Sunteți pe pagina 1din 5

RND

1.
2.
3.
4.
5.

checked PCB Board and adjust preset setting in TS-600 VA.


Re-check TS-600 VA and adjust preset setting.
Repair and recover TS-600 VA have rejected.
Check all TS-600 VA board.
Checking of goods battery charger 12 V and 24 A by using the battery and

multimeter.
6. Open the transformer to identify the minimum and maximum heat needed
7. Measuring the temperature of Automatic Battery Charger Charger Current
200mp.
8. Check also Input Loading Current (CA) , Secondary AC Loading Current, DC
output voltage (V) and DC output Loading Current (CA).
9. The company is still receiving complaints heat in the battery. Modified the battery
and add the 50K resistor and persist. Re-measuring the temperature of the input
and output.
10. Charging the battery that was charged again. Each hour check and record the
temperature. Check again the battery either determines the proper temperature.
11. Heat cannot be reduced. Modify the voltage regulator in the input and output
voltage. Check the input and output voltage.
12. Modified the battery charger and add a small fan 24V to reduce heat. I checked
again heat the battery charger and supervisor also check again the heat.
13. Check battery overheating rejected. Examine and measure the temperature of the
input and output voltage. Supervisor re-check heat the battery.
14. Automatic battery charger add resistor 0.22ohm. Checking and adding
components in the battery.
15. Model TPP-1206-A inspecting components that have been installed either right or
wrong.
16. I point to the supervisor to improve the model.
17. I also install casing and also transformer and check again the temperature,
voltage, input and output.
18. I make computer maintenance. Install software AutoCAD 2007 to facilitate the
work of staff.
19. I tide casing in TBP board and adjusting, and re-architecting and measure TBP
Casing.
20. The new IC examine whether damaged or not.
21. Step down transformer mounted PCP. I checked back the transformer.
22. I installed STEP DOWN PCP and examine it.
23. I tested STEP DOWN PCP and reinstall.
24. Automatic Battery Charger PCB resistor which is perforated adjusts the ohm.
25. Decade Resistance Model uses to customize ohm setting in the PCB.

26. The Eleken filter plug inspects and test the old transformer input voltage and
output voltage, temperature and long transformer.
27. Checked by: Programmable Electronic Load, Multimeter.
28. The Eleken filter plug inspects and test the new transformer input voltage and
output voltage, temperature and new transformer.
29. Checked by: Programmable Electronic Load, Multimeter.
30. I re-examine the STEPDOWN Transformer which was completed tide. I check the
components that have been rejected.
31. Check by HI-POT. Cause rejected is which had broken MOUSE PAL and IC.
32. I re-examine and change the component.
33. I tested the PCP that has damaged. I replace the new PCB and reassemble
components.
34. I make computer maintenance. Install software Windows XP to facilitate the work
of staff.
35. STEP DOWN Transformer identify who was rejected.
36. I fix the transformer of 100 units.
37. I tested before being appointed as supervisor.
38. Then, supervisor also checked and re-tests the transformer.
39. STEP DOWN Transformer identify who was rejected.
40. I fix the transformer of 100 units.
41. I tested before being appointed as supervisor.
42. Then, supervisor also checked and re-tests the transformer.
43. I use a programmable load electronic 2.5 amplifier in the drawing to the testing
model TBP- 1203-A.
44. I made the preset setting in the model of 250 units. I tested the model testing.
45. Supervisor test and inspect the model.
46. I use a programmable load electronic 2.5 amplifier in the drawing to the testing
model TBP- 1203-B.
47. I made the preset setting in the model of 250 units. I tested the model testing.
48. Supervisor test and inspect the model.

49. Find TBP 1203 products which were rejected. I identified the cause of rejected
product.
50. I examine and improve the product. I check the TS-2000V using PCB test jig and
set presetting.
51. Re-check and modify the product.

QC
52. Updates file IQC and key in data.
53. Updates IQC files.
54. I tide Eleken Filter Plug. Check the filter by AC Loader and refrigerator.
55. I and supervisor discuss about the damage of Elken filter plug.
56. Re-check Elken Filter Plug by AC Loader and refrigerator.
57. Learn about the components used in the filter plug.
58. This company will be held auditing by SIRIM on 14/04/2014.I clean the working
area and also arrange the things.
59. I make calibration sticker on the multimeter, HI-POT program, and Programmable
Electric load.

60. I also wrote the expiry date and signed in calibration sticker and paste on the
program.
61. SIRIM auditing officers make audit at this company.
62. I was appointed at the request of the company management as QC- (Quality
Control)
63. SIRIM officers and supervisors interviewed me about how to check the quality of
the products produced by this company.
64. I make calibration sticker on the multimeter.
65. I also wrote the expiry date and signed in calibration sticker and paste on the
program.
66. Update IQC data. Snap pictures and upload in computer.

1.
2.
3.
4.
5.
6.

STORE DEPARMENT
Identifying the components rejected in store.
Isolate components that have good and damaged.
Check the cause of rejected components and discuss with supervisor.
Identifying the components rejected in store.
Isolate components that have good and damaged.
Check the cause of rejected components and discuss with supervisor.

7. Measuring resistor Ohm.


8. Classify resistors good and damaged.
9. Fix the resistors which are damaged.
10. Measure Ohm Resistor.

1. Measuring resistor Ohm.


2. Classify resistors good and damaged.
3. Fix the resistors which are damaged.
4. Measure Ohm Resistor.

5. Measure and inspect components capacitor. Classify components capacitor good


pace and damaged
6. Capacitor fix that has been damaged. Re-test capacitor.
7. Measure and inspect components diode. Classify components capacitor good pace
and damaged
8. Diode fix that has been damaged. Re-test diode.

PCB DEPARTMENT
1. PCB printed inspecting and testing
2. Identify the damaged engine
3. Therefore, I use acid to extract copper because the machine was broken.
4. After I fix it so that the machine can be used as usual

S-ar putea să vă placă și