PREFACE
Dear Customer
Jinlong Europe, a revolutionary evolution!
Reliability, quality, safety, and high technology are the success of Yongmaos tower
cranes all over the world.
In Europe all our cranes are CE approved. This is the result of a constant
technological research.
Cranes with a proven concept, lighter structures can use smaller, mobile cranes
during mounting and dismounting.
Because of our relentless efforts to improve our products, technical updates are from
time to time necessary. Therefore, the technical data in this manual are subject to
change without warning.
Jinlong tower cranes, a revolutionary evolution.
Jinlong Europe
Zandvoorstraat 10/6
2800 Mechelen Belgium
Tel: ++ 32/15 28 54 54 Fax: ++32/15 20 96 80
-6-
RCV1.4.ENG
TABLE OF CONTENTS
CHAPTER 1. TECHNICAL DATA ........................................................................................9
1.1. SPECIFICATIONS................................................................................................................................................... 10
1.2. PREPARING THE CONSTRUCTION SITE ...................................................................................................... 14
1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY................................................................................................... 14
1.2.1.1. INTRODUCTION........................................................................................................................................ 14
1.2.2. DIMENSIONS ..................................................................................................................................................... 15
1.3. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS ...................................................................... 19
1.3.1. PREPARATION ................................................................................................................................................... 19
1.3.1.1. INSTALLATING THE CRANE FOUNDATION: ..................................................................................... 20
1.3.2. REACTION FORCES.......................................................................................................................................... 21
1.3.3. SOIL PRESSURE AND CHOICE OF CONCRETE BLOCKS ON FIXING ANGLES................................... 22
1.3.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS............................................................... 23
1.3.5. INSTALLING THE FOUNDATON ANCHORS................................................................................................ 24
1.3.6. SYMBOLS (EXAMPLE) .................................................................................................................................... 26
1.4. CENTRAL BALLAST ............................................................................................................................................. 31
1.4.1. INTRODUCTION................................................................................................................................................ 31
1.4.2. GROUND BALLAST TABLE ............................................................................................................................ 32
1.4.3. BALLAST BLOCK DETAILS............................................................................................................................ 33
1.5. COUNTER JIB BALLAST ..................................................................................................................................... 35
1.5.1. INTRODUCTION................................................................................................................................................ 35
1.5.2. COUNTER JIB BALLAST DIMENSIONS ....................................................................................................... 36
-7-
RCV.1.4.ENG
-8-
RCV.1.4.ENG
-9-
RCV.1.4.ENG
1.1. SPECIFICATIONS
21. 27m
71. 9m
8. 43m
70m
3. 2m
65m
12t
60m
55m
50m
45m
40m
3. 0t
3. 8t
4. 3t
4. 8t
5. 6t
6. 0t
6. 0t
6m
Fig.1-1-1
- 10 -
RCVC.1.4.ENG
Table 1-1-1
R
Fall
70
65
60
55
50
45
40
IV
II
IV
II
IV
II
IV
II
IV
II
IV
II
IV
II
R(max)
m
3.2-21.07
4.1-40.30
3.2-23.35
4.1-44.83
3.2-23.76
4.1-45.64
3.2-23.80
4.1-45.72
3.2-24.53
4.1-47.19
3.2-24.87
4.1-45.00
3.2-25.20
4.1-40.00
C(max)
t
12.0
6.0
12.0
6.0
12.0
6.0
12.0
6.0
12.0
6.0
12.0
6.0
12.0
6.0
25
30
35
40
45
50
55
60
65
70
9.7
6.0
11.0
6.0
11.2
6.0
11.3
6.0
11.7
6.0
11.9
6.0
12.
6.0
7.7
6.0
8.8
6.0
9.0
6.0
9.0
6.0
9.4
6.0
9.5
6.0
9.7
6.0
6.6
6.0
7.2
6.0
7.4
6.0
7.4
6.0
7.7
6.0
7.8
6.0
8.0
6.0
5.25
6.0
6.1
6.0
6.2
6.0
6.2
6.0
6.5
6.0
6.6
6.0
6.8
6.0
4.4
5.2
5.2
5.9
5.3
6.0
5.3
6.0
5.5
6.0
5.7
6.0
3.8
4.6
4.5
5.2
4.6
5.3
4.6
5.3
4.8
5.6
3.3
4.1
3.9
4.6
4.0
4.7
4.0
4.8
2.8
3.6
3.4
4.2
3.5
4.36
2.5
3.3
3.0
3.8
2.25
3.0
- 11 -
RCVC.1.4.ENG
PA
VA
Fixing anchors
Untercarriage
Anchored
H( m)
14 56. 6
13 53. 6
12 50. 6
11 47. 6
10 44. 6
9 41. 6
147m
29
sections
2 20. 6
1 17. 6
20
sections
66m
7. 5m
12. 6m
21. 7
18. 7
3m
24. 7
38
sections
186. 5m
27. 7
2 15. 7
1 12. 7
F2
8 38. 5
7 35. 6
6 32. 6
2x2m 5 29. 6
4 26. 6
3 23. 6
30. 7
0. 15m
7. 65m 3m
7
6
2x2m 5
4
3
40
sections
11
sections
39m
13 48. 7
12 45. 7
11 42. 7
10 39. 7
9 36. 7
8 33. 7
93m
14 51. 7
120m
H( m)
6mx6m F1
F3
Fig.1-1-2
Table 1-1-2
F2 144t
124t
F3
78t
99t
82t
service
: InIn
Service
F1
91t
3x380V
380V 5%
50HZ
95t
93t
Needed
Necessary
electrical
force
electric
power
OutofofService
service
: Out
kVA
105KVA
: Crane
weight
without
loadload
and ballast
Crane
weight
without
or ballast with longest
with longest jib and max.height
- 12 -
RCVC.1.4.ENG
Description
Table 1-1-3
HOISTINGMECHANISM (55RCS30):
Name
Model
Motor
YRTE2-180M24B5
Reduction
R27.389.47
Speed (m/min)
Cable
35W x (7) 18
Capacity
(kW)
Drum capacity
533 (m)
40.5
Real capacity
400 (m)
37914 Nm
Load (kg)
Cable
35W x (7) 14
Capacity
(kW)
Max. capacity
533 (m)
51.5
Real capacity
400 (m)
37914 Nm
Cable
6 x (19) 7.7
Capacity
Load (kg)
II
0 68
0 34
3000
6000
IV
0 34
0 - 17
6000
12000
HOISTINGMECHANISM (70RCS30):
Name
Type
Motor
YRTE2-180M24B5
Reduction
R27.389.47
Speed (m/min)
II
0 80
0 40
3000
6000
IV
0 40
0 - 20
6000
12000
LOOPKAT (DTC120)
Naam
Motor
Reduction
Model
YTLEJ112-1204H
Speed
(m/min)
0 57
BF12-31
Load (kg)
0 12000
0 6000
Length
70 m
Front
138 m
Rear
86 m
120 Nm
1150 Nm
Model
Motor
YTLEJ112L-145F1
YTLEJ112L-145F2
Reduction
Speed
(o.p.m.)
Capacity
2x145 Nm
0 0.8
J4238908
9111.7 Nm
- 13 -
RCVC.1.4.ENG
1.2.1.1. INTRODUCTION
This brochure provides the dimensions of the space requirements for the crane. It
consists of two sections:
- The entire crane with indication of the most important dimensions.
- The crane is shown in three parts:
Foundation anchors and undercarriage
Mast composition
Range and jib length
Based on the provided dimensions, you can prepare the assembly of the crane.
- 14 -
RCVC.1.4.ENG
1.2.2. DIMENSIONS
1.2.2.1. OVERALL CRANE DIMENSIONS
71. 9m
3. 6m
51. 7m
5. 65m
0. 15m
2mx2m
7. 5m 3m
8,43 m
84. 3m
21. 27m
Fig. 1-2-1
- 15 -
RCVC.1.4.ENG
150
2m
2m
Reinforced concrete
6000
7248
3190
3690
6000
3690
3190
7160
C3/ 2
291
4340
Fig. 1-2-2
Fig. 1-2-3
- 16 -
RCVC.1.4.ENG
1.2.2.1.2. Mast
NxC1
D1
E1
ST70/ 30
A1
2. 000m
B1
7. 500m
C1
3. 000m
D1
7. 260m
E1
2. 600m
F1
4. 050m
G1
4. 300m
H1
1. 180m
K1
1. 120m
K1
H1
B1
RP
C1
Table 1-2-1
MAST DIMENSIONS
F1
A1
G1
Fig. 1-2-4
- 17 -
RCVC.1.4.ENG
L2
E2
H2
B2
M2
A2
F2
D
P2
R2
K2
G2
21. 2
m
71. 7
66. 7
61. 7
56. 7
5
4 1. 7
41. 7 6. 7
Fig.1-2-5
Table 1-2-2
RP
A2
D2
E2
F2
G2
R2
H2
P2
K2
L2
B2
M2
PA VA
2.10m
14.00m
5.47m
2.70m
1.30m
4.00m
3.10m
1.40m
3.10m
3.50m
2.50m
2.50m
Table 1-2-3
- 18 -
JIB
70m
65m
60m
55m
50m
45m
40m
71.7m
66.7m
61.7m
56.7m
51.7m
46.7m
41.7m
21.2m
21.2m
21.2m
21.2m
21.2m
21.2m
21.2m
53.76m
53.76m
48.76m
48.76m
48.76m
43.76m
38.76m
18.75m
18.75m
18.75m
18.75m
18.75m
18.75m
18.75m
RCVC.1.4.ENG
Jinlong Europe Zandvoorstraat 10/6 2800 Mechelen Belgium Tel.:++32/15 28 54 54 Fax: ++32/15 20 96 80.
and
Jinlong Europe UK & Ireland 2nd Floor, Titan Court, 3 Bishop Square Hatfield - AL10 9NA Hertfordshire - U.K.
Tel: ++ 44/1707 226 522 Fax: ++44/1707 226 001
- 19 -
RCVC.1.4.ENG
- 20 -
RCVC.1.4.ENG
Mast composition
Hook height m
Total weight
Maximum weight
Horizontal force
Reaction
Traction
Pressure
In service
Out of service
Table 1-3-1
ES in service
C
ET
kg
kg/m
1+1+1
12.7
77054
1+2+1
15.7
1+3+1
HS out of service
R
Tract
Comp
kg
kg
kg
160967
2243
42304
78396
78544
166713
2411
44016
18.7
80034
172964
2579
1+4+1
21.7
81524
179718
1+5+1
24.7
83014
1+6+1
27.7
1+7+1
ET
kg
kg/m
R
Tract
Comp
kg
kg
kg
65054 184984
5587
52354
86355
80993
66544 184984
6125
51912
86798
45917
83779
68034 184984
7548
51469
87240
2747
48007
86754
69524 184984
8085
51027
87683
186976
2915
50285
89918
71014 184984
8623
50584
88125
84504
194739
3083
52753
93271
72504 184984
9362
50142
88568
30.7
85994
203005
3251
55787
97189
73994 184984
10102
49699
89010
1+8+1
33.7
87484
211776
3419
59587
101875
75484 184984
10841
49257
89453
1+9+1
26.7
88974
221051
3587
63510
106682
76974 184984
11580
48814
89895
1+10+1
39.7
90464
230829
3755
67553
116611
78464 184984
12320
48372
90338
1+11+1
42.7
91954
241112
3923
71718
116661
79954 184984
13059
47929
90780
1+12+1
45.7
93444
251899
4091
76005
121832
81444 197478
13798
52171
95901
1+13+1
48.7
94934
263190
4259
80413
127125
92934 240592
14538
67893
112514
1+14+1
51.7
96424
274985
4427
84942
132540
84424 285925
15277
84447
129953
- 21 -
RCVC.1.4.ENG
Mast composition
Hook height in m
PS
Table 1-3-2
Mast 2m x 2m
C
M101N
M142N
M126N
M169N
PS
PS
PS
PS
1+0+1
9.7
1.49
1.37
1.14
1.15
1+1+1
12.7
1.49
1.37
1.15
1.16
1+2+1
15.7
1.49
1.38
1.15
1.16
1+3+1
18.7
1.49
1.38
1.15
1.16
1+4+1
21.7
1.50
1.40
1.16
1.18
1+5+1
24.7
1.55
1.43
1.19
1.20
1+6+1
27.7
1.60
1.47
1.23
1.23
1+7+1
30.7
1.66
1.52
1.27
1.26
1+8+1
33.7
1.73
1.57
1.31
1.30
1+9+1
36.7
1.80
1.62
1.35
1.33
1+10+1
39.7
1.88
1.67
1.40
1.37
1+11+1
42.7
1.96
1.73
1.45
1.41
1+12+1
45.7
2.06
1.79
1.50
1.45
1+13+1
48.7
2.16
1.86
1.55
1.50
1+14+1
51.7
2.56
2.13
1.76
1.65
- 22 -
RCVC.1.4.ENG
2000
600
The distance between the topside of the mounting plate and the topside of the
foundation block must be 150 mm.
150
2000
Fig. 1-3-1
- 23 -
RCVC.1.4.ENG
1/ Check the framework for any deformation during transport. The difference
between respectively the diagonals and the bearing surface heights may be at
the most 1 mm.
2/ Install the foundation anchor on the reinforcement and adjust by means of
filling plates.
3/ Check perpendicularity in both directions after assembly of the lower mast
- 24 -
RCVC.1.4.ENG
Plumb Line
Standard
section
Plumb line
150
4 foundation anchors
Reinforced concrete
Fig. 1-3-2
- 25 -
RCVC.1.4.ENG
The upper and lower reinforcements are interconnected with loop connections.
Each layer is connceted with cruciform reinforcements.
Uper reinforcement:
33:
Number of rails
Support diameter in mm
Distance in cm
Lower reinforcement:
ep:
Round rod
D:
Density
V:
Volume in m3
L:
Length
l:
Width
H:
Height in cm
- 26 -
RCVC.1.4.ENG
20
555 ( e=17)
3 11x11HA16x155 ( e=51)
1 33HA25x625 555 ( e=17)
130
20
135
70
2 33HA25x625
1 33HA25x625
( e=17)
555 ( e=17)
560
280
2 33HA25x625
555
560
M101N
L=560cm; I=560cm; H=135cm; V=42m3
Fig. 1-3-3 (a)
- 27 -
RCVC.1.4.ENG
70
135
130
20
20
610
2 52HA25x680
( e=12)
20
20
3 14x14=196HA16 ( e=48)
610
1 52HA25x680
( e=12)
625
20
20
1 52HA25x690 620 ( e=12)
20
20
2 52HA25x690 620 ( e=12)
D: 2. 4
625
M126N
L=625cm; I=625cm; H=135cm; V=53m3
Fig. 1-3-3 (b)
- 28 -
RCVC.1.4.ENG
2 38HA25x645
20
20
585 ( e=15. 5)
3 12x12=144HA16x190 ( e=46. 5)
170
70
20
20
585
1 38HA25x645
( e=15. 5)
130
1 38HA25x655
20
620 ( e=15. 5)
20
620 ( e=15. 5)
590
2 38HA25x655
20
20
D: 2. 4
590
M142N
L=590cm; I=590cm; H=170cm; V=59m3
Fig. 1-3-3 (c)
- 29 -
RCVC.1.4.ENG
20
20
2 55HA20x700 640 ( e=11. 8)
3 13x13=169HA20x190 ( e=47)
20
640 ( e=11. 8)
170
70
1 55HA20x700
20
165
645
20
20
640
1 55HA25x710
( e=12)
20
20
2 55HA25x710 640 ( e=12)
645
D: 2. 4
D2.4
M169N
L=645cm; I=645cm; H=170cm; V=71m3
Fig. 1-3-3 (d)
- 30 -
RCVC.1.4.ENG
- 31 -
RCVC.1.4.ENG
Mast composition
HC
Hook height
NR
Number of layers
ND
Number of blocks
LE
LD
Obtained Ballast
R. ES
Forces in service
R. HS
RH
Horizontal forces
Table 1-4-1
2mx2m
D
C D
D C
R
A
RH
Fig. 1-4-1
CP
HC
NR
ND
LE
LD
RES
RHS
RH
2+0+1
14.6m
12C+12D
60t
63.6t
2+1+1
17.6m
12C+12D
60t
63.6t
61t
55t
7.06t
2+2+1
20.6m
12C+12D
60t
63.6t
62t
56t
7.12t
2+3+1
23.6m
12C+12D
60t
63.6t
63t
56t
7.18t
2+4+1
26.6m
12C+12D
60t
63.6t
65t
57t
7.24t
2+5+1
29.6m
12C+12D
60t
63.6t
66t
57t
7.30t
2+6+1
32.6m
12C+12D
60t
63.6t
67t
57t
7.36t
2+7+1
35.6m
12C+12D
60t
63.6t
69t
58t
7.42t
2+8+1
38.6m
12C+12D
60t
63.6t
71t
58t
7.48t
2+9+1
41.6m
12C+12D
60t
63.6t
73t
58t
7.54t
2+10+1
44.6m
12C+12D
60t
63.6t
76t
62t
7.60t
2+11+1
47.6m
12C+12D
60t
63.6t
78t
67t
7.66t
2+12+1
50.6m
12C+12D
60t
63.6t
80t
72t
7.73t
2+13+1
53.6m
12C+12D
60t
63.6t
81t
77t
7.79t
2+14+1
56.6m
12C+12D
60t
63.6t
84t
82t
7.85t
- 32 -
RCVC.1.4.ENG
540
420
250
900
150
1500
750
250
450
750
100
500
mm
40
10
900
7200
10
2200
8800
10
1600
4800
REP
R30
R20
R10
L.u
L.t
500
1000
220
( )
115
R3
0
220
Reinforced concrete
Form
P: 2800kg D: 2.3
Fig. 1-4-2
- 33 -
RCVC.1.4.ENG
M
E241(A3)
500
500
540
420
250
900
150
750
1500
3
250
450
750
100
500
Serial no.
Diameter
N:
Quantity
L. u:
Length unit
L. t:
Total length
Form:
Form
M:
REP
1
R10
R20
220
R3
0
R30
115
220
( )
Material
N L.u
mm
40
2 500
L.t
10
900
7200
10
2200
8800
10
1600
4800
P: 2500kg D: 2.3
Fig. 1-4-3
- 34 -
1000
Reinforced concrete
Form
RCVC.1.4.ENG
E241(A3)
Rep:
We recommend weighing the concrete blocks and marking their weight with
paint on a visible side of the concrete block.
- 35 -
RCVC.1.4.ENG
50
21.2
21.2
21.2
Blocks
3B+
1C
(t)Weight
11.1
Weight
Tolerance
4150 kg
+50 kg
3100 kg
+50 kg
1800 kg
+50 kg
21.2
3D+
1D+ 3D+
1B+
3B
2C
1C
13.45 16.05 17.35
D
B
C
65
70
21.2
21.2
21.2
3D+
2B
2D+
4B
3D+
3B
30
100
60
1505 5
790
55
2.2
2.3
2.4
2.5
3210
3080
2950
2810
2400
2300
2200
2100
1380
1320
1270
1220
X 2
45
180
40
70
100
1160 1
345
1700 1
Fig. 1-5-1
- 36 -
RCVC.1.4.ENG
1700
Goed
145+50
Slecht
Wrong
77
90
20
180
20
Right
220
520
1505 5
3
1
3
345
3
2- 52
120
25 x 45
20
20
260
635
90
790
65 - 2
65 - 2
Round
steel
Rond staal
120
415
2- 50
Fig. 1-5-2
- 37 -
RCVC.1.4.ENG
180
210
C=900 D=B=1290
180x13
( A) , ( B) , ( C) X 2
180
500
500
1700 1
500
345
1548
5
R2
16
R1
8
400
0
R4
270
230
0
R4
246
Fig. 1-5-3
- 38 -
RCVC.1.4.ENG
- 39 -
RCVC.1.4.ENG
- 40 -
RCVC.1.4.ENG
1.
Limiter
2.
Hoisting drum
3.
Transmission
4.
5.
6.
Electrical controlpanel L
7.
Resistor cabinet
- 41 -
RCVC.1.4.ENG
- 42 -
RCVC.1.4.ENG
T C
Torque
Current brake
Voltage regulator
Slewing mechanism
3.1.1. DESCRIPTION:
Select the slewing speed according to the required displacement. Increase
or decrease slewing speed gradually. Slow down gradually instead of
stopping abruptly by means of the slew brake.
The slewing brake may only be used to position the jib when hoisting at
wind speeds < 13 m/s.
To prevent damage to the hoist rope, avoid simultaneous slewing and
hoisting (rope twisting risk)
- 43 -
RCVC.1.4.ENG
direction;
2/ An electrodynamic coupling/brake producing the speed changes;
3/ A reduction in which the clutch engages directly on the slewing
ring;
4/ Safety brakes mounted on the electrodynamic coupling/brake;
5/ Tacho-dynamo, for speed control;
6/ Slewing limiter;
7/ The crane can be put in weathervaning both manually and
electrically.
- 44 -
RCVC.1.4.ENG
3.2.2. OPERATION
1/ Make the motor run in the desired direction.
2/ The brake releases.
3/ The electrodynamic brake inductor is supplied with direct current.
4/ An amperage change in the inductor produces a speed change. In
- 45 -
RCVC.1.4.ENG
1.
2.
3.
4.
5.
:Motor
:Gearbox
:Weathervaing mechanism
:Slewing ring
:Limit switch
Fig. 5-2-1
- 46 -
RCVC.1.4.ENG
3.3. MALFUNCTIONS
1/ The slewing mechanism is provided with an electronic control
device that:
- Controls slewing acceleration and deceleration;
- Prevents changing of the slewing direction by a control error;
2/ If a malfunction occurs, working with the crane must be stopped
Normal
Abnormal
Shunt bridging.
Free slewing.
- 47 -
RCVC.1.4.ENG
improper tightening;
5/ Check if the control box still works within the given
parameters.
- 48 -
RCVC.1.4.ENG
- 49 -
RCVC.1.4.ENG
1
2
Fig. 5-4-1
Fig. 5-4-1
- 50 -
RCVC.1.4.ENG
- 51 -
RCVC.1.4.ENG
4.1. SYMBOLS
D T C
Torque
Turbo timing
Voltage timing
Trolley mechanism
52-
RCVC.1.4.ENG
Rope drum
Gearbox
Electromagnetic brake
Disk brake
PV1:
PV2:
High speed; the motor is run at its rated voltage (380 V) without excitation of
the electromagnetic brake.
The disk brake of the trolley winch unit is of the regular closed type (i.e. release
through voltage control).
Normal brake clearance is 0.8 1.2 mm.
The brake clearance is set in an identical way as for the slewing motor.
The brake torque is set by a spring screw. Fig. 6-2-1 item 14.
- 53 -
RCVC.1.4.ENG
10
11
23
22
21
20
19
18
17
16 15 14 13
Fig. 6-2-1
1.
2.
Connecting rod
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
Fixing nut
13.
14.
15
16.
Protection
17.
Spindle connection.
18.
19.
Transmission axle
20.
21.
22.
23.
RCVC.1.4.ENG
12
1.
2.
3
4.
5.
6.
7.
8.
9.
E.
8
E
4
5
6
7
Excitation coil
Spring
Brake yoke nut
Movable plate
Brakeplate
Pressure disc
Brake lining
Screw
Cover
Brake Clearance
Fig. 6-4-1
- 55 -
RCVC.1.4.ENG
Brakes:
When the current is cut, the electromagnetic attractive force disappears. The brake
spring (2) pushes the pressure plate (6) back on the brake plate (5). The brake is of the
regular closed type.
Opening the brake:
When the excitation coil (1) is excited, the pressure plate (6) is attracted by which the
brake compression spring (2) is pressed in. By this, the brake discs open up.
Brake clearance:
Normal brake clearance is 0.8 to 1.2 mm. Check brake surfaces for soiling (oilgrease).
Brake moment adjustment:
The brake moment is set at the factory.
Opening the brake manually:
The brake can be released manually by loosening the brake yoke (3).
- 56 -
RCVC.1.4.ENG
4.3.3. MAINTENANCE
1/ Every 200 hours or once a month:
2/ Check brake clearance and brake moment, as well as the condition of the brake
4/ Check if there is any foreign matter in the brake and if it is free from oil and
grease.
ATTENTION: The brake must immediately be inspected if:
- It does not work properly
- It is overheating
- Abnormal vibrations are noticed
- Braking torque is insufficient
- 57 -