Sunteți pe pagina 1din 17

CHAPTER 17

HYDROSTATIC TABLES
Chapter 17
Hydrostatic Tables
Exercise -13
Answer 1
Displacement

9451

Displacement

9275.8 t

TPC

21.97

TPC

21.938

MCTC

164.3

MCTC

163.7 t

LCB

72.016

0.2

LCB

72.016

LCF

71.97

0.2

LCF

71.987 m

KB

2.576

0.2

KB

2.535

KMT (m)

KMT (m)

KMT (m)

263.9 0.2

KMT (m)

267.980 m

0.2

0.2

x
0.12

21.89

x
0.12

162.7

x
0.12

72.02

x
0.12

t/cm
0.2

8.828 0.2
8.894

9013

72.01 =

2.473

x
0.12

x
0.12

8.992 =

x
0.12

274.1 =

x
0.12

Page 1 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 2

TMD

TMD

7990.0

7708

8141

7708

4.130

21.7

TPC

21.665

MCTC

159.6

MCTC

159.0 t

LCB

72.012

0.2

LCB

72.011

LCF

72.099

0.2

LCF

72.109 m

KB

2.256

0.2

KB

2.218

KMT (m)

KMT (m)

KMT (m)

296.7 0.2

KMT (m)

301.320 m

TPC

21.6

0.2

x
0.2

x
0.13

157.8

x
0.13

72.01

x
0.13

t/cm
0.2

9.406 0.2
9.495

72.13 =

2.147

x
0.13

x
0.13

9.66 =

x
0.13

309.9 =

x
0.13

Page 2 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 3
Displacement = Displacement at 5m draft * RD of DW
1.025
Displacement = 9891 * 1.005
1.025
Displacement = 9691t

Answer 4

RD of Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.017
1.017

5.600
5.800

11223.0
11672.0

10949.268
11387.317

11135.4
11580.9

Displacement
=

Displacement

11580.9

0.2

11135.4

x
0.03

11202.2 t

Answer 5

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.009
1.009
1.009

6.321
6.200
6.400

12850.3
12575.0
13030.0

12536.854
12268.293
12712.195

12649.7
12378.7
12826.6

TMD

12649.7
12826.6

12378.7
12378.7

TMD

6.200

TMD

0.121

6.200

TMD

6.321m

x
0.2

Page 3 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 6

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.020
1.020
1.020

5.072
5.000
5.200

10050.1
9891.0
10333.0

9804.995
9649.756
10080.976

10001.1
9842.8
10282.6

TMD

10001.1
10282.6

9842.8
9842.8

TMD

5.000

TMD

0.072

5.000

TMD

5.072m

x
0.2

Answer 7

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.015

5.000

9891.0

9649.756

9794.5

Displacement

Displacement

9794.5

0.2

9794.5

x
0.000

21.845

x
0.000

164.1

x
0.000

72.014

x
0.000

9794.5 t

TPC

21.845

0.2

TPC

21.845

t/cm

MCTC

164.1

0.2

MCTC

LCB

164.1 t
72.014

0.2

Page 4 of 17

CHAPTER 17
HYDROSTATIC TABLES

LCB

72.014

LCF

71.913

0.2

LCF

71.913 m

KB

2.685

0.2

KB

2.685

KMT (m)

8.686

71.913

x
0.000

2.685

x
0.000

8.686

x
0.000

254.300

x
0.000

0.2
KMT (m)

8.686

KMT (m)

254.300

0.2

KMT (m)

254.300

Answer 8

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.000
1.000
1.000

6.100
6.000
6.200

12348.5
12122.0
12575.0

12047.317
11826.341
12268.293

12047.3
11826.3
12268.3

Displacement

12268.3

Displacement

12047.3 t

TPC

21.990

0.2

TPC

21.946

t/cm

MCTC

170.3

0.2

0.2

11826.3

x
0.100

21.902

x
0.100

168.7

x
0.100
Page 5 of 17

CHAPTER 17
HYDROSTATIC TABLES

MCTC

169.5 t

LCB

71.939

0.2

LCB

71.950

LCF

71.329

0.2

LCF

71.401 m

KB

3.309

0.2

KB

3.257

KMT (m)

8.180

71.960

x
0.100

71.472

x
0.100

3.205

x
0.100

8.234

x
0.100

217.200

x
0.100

0.2
KMT (m)

8.207

KMT (m)

211.600

0.2

KMT (m)

214.400

Answer 9

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.013
1.013
1.013

4.700
4.600
4.800

9232.0
9013.0
9451.0

9006.829
8793.171
9220.488

9123.9
8907.5
9340.4

Displacement

Displacement

TPC

9340.4

0.2

8907.5

x
0.100

21.634

x
0.100

9123.9 t
21.713

0.2

Page 6 of 17

CHAPTER 17
HYDROSTATIC TABLES

TPC

21.673

t/cm

MCTC

162.4

0.2

MCTC

LCB

72.016

0.2

LCB

72.017

LCF

71.970

0.2

LCF

71.992 m

KB

2.576

0.2

KB

2.525

KMT (m)

8.828

160.8

x
0.100

72.017

x
0.100

72.013

x
0.100

2.473

x
0.100

8.992

x
0.100

274.100

x
0.100

161.6 t

0.2
KMT (m)

8.910

KMT (m)

263.900

0.2

KMT (m)

269.000

Answer 10

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.000
1.000
1.000

5.162
5.000
5.200

10249.0
9891.0
10333.0

9999.044
9649.756
10080.976

9999.0
9649.8
10081.0

TMD

9999.0
10081.0

9649.8
9649.8

x
0.2
Page 7 of 17

CHAPTER 17
HYDROSTATIC TABLES

TMD

5.000

TMD

0.162

5.000

TMD

5.162

Displacement

10081.0

Displacement

0.2

9649.8

x
0.162

21.522

x
0.162

161.7

x
0.162

72.014

x
0.162

71.913

x
0.162

2.685

x
0.162

8.686

x
0.162

254.300

x
0.162

9999.0 t

TPC

21.600

0.2

TPC

21.585

t/cm

MCTC

163.0

0.2

MCTC

LCB

72.011

0.2

LCB

72.012

LCF

71.842

0.2

LCF

71.855 m

KB

2.789

0.2

KB

2.769

KMT (m)

8.566

162.8 t

0.2
KMT (m)

8.589

KMT (m)

245.400

0.2

Page 8 of 17

CHAPTER 17
HYDROSTATIC TABLES

KMT (m)

247.091

Answer 11

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.018
1.018
1.018

4.427
4.400
4.600

8635.0
8576.0
9013.0

8424.385
8366.829
8793.171

8576.0
8517.4
8951.4

TMD

8576.0
8951.4

8517.4
8517.4

x
0.2

TMD

4.400

TMD

0.027

4.400

TMD

4.427

Displacement

8951.4

0.2

8517.4

x
0.027

Displacement

21.651

x
0.027

160.2

x
0.027

72.015

x
0.027

72.056

x
0.027

8576.0 t

TPC

21.741

0.2

TPC

21.663

t/cm

MCTC

161.6

0.2

MCTC

LCB

72.017

0.2

LCB

72.015

LCF

72.013

0.2

160.4 t

Page 9 of 17

CHAPTER 17
HYDROSTATIC TABLES

LCF

72.050 m

KB

2.473

0.2

KB

2.381

KMT (m)

8.992

2.367

x
0.027

9.182

x
0.027

285.000

x
0.027

9891.0

x
0.100

0.2
KMT (m)

9.156

KMT (m)

274.100

0.2

KMT (m)

283.529

Displacement

10333.0

0.2

Displacement

10112.0 t

Answer 12

Final Displacement of vessel = Initial displacement + Cargo Loaded + FW & bunkers


Final Displacement of vessel = 10112.0t + 1800t + 400t
Final Displacement of vessel = 12112.0t

TMD

12312.3
12575.0

12122.0
12122.0

TMD

6.000

TMD

0.084

6.000

TMD

6.084

x
0.2

Page 10 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 13
Displacement on arrival

Displacement

Displacement

9013.0

0.2

9013.0

x
0.000

9891.0

x
0.000

9013.0 t

Displacement on departure

Displacement

Displacement

9891.0

0.2

9891.0 t

Final Displacement = Initial Displacement cargo worked + Stores Received


9891t = 9013t + 1500t cargo worked
9891t = 10513t cargo worked
9891t = 10513t cargo discharged
Cargo discharged = 10513t 9891t
Cargo discharged = 622t

Answer 14
Initial Displacement

Displacement

Displacement

7708.0

0.2

7708.0

x
0.000

7708.0 t

Final Displacement = Initial Displacement + Cargo loaded Ballast pumped out


Final Displacement = 7708t + 5000t 800t
Final Displacement = 11908t

TMD

11908.3
12122.0

11672.0
11672.0

x
0.2
Page 11 of 17

CHAPTER 17
HYDROSTATIC TABLES

TMD

5.800

TMD

0.105

5.800

TMD

5.905

Answer 15

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.010
1.010
1.010

5.300
5.200
5.400

10555.0
10333.0
10777.0

10297.561
10080.976
10514.146

10400.5
10181.8
10619.3

Initial Displacement

Displacement

10619.3

Displacement

10400.5 t

0.2

10181.8

x
0.100

x
0.2

Final Displacement = Initial Displacement + Cargo loaded


Final Displacement = 10400.5t + 2500t
Final Displacement = 12900.5
Draft at RD 1.010

TMD

12900.0
13288.6

12839.3
12839.3

TMD

6.400

TMD

0.027

6.400

TMD

6.427

Page 12 of 17

CHAPTER 17
HYDROSTATIC TABLES
Draft at RD 1.025

TMD

12900.3
13030.0

12575.0
12575.0

TMD

6.200

TMD

0.143

6.200

TMD

6.343

x
0.2

Answer 16

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.017
1.017
1.017

5.600
5.600
5.800

11223.0
11223.0
11223.0

10949.268
10949.268
10949.268

11135.4
11135.4
11135.4

Initial Displacement at 5.6m at RD 1.017

Displacement

11135.4

Displacement

11135.4 t

0.2

11135.4

x
0.000

x
0.000

Final Displacement required at 6.4m draft at RD 1.025

Displacement

13030.0

Displacement

13030.0 t

0.2

13030.0

Cargo to load = Final Displacement Initial Displacement


Cargo to load = 13030.0t 11135.4t
Cargo to load = 1894.6t

Page 13 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 17
Initial Displacement

Displacement

12122.0

Displacement

12122.0 t

0.2

12122.0

x
0.000

Depth of bar = 5.4m


UKC
=-0.4m
Draft required = 5.0m

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.015
1.015
1.015

5.000
5.000
5.200

9891.0
9891.0
9891.0

9649.756
9649.756
9649.756

9794.5
9794.5
9794.5

Final Displacement required at 5m draft at RD 1.015

Displacement
=

Displacement

9794.5

0.2

9794.5

x
0.000

9794.5 t

Final Required displacement = Initial Displacement Cargo to discharge


9794.5t = 12122.0t Cargo to discharge
Cargo to discharge = 12122.0t 9794.5t
Cargo to discharge = 2327.5t

Page 14 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 18
Displacement on arrival at RD 1.006 at draft 4.9m

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.006
1.006
1.006

4.900
4.800
5.000

9671.0
9451.0
9891.0

9435.122
9220.488
9649.756

9491.7
9275.8
9707.7

Displacement

Displacement

9707.7

0.2

9275.8

x
0.100

9491.7 t

Displacement on arrival at RD 1.018 at draft 6.0m

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.018

6.000

12122.0

11826.341

12039.2

Displacement

12039.2

Displacement

12039.2 t

0.2

12039.2

x
0.000

Final Displacement = Initial displacement Cargo (2 * heavy lift of 200t)


12039.2t

= 9491.7t Cargo (2 * 200)

12039.2t

= 9491.7t 400t Cargo

12039.2t

= 9091.7t + Cargo

12039.2t 9091.7t = Cargo Loaded


2947.5t

= Cargo Loaded

Page 15 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 19
Displacement of vessel while leaving Bombay = 13943t
Total consumption = (Number of days) * (Fuel Consumption + FW Consumption)
Total Consumption = 6 * (20 + 15)
Total Consumption = 6 * 35
Total Consumption = 210t
Final Displacement = Initial Displacement Consumption
Final Displacement = 13943.0t 210.0t
Final Displacement = 13733.0t
Draft of vessel at RD 1.000

RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.000
1.000
1.000

6.858
6.800
7.000

14076.1
13943.0
14402.0

13732.790
13602.927
14050.732

13732.8
13602.9
14050.7

TMD

13732.8
14050.7

13602.9
13602.9

TMD

6.800

TMD

0.058

6.800

TMD

6.858

x
0.2

x
0.2

Draft of vessel at RD 1.025

TMD

13732.8
13943.0

13486.0
13486.0

TMD

6.600

TMD

0.108

6.600

TMD

6.708

m
Page 16 of 17

CHAPTER 17
HYDROSTATIC TABLES
Answer 20
Initial Displacement
RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.020

5.400

10777.0

10514.146

10724.4

Displacement

10724.4

Displacement

10724.4 t

0.2

10724.4

x
0.000

Total consumption = (Number of days) * (Fuel Consumption + FW Consumption)


Total Consumption = 8 * (14 + 16)
Total Consumption = 8 * 30
Total Consumption = 240t
Final Displacement required at draft of 6.3m at RD 1.000
RD of DW
Water

Draft in
(m)

W in SW (t)

U/W Vol (m3)

W in DW of RD (t)

1.000
1.000
1.000

6.300
6.200
6.400

12802.5
12575.0
13030.0

12490.244
12268.293
12712.195

12490.2
12268.3
12712.2

Displacement

12712.2

Displacement

12490.2 t

0.2

12268.3

x
0.100

Final Displacement required = Initial Displacement Total consumption + Cargo loaded


12490.2t = 10724.4t 240t + Cargo loaded
12490.2t = 10484.4t + Cargo loaded
12490.2t 10484.4t = Cargo loaded
2005.8t = Cargo loaded

-o0o-

Page 17 of 17

S-ar putea să vă placă și