Documente Academic
Documente Profesional
Documente Cultură
This Technical Training applies to the following model # WALL OVEN SINGLE/RANGES
MODELS: CPS/CPD/ECPS/ECPD/RSD/RSE/PGR/RSG/ERSD/ERD/ERDE.
Condition / Cause: Testing controllers control voltage from ERC/Clock Controller to Main
Relay Board.
Cause:
Solution/Answer: Do the following checks for (Blank Display/No Bake/Broil/Convection.
Tools needed; Volt Meter, Burner tool for range models, 86007c
The wiring harness diagram below is a picture of the low voltage harness that connects the
ERC/Clock controller to the Main Relay Board. When looking at the picture of the Low
voltage harness each wire in the harness is label. When programming a cooking function
through the Membrane Touch Pad the ERC/Clock control send 24 VDC by way of the Low
Voltage Harness to the Main Relay Board. Example: If the unit is program into a bake
cooking mode the ERC/Clock control will send 24 VDC by way of the Low Voltage Harness
thought wire # 5 to the main relay board to close the bake relay which supplies the (L2) side
voltage to one side of the bake element. The ERC/Clock must then send 24VDC to close the
DBL ( Double Line Relay) to send the ( L1) line supply down to the other side of the bake
element which gives the element its 240VAC. T o test the 24VDC out of the ERC/Clock to the
Main Relay Board use a voltage meter set the meter to read VDC insert the test leads into
the back side of the Low Voltage Harness at wire # 1&5 for bake relay and 1&2 for DLB
(Double Line Relay). The Low Voltage Harness is number 1-16 which is coming off the back
side of the ERC/Clock and 1-14 is plug into the Main Relay Board. Please notice wires 14 &
15, these two wires are the supply voltage to power up the ERC/Clock control (24VAC) From
the Main Relay Board.
If you have any questions or concerns with this Technical Tip, please call: 800-353-2267 or email
wking@dacor.com
63009 – Rev A