection with four external PT cables

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES
PROJECT STAGES

1. Inspection and characterization

12

LNEC Lisbon 31 May - 1June 2012

Detailed topographic survey

Detailed inspection

Bathymetry survey

Underwater inspection

Concrete characterisation tests

Detailed geometric survey

Geotechnical investigation

DS

Data collection

2. Evaluation of structural safety

3. Strengthening and repair Design


Preliminary design
Detailed design

IC

4. Strengthening and repair Construction

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

INSPECTION AND CHARACTERIZATION - MAJOR DEFECTS FOUND

LNE
C

Strong vibration under heavy vehicle traffic

Vertical deformation at middle of central span


(16 cm)

Major transverse cracks in bottom slab at


central span

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

INSPECTION AND CHARACTERIZATION - MAJOR DEFECTS FOUND


Transverse cracking in diagonals in tension

abutment

DS

Concrete spalling near the bearings at fixed

IC

Unleveled expansion joint at fixed abutment (2 cm)

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

EVALUATION OF STRUCTURAL SAFETY

Goal: Understand origin of structural problems


Model 1: Same assumptions as the original design and standards

Model 2: Modern calculation methods and standards

LNE
C

Conclusion: Major effects were overlooked in the original design

Increase of bending moments at middle of central span due to creep

Seismic action (not required by the standards)

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

EVALUATION OF STRUCTURAL SAFETY - CONCLUSIONS


ULTIMATE LIMIT STATES

Insufficient tension strength in bottom slab at the central span


Tension stresses much higher than strength

Probable yielding of rebars

Loss of slab stiffness -> overall reduction of structural stiffness

DS

Insufficient strength of diagonals in tension (central span)

Insufficient strength of horizontal connection between deck and fixed


abutment
Not designed to withstand seismic action

IC

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

EVALUATION OF STRUCTURAL SAFETY - CONCLUSIONS

LNE
C

SERVICEABILITY LIMIT STATES

Cracking in bottom slab at central span

Linked to excessive tension

Defective vertical connection between deck and abutments

Reactions at bearings near zero for permanent loads

Insufficient stiffness of deck-abutment connection (provided only by


vertical PT cables)

Loss of stiffness of bottom slab led to higher forces in the connection

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

STRENGTHENING AND REPAIR WORKS - OVERVIEW

Strengthening:

Bottom slab (central span)

Diagonals

Connections between deck and abutments

Partial demolition of submerged pier

General repair and maintenance works (concrete, bearings)

DS

IC

Focus: Strengthen the bridge with minimal aesthetic impact

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

STRENGTHENING AND REPAIR WORKS BOTTOM SLAB


EXTERNAL POST-TENSION CABLES

Goals: Restore stiffness


Ensure compliance with SLS criteria

10 external PT cables inside the box girder

Minimize aesthetical impact, avoid reduction of river traffic clearance

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

STRENGTHENING AND REPAIR WORKS BOTTOM SLAB


CFRP PLATES
Goals: Provide tension strength to comply with ULS criteria
Control of cracking

48 CFRP plates on both faces of the slab

IC

DS

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

STRENGTHENING AND REPAIR WORKS DIAGONALS IN TENSION

48 diagonals intervened

Steel plates in internal faces (minimize aesthetic impact)

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

STRENGTHENING AND REPAIR WORKS CONNECTION DECK-ABUTMENT

Goal: Ensure compression of bearings for service loads


Reduce risk of fatigue in PT cables
Reduce vibrations
Two additional PT cables at each abutment

Anchored in truss system connected to the decks cross beam

IC

DS

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

CONCLUSIONS

LNE
C

Some decades ago, high relative cost of materials led engineers to search for their
maximum optimisation
Simplified approaches required by limited calculation methods could lead to
overlooking some effects (in this case, creep)

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

CONCLUSIONS

IC

DS

Deep structural strengthening achieved with minimal aesthetic impact

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

CONCLUSIONS

LNE
C

Cocktail of different technologies proved to be the best approach

Post-tension

Reinforced concrete

Carbon fiber plates

Steel

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

DS

12

LNEC Lisbon 31 May - 1June 2012

THANK YOU!

LNE
C

IC

MAY 2012

S-ar putea să vă placă și