Documente Academic
Documente Profesional
Documente Cultură
BS EN 1090-1
FPC-manual
This FPC manual contains a description of our company's FPC
system. The FPC system has been built in accordance with the
standard BS EN 1090-1.
Version 1.0
Page 1/17
FPC manual
BS EN 1090-1
FPC-Manual
XXXX Ltd.
The address of the production facility
BS EN 1090-1+A1
Version 1.0
_________________________________________________
xxx xxx, managing director
Version 1.0
Page 2/17
FPC manual
BS EN 1090-1
Content
1. Introduction.................................................................4
1.1. Scope..............................................................................4
1.2. Product families..............................................................5
Structure of documentation.............................................6
Document management...................................................7
Managerial audits............................................................8
Conformity to relevant standards.....................................9
Standards in the FPC system............................................9
3. Resource management...............................................10
Specification of requirements.........................................13
Structural design process...............................................13
Purchasing....................................................................13
Verification of a purchased product................................13
Product planning and execution.....................................14
Initial type testing and calculation, and testing as a part of FPC
15
4.7. CE marking and preparation of declaration of performance16
4.8. Handling and storage.....................................................16
5. Welding FPC...............................................................17
5.1.
5.2.
5.3.
5.4.
5.5.
5.6.
Welding personnel.........................................................18
Reviews........................................................................18
Welding procedure specifications...................................19
Welding plan.................................................................20
Subcontracting..............................................................20
Inspection and testing...................................................20
Version 1.0
Page 3/17
FPC manual
BS EN 1090-1
1.Introduction
We maintain a factory production control (FPC) system to ensure
that all structural steel products released in the market meet the
required quality standards and conform to the declaration of
performance delivered with the steel product.
The person responsible for the maintenance of our FPC system is
[FIRST NAME] [SURNAME] and s/he is responsible for it in terms
of:
Documentation,
Maintenance and
Continuous verification of functionality.
1.1.
Scope
Subcontrac
ted
Notes
Structural
design
Cutting
Shaping
Holing
Mechanical
fastening
Assembly
Welding
Version 1.0
Page 4/17
FPC manual
BS EN 1090-1
Surface
treatment
1.2.
Product families
Version 1.0
Page 5/17
FPC manual
BS EN 1090-1
1 Structure of documentation
FPCman
ual
Execution
documentation and
working instructions
Quality records
Version 1.0
Page 6/17
FPC manual
BS EN 1090-1
2.1.
Document management
Version 1.0
Page 7/17
FPC manual
BS EN 1090-1
2.2.
Managerial audits
Page 8/17
FPC manual
BS EN 1090-1
Version 1.0
Page 9/17
FPC manual
2.3.
BS EN 1090-1
FPCmanual
3.1
3.2
4.3
4.1
4.6
6.1
Docume
nt
P
M
W
W
D
W, D
2.4.
2.4.
2.4.
2.4.
2.4.
2.4.
Description / contents
Version 1.0
Page 10/17
FPC manual
BS EN 1090-1
3.Resource management
3.1.
Human resources
Deleted text
3.2.
Deleted text
Version 1.0
Page 11/17
FPC manual
BS EN 1090-1
Specification of requirements
Deleted text
4.2.
Deleted text
4.3.
Purchasing
Deleted text
4.4.
Deleted text
4.5.
Deleted text
4.6.
Initial type testing and calculation, and testing as
a part of FPC
Deleted text
4.7.
CE marking and preparation of declaration of
performance
Deleted text
4.8.
Deleted text
Version 1.0
Page 12/17
FPC manual
BS EN 1090-1
5.Welding FPC
Deleted text
5.1.
Welding personnel
Deleted text
5.2.
Reviews
Deleted text
5.3.
Deleted text
5.4.
Welding plan
Deleted text
5.5.
Subcontracting
Deleted text
5.6.
Deleted text
Version 1.0
Page 13/17
FPC manual
BS EN 1090-1
Version 1.0
Page 14/17
FPC manual
BS EN 1090-1
Version history
DATE
XX
Version 1.0
Approved
by
Requires
training
Yes
Page 15/17
FPC manual
FPC
documentation
instructions)
Type
Quality
documen
ts
Document id
Final Inspection
Inspection report
for welds
Structural design
review
Approved WPS
CEmark
Checklist
Complaint form
Document
template
DoP
DoP-Flowchart
Humidity and air
temperature
Internal training
ITT&ITC
Maintenance
records
Managerial audit
Parameter control
Procedure test
Holing
Procedure test
Thermal cutting
Control
of
Training
document
Visual NDT
Personnel
qualifications and
Version 1.0
BS EN 1090-1
(no
Page 16/17
working
FPC manual
resource
s
organization
Qualification
requirements
Machinery and
testing equipment
Use and
maintenance of
measuring
equipment
Version 1.0
BS EN 1090-1
Page 17/17