Documente Academic
Documente Profesional
Documente Cultură
TSCM42_2
Unit 4 Lesson 1
TSCM42_2
Unit 4 Lesson 1
TSCM42_2
Unit 4 Lesson 1
TSCM42_2
Unit 4 Lesson 1
TSCM42_2
Summary
You should now be able to:
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Lesson 2
TSCM42_2
Unit 4 Exercise 19
Component T-T7## (BIOS) is procured using Kanban. Check to see if the master data is
set up correctly for Kanban.
1. Check whether material T-T7## in plant 1200 at storage location PL03 is excluded
from MRP, so that its replenishment elements are not generated via MRP but via
Kanban.
2. Is this material excluded from MRP at storage location PL03?
TSCM42_2
Unit 4 Exercise 19
TSCM42_2
Unit 4 Exercise 19
TSCM42_2
Unit 4 Solution 19
Component T-T7## (BIOS) is procured using Kanban. Check to see if the master data is
set up correctly for Kanban.
1. Check whether material T-T7## in plant 1200 at storage location PL03 is excluded
from MRP, so that its replenishment elements are not generated via MRP but via
Kanban.
TSCM42_2
Unit 4 Solution 19
Continue.
Continue.
TSCM42_2
Unit 4 Solution 19
TSCM42_2
Unit 4 Solution 19
Continue.
6. How does the system display materials that are excluded from MRP at a storage
location in the stock/requirements list?
____________________________________________________
____________________________________________________
a) Materials that are excluded from MRP at a storage location are displayed in an
individual planning segment in the stock/requirements list.
7. Supply area T-P3## has been set up to stage materials at the production line.
Display the supply area T-P3## in plant 1200 by going to the control cycle.
To which storage location and person responsible is the supply area assigned?
TSCM42_2
Unit 4 Solution 19
Continue.
Details.
d) The supply area is assigned to storage location PL03 and the person
responsible is L3.
e) Select
Back twice.
TSCM42_2
Unit 4 Exercise 20
In plant 1200, component T-T7## (BIOS) in supply area T-P3## is to be staged directly at
the production line.
1. Review the control cycle to see which replenishment strategy is used to stage
material at the production line.
2. Since we are dealing with a control cycle for external procurement, the supply
source in this case is a vendor. Which supply source has been entered in the
control cycle for replenishment of component T-T7##?
TSCM42_2
Unit 4 Exercise 20
TSCM42_2
Unit 4 Solution 20
In plant 1200, component T-T7## (BIOS) in supply area T-P3## is to be staged directly at
the production line.
1. Review the control cycle to see which replenishment strategy is used to stage
material at the production line.
a) SAP ECC menu path:LogisticsProductionKANBANControl
CycleControl Cycle Maintenance (PKMC)
TSCM42_2
Unit 4 Solution 20
TSCM42_2
Unit 4 Exercise 21
1. Access the demand source view of the Kanban board for supply area T-P3## in
plant 1200.
2. How many containers are there in the SAP ECC system for replenishment of
material T-T7##?
____________________________________________________
TSCM42_2
Unit 4 Exercise 21
TSCM42_2
Unit 4 Exercise 21
TSCM42_2
Unit 4 Solution 21
1. Access the demand source view of the Kanban board for supply area T-P3## in
plant 1200.
a) SAP ECC menu path: LogisticsProductionKANBANControlKANBAN
BoardDemand Source View (PK13N)
TSCM42_2
Unit 4 Solution 21
Continue.
2. How many containers are there in the SAP ECC system for replenishment of
material T-T7##?
____________________________________________________
a) Five containers are available for replenishment of material T-T7##.
3. Let us assume that you, as the demand source, have just taken the last component
out of a Kanban container. From the Kanban board, select one of the Kanban bins
for material T-T7## and set it to empty.
a) Select one of the purple containers and select To Empty (Set Kanban Status
to Empty).
Wait until you see the status change (color change of the container).
TSCM42_2
Unit 4 Solution 21
TSCM42_2
Unit 4 Solution 21
TSCM42_2
Summary
You should now be able to:
TSCM42_2
Open Question
Unit 4
TSCM42_2
Open Question
Unit 4
.
The following objectives can be achieved in many cases by controlling the production
process in production itself and by reducing the manual posting effort required:
shortening the lead times and reducing the stock
TSCM42_2
Open Question
Unit 4
TSCM42_2
Open Question
Unit 4
.
In the Kanban procedure, replenishment is initiated when the demand source sets the
container in the system to empty.
TSCM42_2
Name the basic master data of Kanban.
Open Question
Unit 4
TSCM42_2
Name the basic master data of Kanban.
.
Supply areas, Control cycles
Open Question
Unit 4
TSCM42_2
Open Question
Unit 4
TSCM42_2
Open Question
Unit 4
.
In Kanban, goods issues are typically backflushed when an order is confirmed (or when a
goods issue is posted manually for an order). Emptying a Kanban does not result in a
goods issue posting.
TSCM42_2
Open Question
Unit 4
TSCM42_2
Open Question
Unit 4
.
If the demand source sets the status to Full, the system automatically posts the goods
receipt for the material with reference to the procurement element.