Viability Appraisal
Regarding the Proposed Development at Grove Farm, Stradbroke to include the Grove Farm
and Hall Farm Barns
Freeholders
Mr Peter Hilien, Mrs Jean Keeling and Mrs Sue Webster
File 400408
File 400408
series of drawings regarding the floor plan elevations to the market led housing, and both
the affordable a n d l o c a l n e e d s housing u n d e r drawing N o 300384 h o u s e t y p e s
Hillen/2N2B/314/5/617/8/9/10/11/12/13/14
3,029
32,561
1,710
18,382
320
3,440
390
4,203
480
5,600
160
1,720
Housing
3.6 S i t e Area
Unit Type
No of dwellings
Ha
Ac
0.0597
0.15
23
1.4904
3.68
Barn 1 (pink)
0.1283
0.32
15
0.300
0.74
12
0.281
0.69
Barn 2 (orange)
0.163
0.40
0.708
1.75
Total
54
3.077
7.73
4.0 A c c e s s Roads
4.1 T h e various adopted highway areas are indicated on the site layout plan (see Appendix 1) with
adequate visability splays recorded and all in the control of the applicants.
5.0 E c o l o g y
5.1 M i t i g a t i o n measures will be integrated in to the site design generally. Reports are submitted
with the planning application. W e are not aware of any significant cost implications under this
heading.
File 400408
Viability Analysis Regarding the Proposed Development at Grove Farm, Stradbroke
As at 20th December 2014
6.0 A r c h a e o l o g y
6.1 W e believe an archaeological dig will be required and a quote has been received from Suffolk
County Council in the sum of E9,480 plus VAT under this heading.
7.0 F l o o d Risk Assessment
7.1 T h e design will take into account surface water attenuation. There is a suitable outfall on the
eastern side of the site where the drainage swales are located. O n site surface drainage
network and attenuation facilities costs are estimated at E82,500.
8.0 U t i l i t i e s
Various reports have been secured and accompany the planning application.
8.1 F o u l Drainage
8 1 1 A public foul sewer adjoins the local needs housing on the eastern side and this will be utilised
for disposal of drainage from the Grove Farm site. Estimated foul drainage network costs at
E55,000.
8.1.2 T h e foul drainage from Barn 2 could either be led to a biological filtration unit or we understand
the mains adopted foul drainage system.
8.1.3 Drinking Water
The following costs have been estimated: Infrastructure Charge - E l 8,975
Connection Charges - E 2 3 , 8 1 5
Meter Charges E l
1,495
On-site Mains Services - E55,000
8.2 E l e c t r i c i t y
8 2 1 A new electricity supply including diversion of the overhead line is estimated to cost E110,000.
8.3 G a s
8.3.1 N o n e available.
8.4 Te l e c o m s
8.4.1 I t has been assumed there will be a net financial benefit by the introduction of the telecoms
This benefit is assessed at E7,700.
9.0 L a n d Contamination Report
9.1
Stage 1 report is presented with the planning application. There are no significant issues.
All existing buildings will be demolished with the exception of Barns 1 and 2.
File 400408
10 0 C o m m u n i t y Infrastructure Levy (CIL) and Section 106 Matters - E432,000 has been
allocated to these elements
10.1 D e t a i l e d discussions have been undertaken with the Hastoe Housing Association and an offer
in excess of E2.3 million is likely to be forthcoming for the purchase of the 27 affordable and
local needs houses.
11.0 Vi a b i l i t y Analysis
11.1 W e have undertaken an appraisal of comparable sales and are of the opinion that the market
value of the development (le the 54 dwellings) is in excess of E9,115,000.
11.2 W e have assumed that a developers return will be in the region of 18 to 20% on the capital
employed.
11.3 T h e landowner should receive a land value on sale in line with market expectations.
12.0 Conclusion
12.4 I n our opinion the development is economically viable as the developer will receive a suitable
return on their capital and the land owner a suitable return on the land sale.
11.5 T h e figures on which the analysis is based can be made available on a confidential basis. All
cost estimates are prepared within the time and cost restraints inevitably imposed at this stage
of the proposal.
13.0 Declaration
12.1 T h e owners have confirmed their intention to sell the site once planning permission has been
secured.
12.2 I t has been demonstrated with the information available at this time that the owners have the
ability to develop the land from an economic and practical viewpoint.