Sunteți pe pagina 1din 2

OPERATING CHECK LIST FOR DISEL GENERATOR

DATE:

TIME :

EQUIPMENT TAG NO :
DG NO
:

SHIFT

S.no

Activity Description

Ensure no PTW is pending on the equipment.


Ensure no person is working on the equipment.
Ensure all doors in closed condition.
Measure the power cable individual phase-earth
insulation resistance (with 500V/ insulation
tester). All the three reading shall be > 1.5
Mohms.
Ensure all logics and protections are in service.
Ensure module 560 auto/manual key selector
switch in auto.
Ensure generator breaker panel DSE 7520
auto/manual soft selector switch in auto.
Ensure all control MCB and battery power
supply is in service.
Ensure safety part breaker panel MD32-G
protection relay is in service.

2
4
5

6
7
8
9
10

BASIS

11

Check fuel oil Level (Total capacity :999.9 Ltr)

Middle

12

Check air filter condition.

Clean

13

Check no alarm in panel.

No alarm

14

Check DG local panel start Selection in remote.

Loc/Rem

15

Check DG syn panel start selection in remote.

Loc/Rem

16

Check Lube Oil pressure.

>200kPa

17

Check battery voltage .

24V DC

17

Check battery condition / level

Clean / up to
mark

18

Check coolant level

Normal

19

Check fuel inlet and outlet valves are in open condition.

Open / close

20

Check DG-1 breaker (1CB) is in open condition.

Open / close

21

Check DG-1 breaker (3CB) is in open condition.

Open / close

22

Check EMG MCC-1 incomer #1 breaker (3CB-1) is in


closed condition.

Open / close

23

Check EMG MCC-1 incomer #2 breaker (2ZKK) is in

Result
OK/NOT OK

Remarks

closed condition.
24

Check EMG MCC-1 bus coupler breaker (3ZKK) is in


closed condition.

25

Ensure all above points are satisfied, system is ready


for operation.

Witnessed By

KSK Engineer

KPS Engineer