Documente Academic
Documente Profesional
Documente Cultură
SOLICITATION NO:
PROJECT TITLE:
Gardez Afghanistan
ISSUED BY:
W91B4P REGIONAL
AFGHANISTAN
APO AE 09314
SUBMISSION DATE:
REGISTRATION #
akcc.sahel.afghan@gmail.com
(0093)-(0) 99-145-518
akcc.sahel.afghan@gmail.com
COMPANY INTRODUCTION:___________________________________________________
Ariana Khost wall road and Service company (AKCC) Working with National and International Donors
agencies, a group of engineers felt the need to establish a Service Company That could help the
international and national donors agencies in the Service Of the Devastated Afghanistan. Most of the
local Afghan Companies have failed to satisfy the International and national Donors agencies due to lack
of Certified technical Staff, Quality Management and Resources as well To Satisfy donors agencies and
to give quality Service in time, so (AKCC) Came into being with the help of Certified, Experience
Engineer and Professional awarded by international Donor agencies:
AKCC: is having all the resources, technical Staff and Machinery that an Ideal & United Europe. GS
Service Company plans to become the leading provider of Service services in the area. This means always
having the best and most efficient facilities, process, and people. To achieve this (Goal) AKCC is
investing in many ways that will pay off in competitive advantages for its customers.
CHARACTER OF COMPANY:___________________________________________________
AKCC is a non-political and non-Governmental Company set up renders rehabilitation, Service and
humanitarian assistance through implementation of government strategy in all over Afghanistan and
Donors agencies.
AKCC is mainly concerned to render Skill wise Engineering Service with Best Quality and On Low
Price to the client and customers.
AKCC is an afghan base Company which is specially set up to undertake Service relief And repatriation
efforts for refuges and needy provides technical Service for planning and Implementation of architectural,
civil, agriculture, health and irrigation projects as well related Activities to save refuges
Background information:________________________________________________________
Company Background: AKCC Company is non-governmental, non-partisan, non-political, established
to assist for the development, rehabilitation and Service of Afghanistan, fully controlled and run by
professional well-educated experienced Afghan expertise.
AKCC is a company formed in 1992 by a committed and talented man as part of a major Service and
rehabilitation of the Afghan Nation. The companys mission is to take part in Service & rebuilding of civil
Project description_____________________________________________________________
The AKCC will provide all labor, materials, operable heavy equipment and vehicles, The AKCC will
construct six (6) each 8x10 (2.45m x 3.05m) Three CONNEX stacked on top of each other type guard
towers complete with electrical wiring, lighting, and HVAC in accordance with the statement of work
(SOW), the Engineering Standard Specifications provided, at FOB Gardez, Afghanistan. The laborers
will be in good physical and mental health and will present themselves for approval to the Contracting
Officers Representative (COR). The contractor will perform to the standards outlined in this SOW.
The AKCC is responsible for verifying information and quantities before starting Service on the project.
Capacity_________________________________________________________
Arianna Khost wall Company (AKCC) was founded in 2008 by Afzal Sahel.
AKCC is a leading Service organization specializing in highways, structures, airports, urban and rural
infrastructure development, water supply and sanitation, irrigation systems, hydraulic structures, traffic
and transportation studies, and environmental studies.
AKCC has a dedicated team of nearly 165 professional staff with state of the art knowledge of
international standards in the fields of planning, feasibility studies, engineering, cost appraisal, financial
analysis, project designing and management, Service and Service supervision, quality control, quality
assurance, safety, quality management, etc.
AKCC, with its deep commitment to quality, client's satisfaction and high standards of professionalism,
continually Endeavours to serve the cause of infrastructure development.
AKCC is a global engineering-Service organization, providing premier technical, management, and
directly related services to develop, manage, engineer, build, and operate installations for customers
worldwide. The value of a consulting, engineering, designing and Service services company is measured
by the professional quality of its staff and the history of successful project experience. We bring expertise
to the specific markets we serve while applying core competencies and skills to all our work.
Reputation____________________________________________________________________
One of the industry's strongest reputations for on-time, in-budget delivery.
Zero claims performance.
Stand behind quality of our work.
Willing to place profit at risk against performance.
Deploying Qualified Expertise____________________________________________________
As a Local Service company, AKCC recruits, processes and delivers hundreds of people to
jobsites these efforts are backed by our ability to deploy teams swiftly, execute, commission and
demobilize rapid-response Service projects quickly. Companies that need highly skilled Service
teams fast rely on our ability to recruit rapidly from overseas demobilization, company
networking and our applicant database of 25,000. For example, we have deployed over 108 craft
employees globally and over 2,000 along the Gulf Coast.
Contact Information
Name: Sangar Aziz
Phone number :(0)0700793677
Hour of operation: full time (form 07am to 4 pm)
The contractor provided alternate points of contact:
Name: Ahmad
Phone number :( 0) 787031523
Hour of operation: full time (form 07am to 4 pm).
Owned Machinery & Equipment Of AKCC
AKCC owned machinery & equipment which can be arranged in any part of Afghanistan. We have
also arranged for better resources for Service material procurement and have a reasonable number
of labor pool who are ready to work in any part of Afghanistan.
NO
Description
Avb. No.
Year
Dozer (D8R)
1998
1995
2002
Excavator (Hitachi)
..
Asphalt Finisher
1998
Roller (8-21 T)
1995 - 1998
PTR Roller
2000
Crane
1995
DumpTrucks
1992
10
Asphalt Plant
1998
11
Crush Plant
1995
12
2005
13
Asphalt Mixer
1999
14
Bitumen Tanker
2000
15
Contract Mixer
1999
16
2004
17
Air Compressor
2005
18
Vibrator
2003
19
Generator
2004
20
Water Pump
2000
21
Theodolit Machine
1999
22
1996
23
1997
24
Rafting forklift
2005
and
Tell: 0707 43 36 43
Duration: Two Months.
Project cost: US$ 58,222.00
Project Completion Date: 2010.
In this hospital the Constructible activities were consist of renovation of walls, Installation of
Tiles, rehabilitation of water supply systems and Electrical equipment.
The supervision was belonging to ICRC engineers and this project completed in three months.
--------------------------------------------------------------------------------------------------------------------Quality Control Plan___________________________________________________________
3. Professional QA/QC plan of AKCC include the following:
3.1.1 Acknowledgement:
Quality management and planning is a significant part of the project. The quality control system
shall consist of plans, procedures, and organization necessary to produce an end product which
complies with the contract requirements. Quality Control deals with issues relating to
conformance to the plans/design and specifications. All of the materials, systems, and
workmanship applied to the project must conform to the requirements set forth in the contract
documents. It is any wonder that quality control and quality assurance are major components of
Service management function.
The AKCC system shall cover all Service operations, both onsite and offsite, and shall be keyed
to the proposed Service sequences.
AKCC provides the necessary inspection and testing procedures to insure that the CQC staff
shall implement the three phase control system for all aspects of the work specified.
We are responsible for the quality of Service and materials used in the work. Quality control (QC)
includes all activities that have to do with making the quality of the Services what it should be (that is,
reasonably serviceable for its intended purpose in keeping with prevailing standards in the industry), and
is sometimes called process control. QC Ensuring that the project team includes a sufficient number of
staff members with appropriate experience.
A typical AKCC QA/QC program includes general elements that are common to all projects, as
well as project specific requirements. General elements typically address the following.
R recruiting and assigning the work force
Personnel assigned to perform quality control.
Project progress schedule.
Schedule of submittals.
Type and frequency of inspections.
Quality control testing plan.
Documentation of quality control activities.
Procedures for corrective action when quality control criteria are not met.
Measures to endure those subcontractors are qualified or certified as required.
Procedures for the inspection, control, and timely delivery of purchased materials
,equipment ,and services
VEHICLES: AKCC shall provide all Equipment and all vehicles and transportation necessary
to accomplish all contract services. All vehicles and Equipment shall be specifically designed
for its designated purpose.
1- Vehicles shall be in operable condition and meet local vehicle requirements.
k- Vehicles shall present a neat appearance and have the companies name affixed on it for
easy Identification.
l- Vehicles shall be operated in accordance with base traffic regulations.
m- Vehicles shall be clearly marked with magnetic markings (provided by the Contractor)
that identify the vehicles as contractor owned.
n- The AKCC Shall register the vehicles with the BDOC to ensure US/Coalition Forces are
aware of the presence of this equipment and not mistake contract equipment for enemy
vehicles.
o- Vehicles will be distinctive in both color and markings and not resemble US/Coalition,
ANA, ANP, or ISAF units.
p- Vehicles may be periodically searched to prevent contraband from entering the COP.
Replacement Equipment: The AKCC shall provide the Government replacement Within 48
hours when equipment is returned to the AKCC for scheduled/unscheduled Maintenance, tire
replacement, accident repairs, and/or is disabled. Replacements will be Dropped off, and picked
up, by the contractor.
Scheduled Maintenance: Periodic inspection or servicing of equipment will be accomplished
when needed. The AKCC will perform preventative maintenance for the equipment on an as
available basis. Work schedules will be passed on to maintenance foreman/supervisor to better
coordinate when scheduled maintenance can be performed without hindering the mission.
Maintenance that is not scheduled but is required to cover any loss or damaged machinery.
AKCC will provide insurance for leased vehicles or heavy equipment and will be held
accountable for negligence of contractor personnel.
AKCC is not authorized to quit work before 1730 local time or otherwise stop work without
consulting with the COR. All materials, equipment, and personnel shall arrive at the project site
The AKCC shall supply all tools and equipment to maintain equipment. All equipment shall be
in operable condition.
AKCC shall provide oil, spare parts, tools, and mechanics to repair and maintain equipment.
Any broken or damaged equipment will be fixed immediately or replaced.
DELIVERY AND STORAGE OF MATERIALS AND EQUIPMENT: The contractor is responsible
for delivering any and all materials and equipment required by this contract to maintain equipment
required.
QUALITY CONTROL:
q- The contractor shall maintain a quality control plan and provide for the direct supervision
of employees from the start of project work through project completion.
r- The contractor is responsible for inspecting all work areas and determining actual work
area conditions and work requirements. Pre-existing conditions shall not be the basis for
any modifications to the contract.
s- The contractor shall comply with all specifications and plans provided for or referred to
herein. In addition, building materials shall be installed level and watertight; and all
work shall be plumbed and square, with structural members and sheathing components
securely fastened and properly aligned and jointed.
t- All Service techniques, procedures, and finished work will be completed commensurate
with the industry accepted standard practices and procedures for such work.
u- The contractor may consider Service techniques or practices as recommended by the
COR to improve the quality and pace of work so long as such recommendations do not
change the specifications or scope or work.
v- Contractor is responsible for the quality of all employee work. Consequently, the
contractor shall provide personnel with adequate training/experience to perform tasks
outlined in the TECHNICAL REQUIREMENTS and contract.