SUPPORT REACTIONS
JOINT
LOAD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
101
102
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
103
104
105
106
107
108
109
110
111
112
113
114
115
144
145
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
4
5
3.3
-156.93
15.95
-349.98
0.04
-0.42
-0.03
-3.9
0.1
-0.36
0.53
-11.29
0.13
-9.73
-1.09
-26.34
-0.57
-18.9
-0.6
-18.76
-0.83
-18
-0.63
-16.31
-2.22
-30.21
4
-1.53
2.03
-43.39
73.9
60.13
77.94
62.24
71.82
58.12
61.63
51.98
91.63
68.76
59.5
47.56
42.12
33.23
78.31
63.77
79.85
61.99
66.3
53.2
65.14
52.48
38.5
30.43
78.44
64.29
1290.41
1021.47
1293.15
1021.52
1.55
0.01
0.08
-0.32
0.12
-0.86
28.19
29.93
23.02
28.85
8.16
8.03
-16.24
-19.59
-13.5
-17.43
49.12
49.64
-69.92
-50.01
-76.29
-59.33
79.98
68.73
21.05
8.14
-21.27
-17.46
27.58
18.18
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-42.05
-36.79
69.19
41.19
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.13
2.56
2.85
1.68
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-7.05
96.04
3.56
155.39
DESIGN OF PILES
Design Parametres:Concrete mix
Steel
Cover to Reinforcement
Characteristic compressive strength of concrete =
Yield strength of steel =
Item
: M20
: Fe415
: 40mm
20N/sqmm
415N/sqmm
Piles(15)
Max.Load 'P' in KN
Dia.of pile proposed in 'mm'
No.of Under Reams proposed
Dia.of under reamed in 'm'
Depth of the pile proposed in 'm'
Bearing capacity of the pile in KN
Main Reinforcement
Stirrups
489.44
450
2
1.13
4.5
573.3
7-12mm
8mm@300 c/c
Note:-1)The above design is as per clauses 6.3, 6.3.1, 6.6 and 8.3.2.2 of IS 2911(PartIII)-1973 duly
reducing bearing resistance by 25% for submerged condition)
2)Considering the moment to be resisted,in addition to the axial load,pile caps of
size 0.91x0.91x0.30m size are proposed
: M20
: Fe415
: 50mm
25.0KN/cum
19.0KN/cum
20.00N/sqmm
415N/sqmm
0.30m
0.45m
0.375m
768.60KN
650.18KN
65.02KN
715.20KN
As per Table 1 of IS:2911(Part III)-1980,safe load carrying capacity 375mm dia DUR piles in medium compact
sandy soils or clayey soils of medium consistency is =
360.00KN
As per clause 5.2.7.2 of IS:2911(Part III)-1980,the minimum spacing between the centre to centre of bored DUR
piles should not be less than 1.5Du.
Further as per clause 5.2.8.1,the load carrying capacity of each individual pile should be reduced by 10% due to
group action.
As per Table 1 of IS:2911(Part III)-1980,safe load carrying capacity 375mm dia DUR piles for a depth of 3.75m
in medium compact sandy soils or clayey soils of medium consistency is =
360.00KN
Providing two piles,the load carrying capacity of the pile cap will be
720.00KN
540.00KN
Reducing 10% per each pile due to group action,the safe load carrying
capacity
486.00KN
729.00KN
Hence O.K
375mm
0.70
375mm
2.09
1.41
0.70
PC1
As such,the dimensions of the pile cap of as given below:The length of pile cap proposed =
The width of pile cap proposed =
Distance between c/c of piles = L =
Shear span av =
2.09m
0.70m
1.41m
0.480m
III) Depth of pile cap:a)For bending action:The ultimate bending moment on the pile cap = M u = (Pu/2)x[L/2-a/4] =
211.88KN-m
[Mu/(0.138fckb)]0.5
331.16mm
= 391.16mm
590.00mm
75.29mm
1050.98sqmm
3.35Nos
4Nos
1256.00sqmm
0.304
b)Check for shear:The critical section of one way shear is at a distance of 'd' from the face of the column
Hence,the factored design shear force V Fd =
Nominal shear stress Tv =
357.60KN
0.304%
The design shear strength of concrete for the above steel percentage from
Table 19 of IS 456 is
0.386 N/sqmm
As per clause 40.5.1 of IS 456:2000,the shear strength can be increased by 2d/a v times for the sections located
at a distance closer than 2d from concentrated load or face of support,where a v is the shear span
2d/av =
Hence,increased shear strength =
2.46
0.950 N/sqmm Hence Vuc =
392.17KN
0.950 >0.866
Hence,no shear reinforcement is required.
0.81 >0.60
Though,the truss action is not pre-dominant,the tensile reinforcement should be checked for horizontal tensile force
resulting from truss action,because av/d ratio is not more than 2.
Hd=(Pu/2)[L/2-a/4]
H = Pu/8d[2L-a] =
359.11KN
Area of steel required to resist the above above tensile force Ast =
994.63sqmm
The tensile reinforcement provided is more than the above value.Hence O.K
d) Bursting steel:Generally 0.2 times tensile steel will be provided as bursting steel.
Hence,the bursting steel required =
Adopting 12mm rings,No.of rings required =
251.20sqmm
2.22
es in medium compact
18
16.2
97.2
: M20
: Fe415
: 50mm
25.0KN/cum
19.0KN/cum
20.00N/sqmm
415N/sqmm
0.30m
0.45m
0.450m
939.19KN
As per Table 1 of IS:2911(Part III)-1980,safe load carrying capacity 450mm dia DUR piles in medium compact
sandy soils or clayey soils of medium consistency for 4.50m depth is =
360.00KN
As per clause 5.2.7.2 of IS:2911(Part III)-1980,the minimum spacing between the centre to centre of bored DU
piles should not be less than 1.5Du.
Further as per clause 5.2.8.1,the load carrying capacity of each individual pile should be reduced by 10% due
group action.
As per Table 1 of IS:2911(Part III)-1980,safe load carrying capacity 450mm dia DUR piles in medium compact
sandy soils or clayey soils of medium consistency is =
Providing two piles,the load carrying capacity of the pile cap will be
Reducing 25% for probable water in bulb,the load carrying capacity
Reducing 10% per each pile due to group action,the net safe load carrying
capacity
Hence,ultimate load carrying capacity of the pile cap =
450mm
.7 5
2.44
Column
0.30x0.45
Column
0.30x0.45
450mm
0 .7 5
2.44
PC2
1.69
As such,the dimensions of the pile cap of as given below:The length of pile cap proposed =
The width of pile cap proposed =
Distance between c/c of piles = L =
Shear span av =
III) Depth of pile cap:a)For bending action:The ultimate bending moment on the pile cap = M u = (Pu/2)x[L/2-a/4] =
Adopting Limit state method of design Mu = 0.138 fckbd2
[Mu/(0.138fckb)]0.5
427.54mm
Over all depth required assuming 20mm dia bars =
= 487.54mm
516.55KN
0.474%
The design shear strength of concrete for the above steel percentage from
Table 19 of IS 456 is
0.468 N/sqmm
As per clause 40.5.1 of IS 456:2000,the shear strength can be increased by 2d/a v times for the sections locate
at a distance closer than 2d from concentrated load or face of support,where a v is the shear span
2d/av =
Hence,increased shear strength =
2.23
1.044 N/sqmm Hence Vuc =
540.08KN
1.044 >0.998
Hence,no shear reinforcement is required.
0.9 >0.60
Though,the truss action is not pre-dominant,the tensile reinforcement should be checked for horizontal tensile
resulting from truss action,because av/d ratio is not more than 2.
Hd=(Pu/2)[L/2-a/4]
H = Pu/8d[2L-a] =
548.37KN
Area of steel required to resist the above above tensile force Ast =
The tensile reinforcement provided is more than the above value.Hence O.K
d) Bursting steel:Generally 0.2 times tensile steel will be provided as bursting steel.
Hence,the bursting steel required =
Adopting 12mm rings,No.of rings required =
490.63sqmm
4.34
11,13,14,17)
939.19KN
93.92KN
1033.11KN
2.44m
0.75m
1.69m
0.620m
378.38KN-m
690.00mm
108.75mm
1626.51sqmm
3.32Nos
5Nos
2453.13sqmm
0.474
.Hence O.K
1518.82sqmm
#DIV/0!
: M20
: Fe415
: 75mm
25.0KN/cum
19.0KN/cum
20.00N/sqmm
415N/sqmm
0.45m
0.60m
0.375m
1389.72KN
As per Table 1 of IS:2911(Part III)-1980,safe load carrying capacity 375mm dia DUR piles in medium compact
sandy soils or clayey soils of medium consistency is =
360.00KN
As per clause 5.2.7.2 of IS:2911(Part III)-1980,the minimum spacing between the centre to centre of bored DUR
piles should not be less than 1.5Du.
Further as per clause 5.2.8.1,the load carrying capacity of each individual pile should be reduced by 10% due to
group action.
As per Table 1 of IS:2911(Part III)-1980,safe load carrying capacity 300mm dia DUR piles in medium compact
sandy soils or clayey soils of medium consistency is =
Increase in load carrying capacity for increase in depth of 0.75m =
Increased load carrying capacity in compression =
Assuming water table in the pile bulb,the safe load carrying capacity is to be reduced by 25% as per the
clause B-1.6 of IS 2911(Part III)-1980.
Hence,the load carrying capacity of the individual pile =
Providing four piles,the load carrying capacity of the pile cap will be
Reducing 10% per each pile due group action,the net safe load carrying
capacity
Hence,ultimate load carrying capacity of the pile cap =
PC3
0.68
PC3
2.00
2.68
0.68
0.15
As such,the dimensions of the pile cap of as given below:The length of pile cap proposed =
The width of pile cap proposed =
Distance between c/c of piles = L =
Depth of pile cap assumed = D =
Effective depth = d =
Shear span av =
III) Depth of pile cap:a)For bending action about Y--Y direction:The ultimate bending moment on the pile cap = M u = (Pu/4)x[L/2-a/4] =
Adopting Limit state method of design Mu = 0.138 fckbd2
The effective depth of footing required = d =
[Mu/(0.138fckb)]0.5
209.57mm
= 294.57mm
[Mu/(0.138fckb)]0.5
214.14mm
= 224.14mm
382.17KN
0.124%
The design shear strength of concrete for the above steel percentage from
Table 19 of IS 456 is
0.280 N/sqmm
As per clause 40.5.1 of IS 456:2000,the shear strength can be increased by 2d/a v times for the sections located
at a distance closer than 2d from concentrated load or face of support,where a v is the shear span
2d/av =
Hence,increased shear strength =
1.61
0.451 N/sqmm Hence Vuc =
682.60KN
0.451 >0.252
Hence,no shear reinforcement is required.
1.24 >0.60
Though,the truss action is not pre-dominant,the tensile reinforcement should be checked for horizontal tensile fo
resulting from truss action,because av/d ratio is not more than 2.
Hd=(Pu/4)[L/2-a/4]
H = Pu/16d[2L-b] =
600.32KN
Area of steel required to resist the above above tensile force Ast =
The tensile reinforcement provided is more than the above value.Hence O.K
d) Bursting steel:Generally 0.2 times tensile steel will be provided as bursting steel.
Hence,the bursting steel required =
Adopting 12mm rings,No.of rings required =
376.80sqmm
3.33
,18,19,144,145
1389.72KN
138.97KN
1528.69KN
68
303.75KN
1215.00KN
1093.50KN
2.00
2.68
68
2.680m
2.680m
2.000m
0.650m
0.565m
0.700m
324.85KN-m
565.00mm
30.49mm
1629.38sqmm
5.19Nos
6Nos
1884.00sqmm
0.124
339.18KN-m
565.00mm
31.87mm
1703.05sqmm
5.42Nos
6Nos
1884.00sqmm
0.124
of the column
he shear span
1662.71sqmm
e value.Hence O.K