Sunteți pe pagina 1din 5

SCENARIO

EMERGENCY RESPONSE SIMULATION


PT.PERTAMINA PERSERO
Operation Unit
Occurrence

:
:

Marketing & Trading Facilities


Fire on Premium Tank within Maintenance Activity

Date :
Time:

I. The Event Scenario


Premium Tank TK 117 typed Cone Roof 12.000 KL is on repairing condition for the leakage shell plate thus it is needed to
be repaired by Technical Maintenance using the Contractors worker. The activity shall comply with the Safe work permit
procedure of Pertamina for the work of Confined Space Entry with the first phase is Tank Cleaning and gas Freeing.
The activity within the tank cleaning phase towards the premium residual by using diesel pump placed on 3 m distance in
front of tank manhole by publishing the Safe Work Permit (Cold Work Permit).
Just a few minutes conduct pumping suddenly fire occurred surrounding the manhole of Tank and causes 1 person of
contractor gets burns due to exposed by heat radiation.
The fire caused by flame from the pump which is not using flame arrester and exposes premium vapor emerging from the
tank man hole.
Maintenance officer reports to fire station in Fuel Filling Depot.
HSE Shift Supervisor at Fire Station reports the event to the On Scene Commander and forwarded to Incident
Commander and Emergency Response Commander as well.
HSE Manager as Incident Commander commanding On Scene Commander to dispatch Fire Brigade and Rescue Team
completed with Fire Crash Tender and rescue team and ambulance as well to the scene.
Incident Commander by the approval from Emergency Response Commander declares the condition as emergency that
shall be activated as stated within emergency procedure by commanding sounds the emergency siren to fire station.

II. Response Scenario


Emergency Communication

No.

Emergency Situation and Condition

Executor/PIC

The incipient event reported to fire station by Technique Maintenance officer using
Handy Talky

Maintenance Technique
Officer (Notifier)

HSE Supervisor at Fire Station reports to On Scene Commander forwarded right away
to Incident Commander .
Incident Commander declares the situation as emergency after getting the approval
from Emergency Response Commander.

HSE Supervisor at Fire Station;


1. Sounded the emergency siren
2. Dispatch Fire Brigade and Rescue Team completed with Fire Crash Tender to
the scene.
3. Ask for Medical Team and Ambulance straight to TK 117.

HSE Supervisor
On Scene Commander
Incident Commander
Emergency Response
Commander.
HSE Supervisor
Fire Brigade
Medical Team
Rescue Team

2) Security and Evacuation Operation


No.

Emergency Situation and Condition

Strengthen the control at the Main gate of BBM Depot towards the enter/exit vehicles by
prioritizing the vehicles and officers related with the emergency response and prohibit
the unauthorized enter to the BBM Depot.

Executor/PIC
Security Team

4)

Security Officer controls the traffic particularly for the fire truck and ambulance to the
scene (Tank TK 117).

Security Team

Rescue Team evacuates the workers at the scene to the safe location where U.S Fire
Fighting Practices determine the safe distance is 4 times of Fire height.
Thus, if the fire height is 6 m then the safe baseline can be appointed minimum on 24 m
from the Fired Tank TK 117

Rescue Team

Security action continually conducted until the condition is declared safe by Incident
Commander.

Security Team

3) Rescuing the Accident Victims

No.

Emergency Situation and Condition

After receiving information that there is accident victim, Rescue Team and Medical Team
along with ambulance straight to the scene (Tank TK 117).
The victim lays down at the bund wall of tank when arrives at the scene and Rescue
Team evacuate the victim to the safe area proceeds giving first aid by Medical Team.
The victim immediately taken away to local Pertamina Hospital to get further medical
treatment.

Executor/PIC
Rescue Team
Medical Team
Medical Team

Emergency Response Operation

No.
1.

Emergency Situation and Condition


Fire on manhole of tank TK 117 caused by existence of vapor from the premium out
of the manhole and blended with the air outside reaching the explosion range
(explosion range 1.4% - 7.6%) and climbs up exposes the unsafe diesel pump
exhaust therefore emerges sparking and finally fire.

Executor/PIC

2.

After receiving the fire report of Tank TK 117 then On Scene Commander commands
the Fire Station Officers to dispatch Fire Brigade complete with Fire Crash Tender to
the scene.
On Scene Commander seizes that burning substance is the gas out of the manhole
with the big fire depicts that premium oil in the tank is still copious and gas is within
too rich position (Upper Explosion range-UEL).

On Scene Commander
Fire Brigade

4.

Firefighting conducted using 3 units of Water Spray Nozzles sized 2,5 from Fire
Water Crash Tender heading to the manhole.

On Scene Commander
Fire Brigade

5.

The fire can be extinguished rapidly followed by cooling the manhole and shell plate
of the Tank to prevent flash back.

Fire Brigade

3.

On Scene Commander

5) Supporting operation

No.
1.
2.

Emergency Situation and Condition


Providing the logistics for the emergency response team at the scene.
Documenting the emergency response process since the dispatching Crash Tender,
controlling the traffic at the scene, rescuing the victims until the fire fighting process.

Executor/PIC
Logistic Team
Media Relation Team

3.

Serving the Interview with the Government Authority and Press.

Media Relation Team

Documenting critical events during the emergency response.

III. Response Operation Accomplish

No.
1.
2.

Emergency Situation and Condition


Emergency Response accomplished and On Scene Commander reports the status
of emergency response to the Incident Commander.
Emergency Response Accomplished and Incident Commander by the approval from
Emergency Response Commander declares that emergency can be controlled and
condition is safe.

Executor/PIC
On Scene Commander
Incident Commander
Incident Commander.