1. This Form shall be used by the S&T official in the following cases:
a. For attending to failures.
b. For removal of interlocking gear of any kind.
c. For carrying out work in connection with lever frames, point track circuits, points, signals etc.,
involving disconnection.
2. Before commencing the work, the person in-charge of the work shall fill up the first part of the block
copy and obtain thereon the SMs signature.
3. Then, the person in-charge of the work shall fill up and sign the Disconnection Notice, detach and
hand over to SM.
4. The signature of the SM on the first part of the block is the authority for the signal branch to
commence the work.
5. During the time the work is in progress, all signals (excepting those which control movements over
lines which are not only isolated, by the setting of the points, from the line affected by the work but
are also maintained in the isolated condition by the interlocking during the passage of the train)
shall be treated as out of order and placed at ON by the signal branch staff.
6. If it is necessary to pass train or perform any shunting movement, SM shall advise the Official incharge of the work, by a memo stating in which position the points are to be set.
7. With the permission of the Official in-charge of the work, SM or other authorised staff shall arrange
to set and clamp the points to prevent any interference until the completion of train/shunting
movement.
8. SM shall observe rules 3.68 to 3.72 for allowing train/shunting movement to pass the signal/s at
ON.
9. After completion of train/shunting movement, the padlock and clamp shall be removed by the SM
or other authorised staff.
10. Then the Official in-charge of the work can resume work on the gear.
11. After the work is completed, Official in-charge of the work shall fill up second part of the block
copy and obtain thereon the SMs signature.
12. Official in-charge of the work shall also fill up and sign the Reconnection Notice, detach and hand
over to SM.
13. The signature of the Official in-charge of the work on the Reconnection Notice is the authority
for the SM to resume normal working.
1