1.1.1 This document specifies the scope of work and minimum requirements
for constructions of steel and concrete works and any coordination
works required for local authority submission for SYNTHESE (MALAYSIA)
Sdn Bhd. The CONTRACTOR is responsible for all the structures scope
indicated in drawing proposed key plan, drawing no: 1340 001 to 1340
007.
1.1.2 The CONTRACTOR shall verify all the drawings and scope of works.
Any discrepancy and changes made at site shall notify to ENGINEER
immediately.
1.1.3 CONTRACTOR is required to carry out all engineering constructions and
any coordination work required for local authority for civil and
structures work as stated below but not to be limited to:
i.
ii.
1.2
DESCRIPTION OF WORKS
1.2.1
i.
The CONTRACTOR shall carry out the construction of the structural steel
works as per drawing no: 1340 001 to 1340 007. Any discrepancy and
changes made at site shall notify to Engineer immediately.
ii.
iii.
iv.
All staircases shall be constructed with steel frames and chequer plate.
Landing staircase shall be of chequer plate supported with steel frames
with added 50mm lean reinforced lean concrete.
v.
Steel platform with chequer plate flooring shall be provided at the tanks
for access of maintenance services.
vi.
All steel to steel connection shall be provided with High tensile bolts,
Grade 8.8 with correct bolt tensioning method. The steel column base
connection consists of 4 numbers of anchor bolts as per drawing detail.
vii.
viii.
ix.
The scope for the structure steel works shall consist of the following
works but not to be limited to:
a.
b.
Holding down bolts for new steel column and all steel
connections
c.
d.
e.
f.
1.2.2
g.
h.
i.
j.
Water proofing/
cladding
k.
l.
sealant
if
required
for
damaged
The CONTRACTOR shall carry out the demolition works and extension
work of columns as per layout drawing. The scope of works will
include the following items:a. Demolish of a few existing columns, roof rafters, end wall
column and
canopy which maybe blocking the
proposed new tank locations as per
drawing layout.
b. To provide temporary supports/ scaffoldings for the structures
c. To uninstall & reinstall all translucent sheets, roof claddings,
roof purlins with
sag rod, and wind bracing for the
construction of new truss frame.
d. To uninstall & reinstall wall cladding at the affected area if
required for the
construction of extension columns.
e. All damaged materials, e.g. roof steel members, translucent
sheet, roof and
wall cladding cannot be used. However,
minor repair for wall cladding can be
touched up by approved
water proofing sealant
f. All vertical frame members with wall cladding shall be
extended with new
materials at site to cater for the required
structure height.
g. Removal of debris and unwanted materials from site and not
to allowed
them to accumulate at site
h. Leave the site clean for after the demolition work
i.
1.2.3
1.2.4
TEMPORARY FACILITIES
Silt Trap
CONTRACTOR shall design and construct a simple silt
trap to facilitate the site if required.
b.
Security
CONTRACTOR is responsible for the security of the site
for the duration of the WORK.
CONTRACTOR shall use his best endeavors to ensure
that no unauthorized person is permitted to enter or
remain on the site.
c.
d.
Project Signboard
CONTRACTOR shall provide and maintain at a location
to be agreed with OWNER, a signboard for display. The
signboard approved by OWNER shall be complete with
all supports, fixing, bracing, strutting, foundation,
painting, etc.
i.
Fencing
CONTRACTOR shall provide a temporary fencing around
the temporary facilities area, and materials lay-down
area.
j.
1.2.5