1.0 OBJECTIVES
The main objectives of this experiment are to install and converge a plug flow reactor and to
simulate a process involving reaction.
2.0 PROCESS
One of the routes to produce acetic anhydride is by the vapor phase cracking of acetone to
produce ketene and methane:
C2H6O
C2H2O+ CH4
This reaction is first order with respect to acetone. The feed condition is 8000 kg/hr of acetone
at 760oC and 150 kPa.
Hint:
1. Use Wilson property package.
2. Qout = 0 W, P = 50 kPa
3. Assume
Length: 30 m
Inner diameter: 0.5 m
4. Kinetics:
5. The length and inner diameter can be changed to achieve specific goal.
3.0 PROCEDURE
1. Firstly, Aspen HYSIS software was opened and the new sheet was applied.
2. Then, the Thermodynamic fluid package and components involve in this reaction was
selected using Wilson package. The components involved were acetone, ketene and
methane.
3. The stream was chose (Stream 1) and added to the simulation field.
4. Then, the plug flow reactor (PFR) was added followed by second stream output of the
PFR (Stream 2).
5. All the information given in the question was filled for stream 1 and the PFR itself.
6. Next, the reaction type was specified to kinetic reaction in order to fill the required
constant A and E in reaction part.
7. With the original length and diameter given (20m and 0.5 m D), the conversion obtained
was about 40%. So, in order to achieve at least 20% conversion, the length and diameter
of PFR tube was modified by trial and error method.
8. The software was saved and closed after valuable data have been recorded.
7.0 CONCLUSION
As a conclusion, by using Aspen HYSIS software, the value of length and tube obtained to
achieve 20% conversion is 20 m tube length and 0.0466 m tube diameter.