Sunteți pe pagina 1din 9

Peru Engineering

Method of Procedure (MOP)


Date

Page

Ver.

Last
Update

[RELEVAMIENTO DE TORRE Y CIMENTACION


ESTACION 0100020_LM_AGATAS

Confidential

Peru Engineering
Method of Procedure (MOP)

[Jorge Hernandez]
Designed by

Date

Page

Ver.

Last
Update

[Mijael Espinoza]
Reviewed by
O&M

]
Approved by
Manager/VP

General Information
Proposed Date:

Proposed Time:

[20/FEB/2015 22/FEB/2015]
DPTO

SITE
0100020_LM_AGA
TAS

PRIORIDAD

LIMA

[Peru GMT-5 (08:00 hrs ~ 18:00 hrs)]


Activity Description:

LEVANTAMIENTO DE INFORMACION TORRE Y CIMENTACION

Activity Purpose:
Network Type

iDEN

Network Domains
Involved:

RAN (Radio Access Network)


CS Core

Involved NEs:
Confidential

2G

3G

DATACOM

SITE
0100020_LM_AGA

LTE

WiMax

Other

Transport/Transmission
ISP

DPTO
LIMA

VAS

Sites

PRIORIDAD

PS Core
Other:______________

Peru Engineering
Method of Procedure (MOP)
Date

Page

Ver.

Last
Update

TAS

Involved Services:

IDEN, GUL

Involved Markets and


Providers:

TELRAD PERU S.A. Y SUBCONTRATISTA (2M PERU S.A.C.- HOL PERU CONSULTORES
E.I.R.L.)

Nextel NOC
Monitoring

Sites & TX
VAS

Voice

Dispatch / ISP / HPPTT / CWAN

Data com

RPN (Risk Priority


Number)
Location for
execution:

SITE
0100020_LM_AGA
TAS

DPTO

PRIORIDAD

LIMA

Bridge (if needed):


Onsite Support Required:
Facilities:

Network Impact:

Yes

No:

Remote Support Required: Yes:

No:

Partners Support Required: Yes:

No:

Yes:

No:

Yes:

No:

Impact Duration:
Notification to
OSIPTEL:

Confidential

Date: dd/mmm/yyyy]

Places (if yes): [MSO2]

Contact Info: [Vendor/POC Name]

Peru Engineering
Method of Procedure (MOP)

Notification to
Providers:

Yes:

No:

Date

Page

Ver.

Last
Update

Date: dd/mmm/yyyy]

Impacted NEs:
Impacted Services:

No impactara.

Impacted Markets
and Providers:
Ticket or Case
reference (if any):
Comments and
remarks:
Relevamiento de torre y cimentacin:
MOP Scope
and Detailed
Description

1.- Relevamiento de Informacin a nivel de torre


2.-. Relevamiento de Informacin a nivel cimentacin
3.- Verificacin de Elementos

Pre-conditions
in the Network

General
Expected
Results
Confidential

Peru Engineering
Method of Procedure (MOP)
Date

Page

Ver.

Last
Update

Pre Works

Attach test matrix and necessary checklist:


1. Relevamiento de torre
2. Preparacin del personal para subir torre
3. Relevamiento de cimentacion
4. Descubrimiento de cimentacin ( no riesgo de torre)

MOP Activities
Description

Attach Hour by Hour Activity:

20/02/2015
08:00:00 a.m.

22/02/2015

20/02/2015

22/02/2015

08:05:00 a.m.

09:00:00 a.m. 09:20:00 a.m.


20/02/2015
22/02/2015
09:30:00 a.m. 06:00:00 p.m.
20/02/2015

22/02/2015

09:30:00 a.m
20/02/2015
09:30:00 a.m
20/02/2015
09:30:00 a.m

06:00:00 p.m.
22/02/2015
06:00:00 p.m.
22/02/2015
06:00:00 p.m.

20/02/2015

22/02/2015

06:00:00 p.m

06:05:00 p.m.

Tener en consideracin que la hora de inicio de trabajos depender de la accesibilidad,


distancia, inconvenientes de clima, entrega de llaves y otros que pudieran comprometer
las labores del da.

Confidential

Peru Engineering
Method of Procedure (MOP)

Command
Configuration

Date

Page

Ver.

Last
Update

Attach the scripts and commands sequence:


1. [Item1]
2. [Item2]

Validation

Attach test matrix and necessary validations:


1. [Item1]
2. [Item2]

Attach the GO / NO GO Criteria and escalation levels:


Go / No Go
Criteria

1. [Item1]
2. [Item2]

Attach the scripts and commands sequence:


Roll Back
Procedure

Confidential

1. [Item1]
2. [Item2]

Peru Engineering
Method of Procedure (MOP)

Roles &
Responsibilitie
s

Page

Ver.

Last
Update

The roles and responsibilities should be detailed below and some


additional information can be gathered including providers:

Contact name

Additional
Information:

Date

Contact Number /
Area / Responsability
UFMI

Jorge Hernandez

955249447

Joel Escobedo

955023266

COORDINADOR DE
PROYECTOS DE
INFRAESTRUCTURA
JEFE PROYECTOS DE
INFRAESTRUCTURA

E-mail
Jorge.hernandez@entel.pe
joel.escobedo@entel.pe

RESPONSABLE TELRAD John Vargas Juscamaita Cel. 984761288

El trabajo ser ejecutado por personal tcnico experimentado; se adjunta relacin de personal:

Confidential

Peru Engineering
Method of Procedure (MOP)

JOS JAIR
ANDRES
JAVIER
CRISENCIANO
MANFRED
JHON WISSLEY
ROMEL
NELSON
Confidential

CALDERN
CCORAHUA
CCORAHUA
DEXTRE
DIAZ
DIAZ
ESPAA

Date

Page

Ver.

Last
Update

DE LOS SANTOS
CAVIDES
NAVARRO
ESPRITU
ALAVARADO
ALVARADO
PARDO

45619590
70562804
71976568
48439917
48188667
44884301
48735040

Peru Engineering
Method of Procedure (MOP)

JAIME LUIS
RINA BRESCIA
RONALD RAFAEL
NOE
GUILER RUBEN
BEATO
ABEL HENRRY
ROLAND HERSON
HUMBERLINO
WILDER
NORA YSABEL

HERRERA
HERRERA
HILARIO
MARTIN
MERCEDES
MUOZ
MUOZ
MUOZ
OLIVERA
RAMIREZ

Confidential

DPTO
LIMA

Page

Ver.

Last
Update

CHIA
CHIA
SALCEDO
MATOS
MARIN
BARA
VALVERDE
VALVERDE

70269619
42274237
44828327
43169714
48386765
32482221
46562581
70879475

LUNA
ALVARADO

27296587
08467461

Permisos del 20.02.15 al 22.02.15


SITE
0100020_LM_AGA
TAS

Date

PRIORIDAD

S-ar putea să vă placă și