Project
LINDE ENGINEERING
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
Page 2 of 16
10.02.09
SK
EO
AG
IFR
10.12.08
SK
EO
AG
IFR
31.07.08
SB
EO
AG
ICC
15.07.08
KC
EO
AG
RFC
25.06.08
KC
EO
AG
ICC
10.06.08
FB
EO
AG
ICC
10.06.08
FB
EO
AG
IFR
09.06.08
FB
EO
AG
IIR
Date
Description
GAMA
Rev.
No.
Project
Rev
No.
Status
Document Title:
LINDE ENGINEERING AG
Document No.
Contractor
GAM
ITP
QAC
GTL
030
Org.
Code
Doc.
Type
Disc.
Code
Geogr.
Area
Seq.
No
Rev.
No
LOC470
Vendor Code
Rev No: D
Document No : GAM-ITP-QAC-GTL-030
Rev / Date
1.0
1.1
1.2
R: DOCUMENT REVIEW
Activity
Characteristic to be
Verified
C : COMPANY
S: SURVEILLANCE
Control Procedure
Reference
Acceptance Criteria
V : VENDOR
H: HOLD POINT. W:
Responsible
Party
WITNESS
Verifying Documents
Applicable to ASU
Pearl GTL
Applicable to ASU
Pearl GTL
1.3
2.0
2.1
Torque Wrench
2.2
X : CONTRACTOR QC
: Rev-H / 10.02.2009
T-4.234.087
Approved RFC
Approved Documents
I
T-4.234.087
Manufacturers
recommendation
Training by Vendor /
Manufacturer
Manufacturer
Certificate
Torque Value
Achieved
T-4.250.955
1 Month
Calibration Certificate
Validation Sticker
T-4.234.548
1 Month
QA/QC
Engineer
Calibration Certificate
Visual Damage
QC Inspector
GAM-QCR-QAC-GTL-079
Previous Experience
Site Engineer
Approved Documents
2.3
3.0
MATERIAL
3.1
As per Company
Specification
3.2
As per Manufacture
recommendation
3.3
4.0
T-4.234.577 Rev. D
DELETED
Manufactures
Data Sheets
As per Manufacturer
Manufactures
recommendation
Data
Sheets
DELETED
Store In
charge
As per specification
Page 4
Document No : GAM-ITP-QAC-GTL-030
Rev / Date
X : CONTRACTOR QC
R: DOCUMENT REVIEW
Activity
Characteristic to be
Verified
4.1
Elevation, Orientation
& Width
4.2
Bedding Granules
level
4.2.1
4.3
Internal Cleaning
As per Manufacturer
recommendations
C : COMPANY
S: SURVEILLANCE
Control Procedure
Reference
Acceptance Criteria
Survey Report
: Rev-H / 10.02.2009
V : VENDOR
H: HOLD POINT. W:
Responsible Party
WITNESS
S
Site Engineer
GAM-QCR-QAC-GTL-139
Site Engineer
GAM-QCR- QAC-GTL045
QA/QC
Engineer
QA/QC
Engineer
Verifying Documents
b)
T-4.234.577 Rev. D
Page 5
Document No : GAM-ITP-QAC-GTL-030
Rev / Date
X : CONTRACTOR QC
R: DOCUMENT REVIEW
Activity
Characteristic to be
Verified
C : COMPANY
S: SURVEILLANCE
Control Procedure
Reference
V : VENDOR
H: HOLD POINT. W:
T-4.234.577 Rev. D
No leak
Manufacturer
receipt,
T.13.376.808E&
DEP 31.40.10.19
As per Manufacturer
recommendation
Responsible Party
WITNESS
S
Acceptance Criteria
: Rev-H / 10.02.2009
Site Engineer
Verifying Documents
GAM-QCR-QAC-GTL045,047,048
Page 6
Document No : GAM-ITP-QAC-GTL-030
Rev / Date
R: DOCUMENT REVIEW
Activity
4.3.1
4.4
X : CONTRACTOR QC
C : COMPANY
S: SURVEILLANCE
Characteristic to be
Verified
Control Procedure
Reference
Acceptance Criteria
Leaks
T-4.240.925
No Leak
As per Specification
Bolt Tightness
T.4.234.548 &
Manufacturers
recommendation
T.13.376.808E&
DEP
31.40.10.19,T.13.
377.360
: Rev-H / 10.02.2009
V : VENDOR
H: HOLD POINT. W:
Responsible Party
QA/QC
Engineer
Site Engineer
WITNESS
Verifying Documents
GAM-QCR-QAC-GTL-045
As per
specification
GAM-QCR- QAC-GTL041
R/A
R/A
Torque Value
Achieved
Site Engineer
Category A
Completed/ Corrected
Site Engineer
GAM-QCR-QAC-GTL050
Site Engineer
Visual
3.
4.5
4.6
4.
Valve installation
5.
6.
4.7
T-4.234.577 Rev. D
Installation Complete
As per Manufacturers
recommendation & As
per Company
Specifications
T.13.377.421
T-4.234.069,
Manufacturers
Recipe,
T13.376.808
&DEP 31.40.19
Shifted to 4.3.1
Page 7
Document No : GAM-ITP-QAC-GTL-030
Rev / Date
X : CONTRACTOR QC
R: DOCUMENT REVIEW
Activity
C : COMPANY
S: SURVEILLANCE
: Rev-H / 10.02.2009
V : VENDOR
H: HOLD POINT. W:
Characteristic to be
Verified
Control Procedure
Reference
Acceptance Criteria
No Leak
T-4.234.548 &
Manufacturers
Recipe & DEP
31.40.19/Design
Code
Manufacturers
recommendation
Site Engineer/
QA-QC
Engineer
Water disposal
Manufacturers
recommendation
Manufacturers
recommendation
Responsible Party
WITNESS
Verifying Documents
Site Engineer
Manufacturers
recommendation
Site Engineer
Manufacturers
recommendation
Site Engineer
QAM-QCR-QAC-GTL-050
Manufacturers
recommendation
Site Engineer
Manufacturers
recommendation & As per
Test Pack
4.8
4.9
4.9.1
4.10
4.11
4.12
Restoration
No damage of pipe &
No voids at bottom of
pipe
No Leak
T-4.234.074 &
DEP 31.40.19
Manufacturers
recommendation
& DEP 31.40.19
DEP 31.40.10.19,
4.13
Bolt
a) Loose Bolt
b) Wrong Type of Bolt
c) Flange Face
Condition
T.13.377.360 Rev
E,
DEP 70.10.70.11Gen
Site Engineer
DEP 31.38.01.11-
T-4.234.577 Rev. D
Page 8
Document No : GAM-ITP-QAC-GTL-030
Rev / Date
R: DOCUMENT REVIEW
Activity
b)
X : CONTRACTOR QC
Gasket Installation
Characteristic to be
Verified
a) Damaged Gasket
b) Gasket Installed off
centre
c) Old Temporary
Hydro test Gaskets
still in place
d) Incorrect Flange
alignment in line
flanges
e) Debris in valve seat
as a result of
transport form
manufacturer
C : COMPANY
S: SURVEILLANCE
Control Procedure
Reference
Acceptance Criteria
V : VENDOR
H: HOLD POINT. W:
Responsible Party
DEP 31.40.10.19Gen,
T.13.377.360 Rev
E,
: Rev-H / 10.02.2009
Site Engineer
DEP 70.10.70.11Gen
WITNESS
Verifying Documents
DEP 31.38.01.11-
4.15
5.0
T-4.234.577 Rev. D
Internal Cleaning
Internal Cleaning
T-4.231.172
T-13.377.561
Project Spec. Part
4, Chapter 6
No foreign materials
inside the pipe after
flushing
QA / QC
Engineer
Visual
No foreign materials
inside the pipe after
flushing
QA / QC
Engineer
Recorded Video
Page 9
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location /
Area:
Subsystem:
ITP No.:
Mark No./Joint No
Grade
Accepted By
ORGANIZATIONS
DATE
GAM-QCR-QAC-GTL-041
Bolting
Rev. O
Size
NAME
Bolt Tightening
(Torque Value)
Inspectors
Signature
SIGNATURE
Q
Q
A
A
T
T A
A
R
R
Report No.:
Item Description:
Inspection Date:
Subsystem:
Line No.:
Unit No:
Isometric No.:
Pressure Class
Sl.
Joint
Spool/ item No.
No
No.
Dia
(Inch)
Sealing
Test
Joint Type
Test
Medium
Bonder Shop
No.
/Field
INSPECTION ACTIVITIES
Visual
Fit-up &
Repair
Cutting
(Rep. Ref.
O-Ring
/Tapering Cleanliness Allignmen
Defective Remarks
Installation
QCR
of Joints
t
Joints
FORM-
ACCEPTED
ORGANIZATIONS
LINDE REP.
GAM-QCR-QAC-GTL-045, Rev-A
NAME
SIGNATURE
DATE
Report No.:
Item Description:
Inspection
Date:
Subsystem:
ITP No.:
REMARKS:
JOINT NO
PERCENTAGE
INSPECTOR
SIGNATURE
The Actual value should not be less than 90% of the Minimum Base line value
ORGANIZATIONS
Accepted By
ACTUAL VALUE
GAM-QCR-QAC-GTL-047 Rev. O
DATE
NAME
SIGNATURE
Q A T A R
Subcontract Ref.:
Item Description:
Item Location / Area:
Subsystem:
Ref. DWG / Documents:
Used Measuring and test equipment ref. (if applicable):
Report No.
Inspection Date:
Test Code No.:
ITP No.:
Drawing No. :
Pipe Dia. :
Spool No. :
Lam. kit No. :
Bond Width :
Nominal Pressure :
Test Pressure :
Bond Thickness :
Finishing Date on :
Starting Date on :
at
hrs.
at
hrs.
Temperature:
Humidity:
Manufacturer Recipe Ref:
Bonder No.:
Fit Layer
No. of Layers
W/R Type
Resin Type
Resin Quantity
Resin Quantity
Vinylester
Structure Lay up
No. of Layers
W/R Type
Resin Type
Vinylester
Top Tape
Internal layer
Bond Widt
W/R Type
Bond Thickness :
No. of Layers
Resin Type
Resin Quantity
Vinylester
Surface mat.
Accepted By
ORGANIZATIONS
DATE
GAM-QCR-QAC-GTL-048, Rev-0
NAME
SIGNATURE
Q A T A R
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Subsystem:
ITP No.:
Area
Location
Description of Filling
a) Sand
b) Gravel (SC1)
Site Clearance
Excavation
ACCEPTABLE
REMARKS:
YES
Accepted By
ORGANIZATIONS
DATE
THIRD PARTY
REP.
GAMA
LINDE
QS GTL
GAM-QCR-QAC-GTL-050 Rev. O
NAME
NO
SIGNATURE
ITEM No:
PO No:
UNIT No:
MANUFACTURER :
ITEMS TO BE CHECKED
1 Visual damage
2 Quantity
3 Test certificates
4
5
6
7
8
GAM-QCR-QAC-GTL-079 Rev. O
INSPECTOR
INITIAL
REQ No:
REMARKS
Project No
Doc.No: 0100-W-QA-1825
Isometric No:
(Line No)
Page 1 of 1
GAMA
Preservation
Method
Inspection
result
Spool
Cleaning
Method
Prefabrication
Cleanliness Class
Sheet
Piping
Contractor:
Inspection
method
Project No:
Piping Contractor
Date
Signature
Erection
Company
Date
Signature
LINDE
Date
Signature
PMC
Name:
Name:
Name:
Signature:
Signature
Signature:
Date:
Date:
Date:
GAM-QCR-QAC-GTL-139 Rev. O
Piping Contractor-GAMA
Company-Linde
Date
Signature