Sunteți pe pagina 1din 17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

FPC-manual
This FPC manual contains a description of our company's FPC
system. The FPC system has been built in accordance with the
standard BS EN 1090-1.

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 1/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

FPC-Manual

XXXX Ltd.
The address of the production facility
BS EN 1090-1+A1
Version 1.0

_________________________________________________
xxx xxx, managing director

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 2/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

Content
1. Introduction.................................................................4

1.1. Scope..............................................................................4
1.2. Product families..............................................................5

2. Structure of FPC system...............................................6


2.1.
2.2.
2.3.
2.4.
2.5.

Structure of documentation.............................................6
Document management...................................................7
Managerial audits............................................................8
Conformity to relevant standards.....................................9
Standards in the FPC system............................................9

3. Resource management...............................................10

3.1. Human resources...........................................................10


3.2. Machines and testing equipment....................................11

4. Manufacture of structural steel products.....................13


4.1.
4.2.
4.3.
4.4.
4.5.
4.6.

Specification of requirements.........................................13
Structural design process...............................................13
Purchasing....................................................................13
Verification of a purchased product................................13
Product planning and execution.....................................14
Initial type testing and calculation, and testing as a part of FPC
15
4.7. CE marking and preparation of declaration of performance16
4.8. Handling and storage.....................................................16

5. Welding FPC...............................................................17
5.1.
5.2.
5.3.
5.4.
5.5.
5.6.

Welding personnel.........................................................18
Reviews........................................................................18
Welding procedure specifications...................................19
Welding plan.................................................................20
Subcontracting..............................................................20
Inspection and testing...................................................20

6. Measuring, analysis and improvement.........................21

6.1. Non-conforming products...............................................21


6.2. Traceability and marking................................................22

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 3/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

1.Introduction
We maintain a factory production control (FPC) system to ensure
that all structural steel products released in the market meet the
required quality standards and conform to the declaration of
performance delivered with the steel product.
The person responsible for the maintenance of our FPC system is
[FIRST NAME] [SURNAME] and s/he is responsible for it in terms
of:

Documentation,
Maintenance and
Continuous verification of functionality.

In addition to this, [FIRST NAME] is responsible for ensuring that


all employees who are involved with manufacturing of structural
steel products understand their individual responsibilities and
duties and that the subcontractors meet our quality standards.
Internal communication in terms of responsibilities, authorizations
and changes related to the FPC system takes place in meetings, via
e-mail and via personal communication.

1.1.

Scope

Our FPC system encompasses the manufacture of structural steel


products only and it has been prepared so that it conforms to the
relevant requirements of standards BS EN 1090-1 and BS EN 10902 and includes a non-certified quality management system for
fusion welding (BS EN ISO 3834-3).
Production is done in-house and subcontracted. Tasks are divided
according to the Table below:
Table 1. In-house and subcontracted production
Inhouse

Subcontrac
ted

Notes

Structural
design
Cutting
Shaping
Holing
Mechanical
fastening
Assembly
Welding
Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 4/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

Surface
treatment

In addition to structural steel products, we manufacture


other steel products, but the manufacturing of these
products is not included in this FPC system.

1.2.

Product families

Structural steel products are manufactured in series or bespoke


production with constituent materials and working methods
compliant with standard BS EN 1090-2.
All structural steel products have been divided into product families
according to the parent material and welding process:
Product family 1
EXAMPLE. Structural steel products manufactured according
to the requirements of EXC2 with welding process 135.
Constituent products are according to BS EN 1090-2 and with
same or lower yield strength and better weldability as S355.

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 5/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

2.Structure of FPC system


This FPC manual contains the descriptions of inspections and
assessments that we apply to

Structural steel products manufactured by us,


Intermediate products of steel products,
Constituent products used in production,
Inspection and testing equipment.

With the help of the written procedure descriptions and working


instructions, it is possible to demonstrate to relevant stakeholders
that our steel products are manufactured under controlled
conditions, and our testing and measuring equipment have been
subjected to appropriate maintenance and inspection.
In addition, our FPC system documentation contains descriptions of
actions and procedures for handling products that are not
compliant with the requirements.
To ensure proper functioning of our FPC system, we continuously
update our documentation and retain quality records for ten (10)
years after their creation.

1 Structure of documentation
FPCman
ual
Execution
documentation and
working instructions
Quality records

Figure 1. The documentation hierarchy of the FPC system


The FPC manual, meaning this document, provides a general
description of our FPC system and its scope.
Execution documentation contains written instructions related to
and descriptions of, for example, the control of raw materials,
production machines and the manufacture of products. The
execution documentation also includes the most relevant standards
used in manufacture.

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 6/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

Quality records contain the objective documentation and proof of


product conformity. These documents include, for example,
component specifications, test results and complaints.

2.1.

Document management

Documents belonging to the FPC system are stored in a secure


place that can only be accessed by people authorized by us.
All amendments in the FPC system documentation have been
prepared by our FPC responsible or by a person authorized by
him/her. Whoever revises the FPC documentation is also
responsible for the

Verification of the new information,


Communication of the change to other employees and,
Organizing training.

For all documents in the FPC system, we try to use a ready-made


document form Document template which makes it easy to
identify the files as belonging to the FPC system.
Our FPC system also includes documents that have not been
prepared in a ready-made document form like essential standards.
Updated documents and quality documentation
There are two kinds of documents in our FPC system: updated
documents and quality documentation.
Updated documents are guiding documents that exist already at
the beginning of the work. The updated documents include
guidelines, process descriptions, internal policies etc. The updated
documents are updated where necessary and they come with a
consecutive version number that identifies the amendments.
Quality documentation refers to the documents, which are
prepared as the work proceeds. Quality documentation contains
test reports etc. In addition to these, quality documentation also
includes the employees' qualification certificates, material
certificates, inspection slips and other quality documentation.
Naming of documents
Where possible, the naming of the documents follows a general
naming policy so that each file contains the plain text name,
identification code, date, and a version number.

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 7/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

The documents in the FPC system follow the naming and


numbering system as follows:

Figure 2. FPC system documentation

2.2.

Managerial audits

Once a year, our companys management team performs an


internal audit on the FPC system to ensure that the system is
suitable and functional.
The managerial audit includes the assessment of the following
aspects where applicable:

Findings from previous managerial audits


External audit reports
Flaws and defects detected internally and from customer feedback
Implementation and effects of corrective actions
Surveillance of suppliers
Sufficiency of the production process surveillance
Sufficiency of resources
Effectiveness and sufficiency of preventive actions
Overall assessment of the effectiveness and suitability of the FPC
system for the requirements of the quality policy and quality goals
given the potentially changed customer needs

Based on the managerial audits, a separate document


Managerial audit is prepared and saved as a part of quality
documentation.
Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 8/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 9/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

2.3.

BS EN 1090-1

Conformity to relevant standards

The conformity of the standard BS EN 1090-1 to our FPC is


presented in the table below:
Table 2. FPC and BS EN 1090-1.
BS EN 1090-1+A1
Personnel
Equipment
Products used in manufacture
Assembly specification
Product evaluation
Non-conforming products

FPCmanual
3.1
3.2
4.3
4.1
4.6
6.1

Docume
nt
P
M
W
W
D
W, D

2.4.
2.4.
2.4.
2.4.
2.4.
2.4.

Standards in the FPC system


The following standards related to the manufacturing of structural
steel products are part of the FPC system.
Table 3. Standards we own
Standard
code
BS EN 1090-1

Description / contents

Execution of steel and aluminium


structures. Part 1: Requirements for
conformity assessment of structural
components.
BS EN 1090-2
Execution of steel and aluminium
structures.Part
2:
technical
requirements for steel structures.
ISO 3834-3
Part 3. Quality requirements for fusion
welding of metallic materials
EN 14731
Welding
coordination.
Tasks
and
responsibilities
EN 1011-1, -2, Welding.
Recommendations
for
-3
welding of metallic materials
These standards are available to all employees to read and the
company management is responsible for the accessibility and
validity of the standards.

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 10/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

3.Resource management
3.1.

Human resources

Deleted text

3.2.

Machines and testing equipment

Deleted text

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 11/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

4.Manufacture of structural steel products


4.1.

Specification of requirements

Deleted text

4.2.

Structural design process

Deleted text

4.3.

Purchasing

Deleted text

4.4.

Verification of a purchased product

Deleted text

4.5.

Product planning and execution

Deleted text

4.6.
Initial type testing and calculation, and testing as
a part of FPC
Deleted text

4.7.
CE marking and preparation of declaration of
performance
Deleted text

4.8.

Handling and storage

Deleted text

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 12/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

5.Welding FPC
Deleted text

5.1.

Welding personnel

Deleted text

5.2.

Reviews

Deleted text

5.3.

Welding procedure specifications

Deleted text

5.4.

Welding plan

Deleted text

5.5.

Subcontracting

Deleted text

5.6.

Inspection and testing

Deleted text

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 13/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

6.Measuring, analysis and improvement


Deleted text

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 14/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

Version history
DATE

Reason for update

XX

Implementation of FPC [Name]


system

Version 1.0

Approved
by

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Requires
training
Yes

Page 15/17

FPC manual

GET FULL VERSION AT


HTTP://CEWIZARD.EU

FPC
documentation
instructions)
Type
Quality
documen
ts

Document id
Final Inspection
Inspection report
for welds
Structural design
review
Approved WPS
CEmark

Checklist
Complaint form
Document
template
DoP
DoP-Flowchart
Humidity and air
temperature
Internal training

ITT&ITC
Maintenance
records
Managerial audit
Parameter control
Procedure test
Holing
Procedure test
Thermal cutting

Control
of

Training
document
Visual NDT
Personnel
qualifications and

Version 1.0

BS EN 1090-1

(no

What is it used for?


Collect and record the inspections related to the
manufacturing
process.
Very
important
document.
Record the visual NDT of welds. Very important
document.
Verify that structural design has been performed
appropriately. Very important document.
Approval process for the new WPSs used in
production.
Blank template for CE mark. Use this to develop
CE mark for each new structural steel product.
Double check to make sure you have done
everything to back up your CE mark. This is
especially beneficial as a double check when
you're still learning how to use the FPC system.
Record all complaints from customers and major
internal complaints.
Blank document to make new FPC files
Blank template for Declaration of performance
Flowchart to help you determine the appropriate
Method to use when preparing the CE mark
and DoP
Record the storage conditions of welding
consumables and wet painting if you do it.
Record trainings that you organize for your
employees that relate to the FPC system
Record the Initial type testing and initial type
calculation where you assess your manufacturing
and design processes and make sure they
conform to the requirements of EN 1090-1.
Record the maintenance of your manufacturing
machinery
Record the managerial audit where you check
that the FPC system is functional
Control the appropriate use of WPSs during the
manufacturing
Approval of your holing processes and methods
Approval of your thermal cutting processes and
methods
Record the training where you teach your new
(or old) employee everything they need to know
about their new job.
Qualify your visual weld inspectors
Listing of employees and subcontractors. Define
tasks and responsibilities for employees.
GET FULL VERSION AT
HTTP://CEWIZARD.EU

Page 16/17

working

FPC manual

resource
s

organization
Qualification
requirements
Machinery and
testing equipment
Use and
maintenance of
measuring
equipment

Version 1.0

GET FULL VERSION AT


HTTP://CEWIZARD.EU

BS EN 1090-1

Listing of all minimum qualification requirements


from the standards
Listing of all manufacturing machinery and
testing equipment
Instructions for use and calibration of common
measuring equipment

GET FULL VERSION AT


HTTP://CEWIZARD.EU

Page 17/17

S-ar putea să vă placă și