60-F5222SJ010101

PROJECT NAME

DETAILED DESIGN STAGE


PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

DETAIL DESIGN DESCRIPTION AND VOLUME LIST

NORTHWEST ELECTRIC POWER DESIGN INSTITUTE


12/2011

XIAN

PROJECT

PHASE II 2X300MW PUTTALAM COAL POWER PROJECT


OWNER

CEYLON ELECTRICITY BOARD


POYRY ENERGY LTD
EPC CONTRACTOR

CHINA NATIONAL MACHINERY & EQUIPMENT


IMPORT & EXPORT CORPORATION
SUBCONTRACTOR

NORTHWEST ELECTRIC POWER


DESIGN INSTITUTE
Document No. :

Rev :

F5222S-J0101-01

Document Title :
DETAIL DESIGN DESCRIPTION AND VOLUME LIST
DOCUMENT STATUS

Date
12/2011
04/2012

Revision Designed by Checked by Reviewed by

Approved by

AP

TABLE OF CONTENTS

1.0 GENERAL .......................................................................................... 1


2.0 DESIGN BASIS .................................................................................. 1
3.0 BASIC TECHNICAL DATA ............................................................. 1
4.0 DESIGN CRITERION ....................................................................... 5
5.0 NWEPDI NUMBERING SYSTEM................................................... 9

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

1.0 General

The Puttalam Coal Power Plant is located near the village of Panaiyadi on the
Kalpitiya Peninsula, approximately 12 km west of the city of Puttalam. The Project is
a coal fired Power Station in stages with an ultimate planned capacity of 900 MW. The
scope of the phase II covers the installation of the first condensing turbo generator and
coal fired Units with a capacity of 2x300 MW, along with the associated power
transmission system, site infrastructure and auxiliary systems. The project also
includes coal supply facilities as well as coal storage and ash disposal.
2.0 Design basis
2.1 EPC contract between CMEC and CEB.
2.2 Basic design documentation confirmed by CEB
2.3 Technical agreement of main equipment and auxiliary equipment
3.0 Basic technical data
3.1 Fuelimported bituminous coal
Coal quality and ash content analysis
NAME
High calorific value as
received basis
Industrial analysis
Total moisture content as
received basis
Moisture content as air
dried basis
Ash content as received
basis
Volatile matter content as
received basis
Elementary analysis
Carbon
content
as
received basis
Hydrogen
content
as
received basis
Oxygen
content
as
received basis
Nitrogen
content
as
received basis
Sulphur
content
as
received basis
Grindability factor

DESIGN

CHECK

CHECK

COAL

COAL 1

COAL 2

MJ/kg

26.4

25.3

24.7

Mt

12.0

16.0

19.0

Mad

Aar

11.0

15.0

10.1

Var

27.0

25.0

24.9

Car

65.0

60.0

60.5

Har

3.8

3.6

3.4

Oar

6.2

3.0

5.1

Nar

1.5

1.7

1.4

Star

0.5

0.7

0.5

50

42

50

SYMBOL

UNIT

Qv.ar

HGI
1

6.0

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

NAME
Ash
deformation
temperature
Ash softening temperature
Ash melting temperature

DESIGN

CHECK

CHECK

COAL

COAL 1

COAL 2

1250
1325

1170
1300

1250
1325

%
%
%
%
%
%
%
%
%
%

61.0
25.0
4.0
3.5
0.6
1.3
0.3
0.7
2.7

58.0
21.6
8.0
5.0
0.8
1.3
1.2
0.5
2.7

61.0
25.0
4.0
3.5
0.6
1.3
0.3
0.7
2.7

SYMBOL

UNIT

DT

ST
FT

SiO2
AI2O3
Fe2O3
CaO
K2O
TiO2
Na2O
MgO
SO3
MnO2
Specific resistance of ash

1012

3.2 Ignition and combustion supporting oil


Type of oilLight diesel oil
Kinematic viscosity(37.8) : 1.5~5.0 centistokes
Ash content: 0.02%
Sulphur content: 1.0%
Flash point: >60
Calorific value: 10500 kcal/kg
3.3 Cooling water quality
Recycled water source: sea water
Open cycle cooling water: Recycled water
Closed cycle cooling water: Demineralized water
3.4 Ambient conditions
Average atmospheric temperature: 27.5
Highest atmospheric temperature: 34
Lowest atmospheric temperature: 21
Average relative humidity: 75%
Design atmospheric pressure: 100.57kpa
Average annual rainfall: 1200mm
Highest wind speed: 47.2m/s
Average wind speed:4.17m/s
Seismic intensity: Grade 7
Design seismic intensity: 7(MSK-64)
Average temperature of sea water: 28
2

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

Highest temperature of sea water: 31


Lowest temperature of sea water: 11.2
Design temperature of sea water: 31
3.5 Main equipment technical data
3.5.1 Boiler
Boiler supplied by HBC: subcritical parameter, natural circulation, all steel structural, balance
draft, dry slagging, hypaethral placement above operating floor, imported bituminous coal
fuel.
Boiler model: HG-1025/17.3-YM

300MW

BMCR

t/h

1025

Steam pressure (BMCR)

Mpa(g)

17.3

Steam temperature (BMCR)

541

Steam pressure (BMCR)

Mpa (g)

3.99/3.79

Thermal parameter
Superheated
steam

Reheated
steam

Steam temperature (BMCR)


Feed water temp.(BMCR

337.8/541
282.1

3.5.2 Turbine
Turbine supplied by HTC: subcritical parameter, two-cylinder and two drainages, medium
reheat, condensing turbine.
Turbine model: N300-16.7/538/538
Turbine main thermal parameter as follows:
CP: constant pressure
CP: constant pressure
HPB: high pressure heater broken
MS: main steam
RS: reheated steam
Temp.: temperature

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

TMCR
THA
Power output MW
Heat consumption
kJ/kW.h

TRL

50%

40%

30%

VWO

HPB
CP

SP

CP

SP

CP

SP

CP

SP

300

300

331.537

315.965

225

225

150

150

120

120

90

90

300

7898.1

8002.7

7879.6

7889.8

8050.6

7953.6

8442.1

8401.8

8753.7

8723.5

9154.3

9125.8

8172.2

16.7

13.49

16.7

9.8

16.7

7.85

16.7

5.85

16.7

2.488

2.435

1.698

1.678

1.4

1.384

1.09

1.08

3.48

MS pressure MPa(a)
RS pressure MPa(a)

75%

16.7
3.349

3.443

3.746

3.459

MS temperature

538

531.7

531.6

523.5

523.3

514

513.8

538

RS temperature

538

511.1

510.7

492.8

492.5

473.7

473.4

538

387.68

386.11

322.4

321.41

253.49

252.25

779.34

RS flow rate t/h

759.76

780.75

851.21

784.95

561.92

553.35

Back pressure kPa(a)

7.0

9.7

Exhaust flow rate t/h

583.17

598.02

645.54

600.49

444.67

437.76

317.36

314.38

268.24

265.34

214.84

211.56

618.74

Supply water rate %

3.8

Final feed water temp.

39.4

45.6

39.4

39.4

39.4

39.4

39.4

39.4

39.4

39.4

38.2

38.2

39.4

Generator power MW

300

300

331.537

315.965

225

225

150

150

120

120

90

90

300

7.0

6.55

6.55

7.0

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

3.5.3 Generator
Generator supplied by HEC.
Generator main technical parameter as follows:
Name

Unit

Design value

Generator model

Test value

Insure value

QFSN-300-2

Rated capacity SN

MVA

353

353

353

Rated power PN

MW

300

300

300

MAX output power Pmax

MW

332

332

332

0.85

0.85

Rated power factor cosN


Stator rated voltage UN

kV

20

20

Stator rated current IN

10190

10190

Rated frequency fN

Hz

50

50

r/min

3000

3000

Rated voltage for excitation UfN (90)

365

Rated current for excitation IfN

2642

Rated speed nN

Stator coil connection mode


Full load efficiency

2500

YY/Y
%

99.019

99.02

98.9

4.0 Design criterion


This project is an expansion project (phase II). Phase II covers two units with a capacity of 2x300MW. The
total capacity of phase I and phase II will be 3x300MW.

4.1 Brief introduction of power plant main building


4.1.1
Phase II is on the right extension side of phase I
a) Longitudinal arrangement of steam turbine generator. Turbine towards fixed side.
b) Boiler house is all steel structural, hypaethral placement above operating floor (12.6m)
c) Turbine house is concrete structural
d) Central control building between unit2 and unit 3
4.1.2 Turbine house platform
a) Feed water pump, OCCW pump, main oil tank, main oil cooler, CCCW heat exchange
device, vacuum pumps etc. are on the ground floor (0m).
b) Ground floor (0m), middle floor (6.3m), operating floor (12.6m) in turbine house
c) Steam turbine generator on the operating floor.
4.1.3 Deaerator building (RC frame)
a) CCCW pump, condensate polishing unit on 0m floor of deaerator building
5

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

b) No.3 HP heater, No.6 LP heater, pipe drain flash tank etc. on 6.3m floor of deaerator
building.
c) No.1 no.2 HP heater, No.5 LP heater on 12.6m floor of deaerator building.
d) Deaerator, CCCW tank, continuous blowdown flash tank etc. on 22.5m floor of deaerator
building.
4.1.4 Bunker bay
a) Coal mill on 0m floor
b) Coal feeder on 12.6m floor
c) Coal conveyor belt on 37.8m floor
4.1.5 Boiler house
a) Hypaethral placement above operating floor (12.6m)
b) Concrete structure on operating floor (12.6m)
c) Primary air fan, seal air fan, slag conveyor, IBD tank etc. on 0m floor of boiler house.
d) Forced draft fan, precipitator, induced draft fan, chimney on end part of boiler house.
4.2 Combustion system, pulverizing system and auxiliary equipments
4.2.1 Coal consumption
Coal consumption is calculated on the basis of BMCR condition, design coal, 20 hours/day,
6000 hours/year.
Capacity
One unit
Name
Per hour coal consumptiont/h

110.4

Per day coal consumption t/d

2208

Per year coal consumptionkt/a

662.4

4.2.2 Pulverizing system and auxiliary equipments


a) Five coal mill on site per unit, one of them standby.
b) coal feeder seal air fan etc. auxiliary equipment assorted.
Coal mill

Coal feeder

Manufacturer
Model

HP863

CS67194.2024HP

Quantity/per boiler

Power outputT/h

Basic output47.1

660

Output beyond wear life35.5


Motor speedr.p.m

982

Motor power

kW

400

Motor voltage

6000

380

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

4.2.3 air-flue gas system and auxiliary equipments


a) Balance draft
b) Junkers air preheater
c) Primary air system, secondary air system, air-flue gas system
4.2.3.1 Primary air system
a) Supply hot air and pressured cold air for coal mill.
b) Two 50% capacity primary air fan per unit
4.2.3.2 Secondary air system
a) Supply air for combustion
b) Two 50% capacity forced draft fan per unit
4.2.3.3 Air-flue gas system
a) Flue gas firstly flow out of boiler end heating surface, then air preheater, precipitator,
FGD, finally flow out of chimney into air.
4.2.3.4 Auxiliary equipments
a) Primary air fan: 2/per boiler
b) Forced draft fan: 2/per boiler
c) Induced draft fan: 2/per boiler
d) Air preheater: 2/per boiler
e) Precipitator: 2/per boiler
4.2.4 Ignition oil system
a) Two stage ignition system
b) Light diesel oil
c) Mechanical atomizing burner
4.3 Thermal system and auxiliary equipments
4.3.1 Main reheat & bypass steam system
Please see drawing F5222S-J0801-01 for system detail
4.3.2 Extraction steam system
The turbine has eight (8) pressure stages of non-regulating extraction steam. The No.1,2&3
extraction steam stages supply steam to three (3) HP heaters respectively. The No.4 extraction
steam stage supply steam to auxiliary steam header and deaerator. The No.5,6,7&8 extraction
steam stages supply steam to four (4) LP heaters respectively.
4.3.3 Auxiliary steam system
The Auxiliary Steam System (AS) is designed to provide steam for the following services
under various operating load condition of the thermal power plant.
a) Steam for deaerator preheating, load rejection and cutting off
b) Back-UP steam for turbine seal system
c) Steam for air preheater soot blowers
d) Steam for coal mill fire fighting
e) Steam for boiler heating
f) Steam for boiler system (standby connection)
4.3.4 Feed water system
The function of the boiler feed-water system is to deliver feed-water from the outlet of
deaerator feed-water tank to the inlet of boiler economizer inlet header. In the process of
handling the feed-water is heated by the extraction steam from the steam turbine to improve
7

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

the cycle efficiency.


The system also supplies the feed-water to the boiler super heater, attemperator to moderate
the superheated steam temperature. Besides, feed-water tapped from the feed-water pump
intermediate stage is sent to the two sides of attemperator before the steam repeaters to protect
the reheater from overheat.
The feed-water system also supplies feed-water to turbine HP. By-pass system, acting as
attemperator water to reduce the main steam temperature.
4.3.5 Condensate water system
The main function of the system is that pumping the condensate from hot well to the deaerator,
controlling, heating, deaerating of the condensate and taking other necessary actions in
delivering in order to ensure the safe and operation, increase the efficiency of heat circulation.
Two condensate pumps (one operation and one standby) each with 100% capacity, 3 LP
heaters and one gland seal condenser are equipped in the system. There are several of
desuperheater spray and miscellaneous water upstream of gland seal condenser. The control
valve controlling the water level of deaerator, recirculating piping of min. condensate flow are
equipped downstream of the gland steam condenser. In addition there is a control valve
controlling the make-up water entering into the hot well, one condensate storage tank and one
condensate transfer pump completed in the system to guarantee the operation water level in
the condenser.
4.3.6 HP heater drain & vent system
Please see drawing F5222S-J1301-01 for detail
4.3.7 LP heater drain & vent system
Please see drawing F5222S-J1305-01 for detail
4.3.8 Cooling water system
Please see drawing F5222S-J1801-01, J1901-01, and J2001-01 for detail.
4.3.9 Condenser vacuum system
Please see drawing F5222S-J1501-01 for detail.
4.3.10 Turbine lube oil conditioning & storage system
Please see drawing F5222S-J2101-01 for detail.
4.3.11 Boiler drain & blowdown system
Please see drawing F5222S-J0601-01 for detail

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

5.0 NWEPDI numbering system


5.1 General regulation:
60 - F

522 2 s X

XX

XX -XX

SUB-BOOK (DRAWING) CODE


BOOK CODE
VOLUME CODE
DEPARTMENT CODE
DESIGN STAGE
PROJECT STAGE
PROJECT CODE
PROJECT SORT
REPRESENT NWEPDI

For this project:


Project Sort is F which means power generation
Project Code is 522
Project Stage is 2
Design Stage: S represents engineering design
Department Code: J represents Mechanical Department
D represents Electrical Department
H represents Chemical Department
K represents I&C Department
T represents Civil & Architecture Department
S represents Water Supply & Hydraulic Structure Department
N represents HVAC Department
Z represents General layout Department
C represents Ash Handling Department
M represents Coal Handling Department

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

5.2 Volume list


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Volume no.
F5222S-J0101
F5222S-J0102
F5222S-J0103
F5222S-J0106
F5222S-J0201
F5222S-J0301
F5222S-J0302
F5222S-J0303
F5222S-J0304
F5222S-J0305
F5222S-J0306
F5222S-J0401
F5222S-J0404
F5222S-J0501
F5222S-J0502
F5222S-J0503
F5222S-J0504
F5222S-J0505
F5222S-J0506
F5222S-J0507
F5222S-J0508
F5222S-J0601
F5222S-J0602
F5222S-J0603
F5222S-J0604

Name of volume
Mechanical part
DETAIL DESIGN DESCRIPTION AND VOLUME LIST
EQUIPMENT LIST
MATERIAL LIST
KKS CODE DESCRIPTION & EQUIPMENT LIST FOR THERMO-MECHANICAL PART
GENERAL ARRANGEMENT OF MAIN HOUSE
ERECTION DRAWING OF AUX.EQUIPMENT IN TURBINE HOUSE
ERECTION DRAWING OF AUX.EQUIPMENT IN BOILER HOUSE
ERECTION DRAWING OF PLATFORM & LADDER IN TURBINE HOUSE
ERECTION DRAWING OF PLATFORM AND LADDER FOR IN BOILER HOUSE
ERECTION DRAWING OF MAINTENANCE & HOISTING FACILITY IN TURBINE HOUSE
ERECTION DRAWING OF MAINTENANCE & HOISTING FACILITY IN BOILER HOUSE
P&ID COAL PULVERIZING SYSTEM
ERECTION DRAWING OF PULVERIZED COAL PIPE
P&ID AIR AND FLUE GAS SYSTEM
ERECTION DRAWING OF COLD PRIMARY AIR DUCT
ERECTION DRAWING OF HOT PRIMARY AIR DUCT
ERECTION DRAWING OF SECONDARY COLD AIR DUCT
ERCTION DRAWING OF BOILER SECOND HOT AIR DUCT
ERECTION DRAWING OF SEAL AIR DUCT OF COAL MILL AND COAL FEEDER
ERECTION DRAWING OF FLAME DETECTOR COOLING AIR DUCT
ERECTION DRAWING OF FLUE DUCT
P&ID BOILER DRAIN AND BLOWDOWN SYSTEM
ERECTION DRAWING OF BOILER DRAIN AND VENT PIPE
ERECTION DRAWING OF BOILER EMERGENCY DRAIN WATER PIPE
ERECTION DRAWING OF BOILER BLOWDOWN PIPE
10

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

F5222S-J0607
F5222S-J0608
F5222S-J0801
F5222S-J0802
F5222S-J0803
F5222S-J0804
F5222S-J0805
F5222S-J0806
F5222S-J0808
F5222S-J0809
F5222S-J0901
F5222S-J0902
F5222S-J0903
F5222S-J0904
F5222S-J0905
F5222S-J0906
F5222S-J0907
F5222S-J1001
F5222S-J1002
F5222S-J1003
F5222S-J1004
F5222S-J1005
F5222S-J1008
F5222S-J1101
F5222S-J1102
F5222S-J1103
F5222S-J1104
F5222S-J1105
F5222S-J1106

ERECTION DRAWING OF PIPE RELATE TO CONTINUOUS BLOWDOWN FLASH TANK


ERECTION DRAWING OF INTERMITTENT BLOWDOWN TANK PIPE
P&ID MAIN REHEAT&BYPASS STEAM SYSTEM
ERECTION DRAWING OF MAIN STEAM PIPE
ERECTION DRAWING OF HOT REHEAT STEAM PIPE
ERECTION DRAWING OF COLD REHEAT STEAM PIPE
ERECTION DRAWING OFHP BYPASS STEAM PIPE
ERECTION DRAWING OF LP BYPASS STEAM PIPE
ERECTION DRAWING OF STEAM SUPPLY PIPE FROM MAIN STEAM & COLD REHEAT PIPE TO GLAND SEAL
ERECTION DRAWING OF HP CASING COOLING STEAM PIPE
P&ID EXTRACTION STEAM SYSTEM
ERECTION DRAWING OF NO.1 EXTRACTION STEAM PIPE
ERECTION DRAWING OF NO.2 EXTRACTION STEAM PIPE
ERECTION DRAWING OF NO.3 EXTRACTION STEAM PIPE
ERECTION DRAWING OF NO.4 EXTRACTION STEAM PIPE
ERECTION DRAWING OF NO.5 EXTRACTION STEAM PIPE
ERECTION DRAWING OF NO.6 EXTRACTION STEAM PIPE
P&ID AUXILIARY STEAM SYSTEM
ERECTION DRAWING OF AUXILIARY STEAM PIPE
ERECTION DRAWING OF THE AUXILIARY STEAM INNER STEAM SOURCE PIPE
ERECTION DRAWING OF AUX. STEAM IN TURBINE HOUSE
ERECTION DRAWING OF AUXILIARY STEAM PIPE FOR BOILER HOUSE
ERECTION DRAWING OF THE AUXILARY DRAINS AND VENT PIPE
P&ID FEED WATER SYSTEM
ERECTION DRAWING OF LP FEED WATER PIPE
ERECTION DRAWING OF IP FEED WATER PIPE
ERECTION DRAWING OF HP FEED WATER PIPE
ERECTION DRAWING OF FEED WATER RECYCLE PIPE
ERECTION DRAWING OF FEED WATER ATTEMPERATING WATER PIPE
11

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

F5222S-J1107
F5222S-J1201
F5222S-J1202
F5222S-J1205
F5222S-J1206
F5222S-J1207
F5222S-J1208
F5222S-J1209
F5222S-J1301
F5222S-J1302
F5222S-J1303
F5222S-J1304
F5222S-J1305
F5222S-J1306
F5222S-J1307
F5222S-J1308
F5222S-J1401
F5222S-J1402
F5222S-J1403
F5222S-J1404
F5222S-J1405
F5222S-J1406
F5222S-J1501
F5222S-J1502
F5222S-J1503
F5222S-J1505
F5222S-J1801
F5222S-J1802
F5222S-J1803

ERECTION DRAWING OF FEED WATER MISCELLANEOUS PIPE


P&ID CONDENSATE SYSTEM
ERECTION DRAWINGS OF CONDENSATE PIPE
ERECTION DRAWING OF PIPE RELATED TO CONDENSATE STORAGE TANK
ERECTION DRAWINGS OF DEAERATOR FILL & BOILER FILL PIPE
ERECTION DRAWING OF CONDENSATE DESUPERHEATING PIPE
ERECTION DRAWING OF CONDENSATE DISCHARGE WATER PIPE
ERECTION DRAWINGS OF CONDENSATE MISCELLANEOUS WATER PIPE
P&ID HP HEATER DRAINS & VENTS SYSTEM
ERECTION DRAWING OF HP HEATER DRAIN PIPE
ERECTION DRAWING OF DEAERATOR DRAIN & OVERFLOW PIPE
ERECTION DRAWING OF HP HEATER&DEAERATOR VENT PIPE
P&ID LP HEATER DRAINS & VENTS SYSTEM
ERECTION DRAWING OF LP HEATER DRAIN PIPE
ERECTION DRAWING OF LP HEATER VENT PIPE
ERECTION DRAWINGS OF HIGH & NON-PRESSURE DISCHARGE WATER PIPE
P&ID OF TURBINE GLAND STEAM SYSTEM
ERECTION DRAWINGS OF TURBINE MAIN BODY DRAIN PIPE
ERECTION DRAWINGS OF TURBINE SEALS GLAND-SUPPLY STEAM PIPE
ERECTION DRAWINGS OF TURBINE SEALS AND VALVE LEAK-OFF PIPE
ERECTION DRAWING OF THE GLAND STEAM CONDENSER DRAIN AND VENT PIPE
ERECTION DRAWING OF PIPE RELATED TO TURBINE START UP
P&ID AIR EVACUATION SYSTEM
ERECTION DRAWING OF CONDENSER VACUUM PIPES
ERECTION DRAWING OF CONDENSER WATER BOX VACUUM PIPES
ERECTION DRAWING OF CONDENSER DRAIN FLASH TANK RELATED PIPE
P&ID CIRCULATING WATER SYSTEM
ERECTION DRAWING OF CIRCULATING WATER PIPE
ERECTION DRAWING OF CONDENSER BALL CLEANING PIPE
12

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112

F5222S-J1901
F5222S-J1903
F5222S-J2001
F5222S-J2002
F5222S-J2003
F5222S-J2101
F5222S-J2102
F5222S-J2103
F5222S-J2104
F5222S-J2105
F5222S-J2201
F5222S-J2202
F5222S-J2203
F5222S-J2204
F5222S-J2205
F5222S-J2301
F5222S-J2302
F5222S-J2303
F5222S-J2304
F5222S-J2305
F5222S-J2401
F5222S-J2501
F5222S-J2607
F5222S-J2608
F5222S-J2609
F5222S-J2612
F5222S-J2801
F5222S-J2802
F5222S-J2901

P&ID OCCW SYSTEM


ERECTION DRAWING OF OCCW PIPE IN TURBINE HOUSE
P&ID CLOSED COOLING WATER SYSTEM
ERECTION DRAWING OF CLOSED CIRCULATING COOLING WATER PIPE IN BOILER HOUSE
ERECTION DRAWING OF CCCW PIPE IN TURBINE HOUSE
ERECTION DRAWING OF P&ID TURBINE LUBE OIL CONDITIONING &STORAGE SYSTEM
ERECTION DRAWING OF LUBE OIL CONDITIONING PIPE
ERECTION DRAWING OFLUBE OIL STORAGE TANK PIPE
ERECTION DRAWING OF LUBE OIL TANK EXHAUST PIPE
ERECTION DRAWING OF LUBE OIL TANK EMERGENCY OIL DISCHARGE PIPE
ERECTION DRAWING OF TURBINE LUBE OIL PIPE
ERECTION DRAWING OF GENERATOR LUBE & SEAL OIL PIPE
ERECTION DRAWING OF GENERATOR H &CO2 PIPES
ERECTION DRAWING OF GENERATOR STATOR COOLING WATER PIPE
ERECTION DRAWING OF GENERATOR COOLING AIR DUCT
P&ID COMPRESSED AIR SYSTEM
ERECTION DRAWING OF INSTRUMENT COMPRESSED AIR PIPE
ERECTION DRAWING OF SERVICE COMPRESSED AIR PIPE
ERECTION DRAWING OF AIR COMPRESSOR ROOM EQUIPMENT AND PIPE
ERECTION DRAWING OF COMPRESSED AIR PIPES IN PLANT AERA
ERECTION DRAWING OF AIR PREHEATER WASHING WATER PIPES
FLOW DIAGRAM OF NITROGEN SYSTEM
ERECTION DRAWING OF FUEL OIL AND COMPRESSED AIR PIPES IN PLANT AERA
BOILER IGNTTING OIL SYSTEM FLOW DIAGRAM
ERECTION DRAWING OF BOILER IGNITING OIL PIPE
LAYOUT OF EQUIPMENT AND PIPE MGO FOR JETTY
ERECTION DESCRIPTION OF INSULATION AND MATERIAL LIST
ERECTION DESCRIPTION AND STRUCTURE DRAWING OF INSULATION
G.A DRAWING OF DIESEL GENERATOR ROOM
13

PHASE II 2x300MW PUTTALAM COAL POWER PROJECT

113

F5222S-J3201

WORKING DRAWING OF CASE

14