Documente Academic
Documente Profesional
Documente Cultură
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
2011/2012
INDEX
1.TolerancesChain
2.ManufacturingSystembasedonCAD/CAM
3.ToolCAD/CAMCATIAV.5
4.VirtualManufacturing TRAINING
4.1ApplicationCNC
4.2ApplicationComposites
4 3 Application Riveting
4.3ApplicationRiveting
4.4ToolingManufacturing
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
REFERENCE:
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
1. CHAIN OF TOLERANCE
1.1 Chain of tolerances in Aeronautics
1.2 Process of Analysis. Reference Systems
1.3 Metrology - Measurement Systems
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Manufacturing tolerances:
The manufacturing processes introduced in the dimensions of the parts
errors or deviations from established measures at the definition of them.
These deviations are due to:
- Games of the tools or machine tools used in the manufacture
- Errors of measuring instruments or measuring operators.
operators
- Dilation of the parts of bodies as a result of temperatures that
acquire parts to make them.
- Deformations produced by the internal tensions of the pieces.
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
FAL A400M
Airbus Militarys A400M multi-role transport aircraft has completed a series of tests to validate the lowest speed at which it can take off. (24 March 2011) March 2011
Airbus S.A.S 2011
Proveedor Avinica
Proveedor Estruct.1
CENTRAL BOX
Proveedor Estruct.3
NOSE-PROA
NOSE
PROA
Proveedor Estruct.2
CONTROL SURFACE
Proveedor SYSTEMS
Proveedor Tren
Proveedor Estruct.5
Fuselaje
Proveedor Estruct.4
GNDOLAS
Airbus Militarys A400M multi-role transport aircraft has completed a series of tests to validate the lowest speed at which it can take off. (24 March 2011) March 2011
Airbus S.A.S 2011
Proveedor P1
Proveedor P1
Proveedor A1
Proveedor
SYSTEMSPOWER PLANT.
ENGINE AND PROPELLER
Proveedor A2
Proveedor CB1
Proveedor CS1
Proveedor Estruct.2
CONTROL SURFACE
Proveedor Estruct.1
CENTRAL BOX
Proveedor Avinica
Proveedor CS2
Proveedor CB2
Proveedor P1
Proveedor 3NP1
Proveedor S1
Proveedor Estruct.3
NOSE-PROA
NOSE
PROA
Proveedor 3NP2
Proveedor 3NP3
Proveedor SYSTEMS
Proveedor S2
Proveedor Tren
Proveedor T1
Proveedor Estruct.4
GNDOLAS
Proveedor Estruct.5
Fuselaje
Proveedor T2
Proveedor F1
Proveedor F2
Proveedor G1
Proveedor S3
Proveedor G2
Airbus Militarys A400M multi-role transport aircraft has completed a series of tests to validate the lowest speed at which it can take off. (24 March 2011) March 2011
Airbus S.A.S 2011
Proveedor P1
Proveedor P1
di
di
Proveedor A1
Proveedor
SYSTEMSPOWER PLANT.
ENGINE AND PROPELLER
di
Proveedor P1
Proveedor 3NP2
di
Proveedor 3NP3
di
Proveedor Avinica
Proveedor CB1
di
Proveedor CB2
di
di
Proveedor CS1
di
Proveedor Estruct.2
CONTROL SURFACE
Proveedor Estruct.1
CENTRAL BOX
di
di
Proveedor 3NP1
di
di
Proveedor A2
Proveedor CS2
di
di
di
di
di
Tol. i
di
Proveedor Estruct.3
NOSE-PROA
NOSE
PROA
di
Proveedor T1
di
di
Proveedor T2
di
di
Proveedor Estruct.5
Fuselaje
Proveedor F1
Proveedor F2
di
Proveedor S1
Proveedor SYSTEMS
di
di
Proveedor Tren
di
di
di
Proveedor Estruct.4
GNDOLAS
di
Proveedor G1
di
Proveedor S2
Proveedor S3
di
Proveedor G2
Airbus Militarys A400M multi-role transport aircraft has completed a series of tests to validate the lowest speed at which it can take off. (24 March 2011) March 2011
Airbus S.A.S 2011
Standards of Representation
By the standards we define and describe the tolerances of the linear
dimensions for use in technical drawings.
g
Tolerances indication of a method of representation does not involve the
use of a particular manufacturing method, measurement or control.
Standards:
EN 20286 Sistema ISO de tolerancias
UNE
UNE 1129 Tolerancias
Tl
i de
d cotas
t lineales
li l
UNE 1122 Acotacin tolerancias conos
UNE 1149 Principios de tolerancias fundamentales
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Analysis of Tolerances:
There will be based on standards and criteria and a system of
dimensional and geometric tolerances for the identification,
evaluation, measurement and correction.
Reference Systems:
C ll b t on the
Collaborate
th metrological
t l i l inspection
i
ti
off the
th product
d t
manufactured and will be a function of the measurement method
adopted
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
PROBLEMS OF TOLERANCE
REJECTION!
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
CORRECTION
PROCESS
MANUFACTURING
MEASUREMENT
METROLOGY
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
10
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
11
INFORMATION
ACCURACY
VELOCITY
INVESTMENT
TRAINED
PEOPLE
SYSTEM MMC
CONVENTIONAL
FIXTURE
High
Basic
Regular
Very Good
Good
NA
Good
Highest
Low
Media
Excelent
Low
High
Good
Basic
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
TIME
CORRECTNESS
COST
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
12
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Hamburg, Germany
Toulouse
Cdiz,Spain
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
13
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
14
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
15
CAD
I-DEAS
PDM
Company
Metaphase
p
SDRC
SAP PDM
SAP
MatrixOne
MatrixOne
PTC
Pro/Engineer
Windchill
PTC
EDS-UGS
UNIGRAPHICS
iMAN
EDS-UGS
Dassault-IBM
CATIA
IBM-PLM
Dassault-IBM
I t
Intergraph
h
I t
Intergraph
h
Ariba(Agile)
Agile Software-Ariba
Axalant
Eigner + Partner
SmarTeam
Smart Solutions
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
16
The data are owned by the CAD system that produces them, being in
the role of PDM management system of references to documents.
CAD/CAM
System
Virtual Manufacturing
PDM
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
17
CATIA V.6
PDM MODEL CAD/CAM
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
PRODUCTION
Parts under virtual model
Manufacturing Management
System (Material Resources)
Manufacturing Management
System (Human Resources)
Infrastructure CAD/CAM
Specialists / Assemblers
OUTSOURCING
Junction System(r)
y
()
Virtual
Manufacturing
Tooling requirements
Materials integration
Infrastructure and auxiliary
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
18
PRODUCTION
Parts under REAL model
Manufacturing Management
System (Material Resources)
Manufacturing Management
System (Human Resources)
Infrastructure CAD/CAM
Specialists / Assemblers
OUTSOURCING
Junction System(r)
y
()
Virtual
Manufacturing
Tooling requirements
Materials integration
Infrastructure and auxiliary
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Dassault Falcon 7X
AUTONOMY:. 5,950 nm (10.260 km)
SPEED: To Mach .90 Maximum Operating Speed (MMO)
SEATS 10 17
SEATS:10-17
Passengers: 8
Crew: 3 pilots, 1 flight attendant
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
19
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
20
PDM
Machine Tools
Manufacturing Management
Industrial Design
Tooling
oo g des
design
g
...
2
1
BUTTON
2 PULSADO
2 + UNA VEZ 1
(Y NO SUELTO 2)
2 + 1 (FIJNDOLOS)
SYMBOL
EFFECT
MUEVE EN PLANO PANTALLA
ZOOM
GIRO en 3 D
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
21
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
22
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Application to automotive
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
23
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
24
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
25
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
26
ThefirstoffiveA380sforChinaSouthern
Ai li
AirlinestouchesdowninHamburg,Germany,
t h d
i H b
G
completingitssuccessfulmaidenflight(3
March2011)
March2011
AirbusS.A.S.2011
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Manufacture of a fuselage
22% A380
27
Sending structural
elements for final
assembly line (FAL)
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
28
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
29
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
30
31
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
32
The A350 XWB programme reached a new industrial milestone with the successful curing of this new-generation jetliners largest
composite fuselage panel, which was completed by Airbus partner Premium AEROTEC (18 March 2011). March 2011
Airbus S.A.S 2011
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
Due to strong market demand, Airbus will increase the production rate for its A330 Family of jetliners to ten aircraft per month (3 February 2011)
February 2011
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
33
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
34
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
35
Integration components
Fixings:
Riveted jjoints - Hilok
Ability to use nuts for torque
control
Manufacturing cost less than
other piping systems
Available in a wide range of sizes
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
load
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
36
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
37
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
38
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
1.
Lift truck
3
2.
Support beam
3.
Lifting gear and hook
4 and 5. Support rail / guide (front ends) and Motor translation bridge
6. Keypad / Remote
pp y box bridge
g
7. Supply
8 and 9. Carriage guide support beam connection
10. Supply cable support structure / control car
11. Cable car guide
12. Cable car supply
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
39
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
40
41
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
42
"
"
Aristteles (384 AC-322 AC);
Greek philosopher.
Questions
MasterGSC&AIO
GLOBALSUPPLYCHAIN&AERONAUTICALINDUSTRIALOPERATIONS
Module8:Engineering
43