Pearl GTL

Project
LINDE ENGINEERING

Shell Project No: HP-3000-QAT

Contractor Project No:

Project Document Number: T.4.318.623

Project Rev.: O

5887

Page 1 of 17

SUPPLIER/VENDOR DOCUMENTATION
Purchase Order Number:

2MH127

Equipment Description:

N/A

Vendor/Supplier Name:

GAMA QATAR CO. W. L. L.

Document Title:

INSPECTION TEST PLAN FOR INSTALLATION OF AIR INTAKE FILTER

Vendor/Supplier
Doc Number:

GAM-ITP-QAC-GTL-050

Tag/Item Number(s):

SEE NEXT PAGE

Unit: SEE NEXT PAGE

Vendor/Supplier
Code:

LOC470

Vendor/Supplier
Revision: C

PCWBS: SEE NEXT PAGE

Vendor/Supplier Prepared
By

Vendor/Supplier
Checked By

Initials / Signature

Initials / Signature

SK

Vendor/Supplier Approved By

EO

Initials / Signature

Vend/Supp
Revision Date

AG

22.02.2009

Status of Submission (tick applicable box before submission)


Final:
Certified:
As-Built:

For Review/Info: X

Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor
does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.

PURCHASER AREA BELOW


Contractor Contract Number:

PI 092

Contractor Name:

Contractor Doc. No: GAMAC-0100-M-PC 1344

Review Code and Status


Code 1

No Comments. ACCEPTED.
Work May Proceed.

Code 2

Comments As Noted. Incorporate Comments, Revise


and Resubmit. Work May Proceed.

Code 3

REJECTED. Incorporate Comments, Revise and


Resubmit. Work May NOT Proceed.

Code 4

Not Reviewed. Work May Proceed.

LINDE

Contractor Rev no: 1.0


Contractor Initials
/ Signature

Date
signed

Pearl GTL
Project
Shell Project No: HP-3000-QAT
Project Document Number: T.4.318.623

LINDE ENGINEERING

Contractor Project No:


Project Rev.: O

5887

Page 2 of 17

Purchase Order Number:

2DF955, 2DF956, 2DF957, 2DF958, 2DF959, 2DF960, 2DF961, 2DF962

Tag/Item Number(s):

1S-2111, 1S-2211, 1S-2311, 1S-2411


2S-2111, 2S-2211, 2S-2311, 2S-2411
1A-2114, 1A-2214, 1A-2314, 1A-2414
2A-2114, 2A-2214, 2A-2314, 2A-2414

Unit(s):

1-2100, 1-2200, 1-2300,1-2400, 2-2100, 2-2200, 2-2300, 2-2400

PCWBS:

FA03, FB03, FC03, FD03, GA03, GB03, GC03, GD03

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION

22.02.09

Issued for Company Comments

SK

EO

AG

ICC

19.02.09

Issued for Review

SK

EO

AG

IFR

15.01.09

Issued for Internal Review

SK

EO

AG

IIR

Date

Description

GAMA
Rev.
No.

Project
Rev
No.

Prepared Checked Approved


By
By
By
ORIGINATOR

Status

Document Title:

LINDEGINEERING AG

INSPECTION TEST PLAN FOR INSTALLATION OF


AIR INTAKE FILTER
Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC470
GAM

ITP

QAC

GTL

050

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T.4.318.623

Vendor Code

Rev No: O

QSGTL PEARL PROJECT

ITP NO: GAM-ITP-QAC-GTL-050

C2 ASU Construction Works


ITP FOR INSTALLATION OF AIR INTAKE FILTER
S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

DATE: 22.02.09-REV.C

A. THIRD PARTY (TPI) / VENDOR

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Reference Document

1.0

DOCUMENTATION

1.1

Contractor drawings, project


specifications, manuals, codes

100%

1.2

Lifting studies (For Heavy


Equipments)

100%

T.4.234.084

2.0

EQUIPMENT

2.1

Equipment identification and


name plate verificationReceiving Inspection

100%

T-4.250.945

2.2

Storage, preservation and


documentation (FSI)

100%

T.13.377.360E;T.4.250.932

100%

T.4.250.915

T-4.250.945

2.3

Inspection measuring and test


equipment calibration

3.0

FOUNDATION
Foundation complete and

3.1

Accepted (including chipping,


pocket cleaning etc.)

T-4.318.623 REV-O

100%

Acceptance Criteria

Responsible
Party

Verifying Documents

TECHINICAL
OFFICE

HSSE

STORE
INCHARGE

GAM-QCR-QAC-GTL-080

FSI

GAM-QCR-QAC-GTL-069

QCI

Calibration certificate

Approved drawing,
DEP 34.19.20.31;
T.13.376.358 DEP
31.29.00.10

QCI

MC Check Record

Approved drawing,
DEP 31.10.03.10; DEP
31.29.00.10
Approved drawing,
DEP 31.29.00.10;DEP
70.10.70.11 T.13.377.454E;
Vendor instruction,

Page 4

QSGTL PEARL PROJECT

ITP NO: GAM-ITP-QAC-GTL-050

C2 ASU Construction Works


ITP FOR INSTALLATION OF AIR INTAKE FILTER
S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

DATE: 22.02.09-REV.C

A. THIRD PARTY (TPI) / VENDOR

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

100%

T-4.250.945

Approved drawing,
T.13.376.358
DEP 31.29.00.10

QCI

3.2

Shims installation

4.0

STRUCTURAL STEEL INSTALLATION UNDER THE STRUCTURE

Verifying Documents

-----------

GAM-QCR-QAC-GTL038, 039

GAM-QCR-QAC-GTL-183

Foundation acceptance
a) Check elevation of
foundation
4.1

4.2

4.3

b) Location of anchor
bolts (if applicable)
c) Embedded plates
installation (if
applicable)
Verification of lifting
points & support
points(During
transportation, Before&
after lifting the structure)
Verify
a) alignment
b) verticality (Before bolt
tightening and or
welding)

T-4.318.623 REV-O

100%

RFC Drawings

RFC Drawings

QC
Inspector

100%

T.4.250.897

34.28.00-31;
T.13.376.359E

Site
Engineer

100%

T.4.250.907

Approved drawings

34.28.00-31;
T.13.376.359E

Site
Engineer

GAM-QCR-QAC-GTL-037

Page 5

QSGTL PEARL PROJECT

ITP NO: GAM-ITP-QAC-GTL-050

C2 ASU Construction Works


ITP FOR INSTALLATION OF AIR INTAKE FILTER
S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

DATE: 22.02.09-REV.C

A. THIRD PARTY (TPI) / VENDOR

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

4.4

4.5

4.6

Activity

Check bolt tightening


a) Verification of torque
b) Check anchor bolt
tightening (if
applicable)
Painting / Coating
Repair works ( if
applicable)

Test
Frequency

Reference Document

Approved drawings

100%

T.4.250.907

5.0

FILTER HOUSE

T-4.318.623 REV-O

Site
Engineer

Verifying Documents

GAM-QCR-QAC-GTL041 & Red Indication


Mark over bolt head

Refer To Grouting ITP (For structure only)

Final Inspection of
accessories
Ladders, stairs treads,
safety cages, Gratings,
Toe plates

34.28.00-31;
T.13.376.359E

Responsible
Party

Refer To Painting ITP

Grouting
Verification of surface
preparation

4.7

Acceptance Criteria

Approved drawings

100%

T.4.250.907

T-13.376.377;
34.28.00-31;
T.13.376.359E

Site
Engineer

GAM-QCR-QAC-GTL-040
GAM-QCR-QAC-GTL-183

Page 6

QSGTL PEARL PROJECT

ITP NO: GAM-ITP-QAC-GTL-050

C2 ASU Construction Works


ITP FOR INSTALLATION OF AIR INTAKE FILTER
S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

DATE: 22.02.09-REV.C

A. THIRD PARTY (TPI) / VENDOR

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

Activity

Test
Frequency

Installation
of
weather
hoods to walkway section
5.1

a) Visual Damages (Gasket


D- fog etc)

100%

Reference Document

T-4.157.374
T-4.250.947

Acceptance Criteria

Responsible
Party

Approved drawings
DEP 31.29.40.10;
DEP 31.29.40.31

QCI

Approved drawings
DEP 31.29.40.10;
DEP 31.29.40.31

QCI

Approved drawings
DEP 31.29.40.10;
DEP 31.29.40.31

Verifying Documents

GAM-QCR-QAC-GTL-041
GAM-QCR-QAC-GTL-183

QCI

GAM-QCR-QAC-GTL-041
GAM-QCR-QAC-GTL-183

Approved drawings
DEP 31.29.40.10;
DEP 31.29.40.31

QCI

GAM-QCR-QAC-GTL-183

Approved drawings
T-13.376.359 E;
DEP 34.28.00.31

Site
Engineer

GAM-QCR-QAC-GTL-041 &
GAM-QCR-QAC-GTL-183

Approved drawings
DEP 31.29.40.10;
T-13.377.453E

Site
Engineer

GAM-QCR-QAC-GTL-041 &
GAM-QCR-QAC-GTL-183

GAM-QCR-QAC-GTL- 041
GAM-QCR-QAC-GTL-183

b) Bolt tightening
5.2

Installation of walkway &


Filter house

100%

5.3

Installation of maintenance
door, C.A.S access hatch
installation,
hopper
assembly

100%

5.4

Air tightening

100%

5.5

Louver Section
a)Mechanical Check-Visual

100%

Transition Duct
5.6

a)
Visual
Inspection
(Gasket, cleaning etc.)

T-4.318.623 REV-O

100%

T-4.157.374
T-4.250.947
T-4.157.374
T-4.250.947
T-4.157.374
T-4.250.947
T-4.157.374
T-4.250.947

T-4.157.374
T-4.250.947

Page 7

QSGTL PEARL PROJECT

ITP NO: GAM-ITP-QAC-GTL-050

C2 ASU Construction Works


ITP FOR INSTALLATION OF AIR INTAKE FILTER
S. GAMA QATAR

X. CONTRACTOR QC

C. COMPANY

DATE: 22.02.09-REV.C

A. THIRD PARTY (TPI) / VENDOR

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

5.7

5.8

5.9

Activity

Silencer Duct
a) TACK welding -visual

Round to square Duct


a)Visual Inspection
Hooper Fan

5.10

Filter Element Installation

5.11

Piping
system

6
6.1

6.2

Test
Frequency

100%

100%

100%
100%

Reference Document

Acceptance Criteria

T-4.157.374

Approved drawings
DEP 31.29.40.10;
T-13.377.453E

T-4.250.947

T-4.157.374
T-4.250.947
T-4.157.374
T-4.250.947
T-4.157.374
T-4.250.947

connection-PULS

Approved drawings
DEP 31.29.40.10;
T-13.377.453E
T-13.376.359 E;
DEP 34.28.00.31
T-13.376.359 E;
DEP 34.28.00.31

Responsible
Party

QCI

Verifying Documents

GAM-QCR-QAC-GTL-041
GAM-QCR-QAC-GTL-161
GAM-QCR-QAC-GTL-183

QCI

GAM-QCR-QAC-GTL-041
GAM-QCR-QAC-GTL-183

Site
Engineer
Site
Engineer

GAM-QCR-QAC-GTL-041
GAM-QCR-QAC-GTL-183

GAM-QCR-QAC-GTL-183

Site
Engineer

GAM-QCR-QAC-GTL-183

QCI

Linde MC Check records

Ref. Piping ITP

FINAL INSPECTION
Air tightness, Cleanliness,
visual inspection

Final Linde MC inspections


and documentation

T-4.318.623 REV-O

100%

100%

T-4.157.374
T-4.250.947
T-4.157.374
T-4.250.947

T-13.376.359 E;
DEP 34.28.00.31
Approved drawings
DEP 31.29.40.10;
T-13.377.453E

Page 8

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY
STRUCTURAL STEEL PRE
ERECTION & INSTALLATION
PROCESS SHEET
Subcontract Ref.:

Report No.:

Item Description:

Date:

Item Location/ Area:

ITP No.:

Subsystem:

Test Code No.:

GAM-ITP-QAC-GTL-

Ref. DWG / Docs:


Used Measuring and test equipment ref. (if applicable):

Check the following:


Item
No.
Pre Erection :
1.

Description

QC Inspector
Initial
Date

Foundation Handing over (Civil to Mechanical).

2.
3.
4.

Preparation of grouting (Chipping & Cleaning).


Checking for anchor bolt.
Shim plate fixed as per RFC drawing & work
instructions.
Installation Process :
1.
Foundation Complete & inspected.
2.
All Structural members correctly installed.
3.
Base supports are set at correct elevation.
4.
Structures Plump & alignment in all directions.
5.
Length of bolts is correct.
6.
All washers are correctly mounted.
7.
Correct tightening for all bolts.
8.
All temporary construction materials are removed.
9.
Welding acceptable.
The Installation of the above Steel has been Satisfactorily completed in accordance with the Drawings& Specifications.
Note: This QCR form revised on 23.11.2008 as per the site requirement and QCR form # 125 shall not been
used further as per (PMC commends) Transmittal # PI-092-LIN-PMC-TX-21510.
ORGANIZATIONS

Accepted By

THIRD PARTY REP.

GAMA REP.

LINDE REP.
QSGTL OR its PMC REP.

GAM-QCR-QAC-GTL-037 Rev. O

NAME

SIGNATURE

DATE

C2 ASU PEARL GTL PROJECT


RASLAFFAN INDUSTRIAL CITY
STEEL STRUCTURES ELEVATION
REPORT

( BASED ON SURVEY REPORT)


Subcontract Ref.:

Report No.:
Inspection
Date:
Test Code
No.:

Item Description:
Item Location / Area:
Subsystem:

ITP No.:

Ref. DWG / Documents:


Used Measuring and test equipment ref. (if applicable):
INSPECTIONS
Column No

Planned Level

Actual Level

Level/Difference

Plumb
0 Degree

Accepted By

ORGANIZATIONS
THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.

GAM-QCR-QAC-GTL-038 Rev. O

DATE

NAME

90 Degree

SIGNATURE

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY
ALIGNMENT REPORT FOR
STEEL STRUCTURE
Subcontract Ref.:

Report No.:

Item Description:

Inspection Date:

Item Location / Area:

Test Code No.:

Subsystem:

ITP No.:

Ref. DWG / Docs:


Used Measuring and test equipment ref. (if applicable):
Unit No.:
OUT OF PLUMBNESS

Accepted By

ORGANIZATIONS

DATE

THIRD PARTY REP.


GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.

GAM-QCR-QAC-GTL-039

Rev. O

NAME

SIGNATURE

C2 ASU PEARL GTL


PROJECT-RAS LAFFAN
INDUSTRIAL CITY
CHECK LIST OF LADDER,
HANDRAIL, STAIRCASE & GRATING

Subcontract Ref.:

Report No.:

Item Description:

Inspection Date:

Item Location / Area:

Test Code No.:

Subsystem:

ITP No.:

Ref. DWG /
Documents:
Used Measuring and test equipment ref. (if applicable):

INSPECTIONS
No.

Ladders
Ok/Not
Mark No
Ok

Handrail
Mark No

Accepted By

ORGANIZATIONS
THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.

GAM-QCR-QAC-GTL-040 Rev. A

DATE

Ok/Not
Ok

Staircases
Mark No

NAME

Ok/Not
Ok

Check of Grating
Mark No

SIGNATURE

Ok/Not
Ok

C2 ASU PEARL GTL PROJECT


RASLAFFAN INDUSTRIAL CITY
BOLT TIGHTENING INSPECTION
REPORT

Subcontract Ref.:

Report No.:

Item Description:

Inspection Date:

Item Location /
Area:

Test Code No.:

Subsystem:

ITP No.:

Ref. DWG / Docs:


Used Measuring and test equipment ref. (if applicable):
INSPECTIONS
Item No/Spool
No

Mark No./Joint No
Grade

Accepted By

ORGANIZATIONS

DATE

THIRD PARTY REP.


GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.

GAM-QCR-QAC-GTL-041

Bolting

Rev. O

Size

NAME

Bolt Tightening
(Torque Value)

Inspectors
Signature

SIGNATURE

FORM NO:

STORAGE, PRESERVATION AND NITROGEN PURGING REPORT

SHT:

PROJECT: C2 ASU PEARL GTL PROJECT, RAS LAFFAN INDUSTRIAL CITY


EQUIP. TAG.NO.:

DESCRIPTION:

LOCATION:

MANUFACTURER:

DRG.NO.:

RFI NO:

MONTH
ACTIVITY

1
Month

Date Checked
Check all internal and accessories
storage is acceptable
Visual Check : Is there any damage
Check for protective covers on all the
openings
Check all warning labels,like N2
warning plate are existent
Actual Pressure level
Required Pressure Level

GAMA SIGN WITH DATE


LINDE SIGN WITH DATE
QSGTL or its PMC
NOTE:

GAM-QCR-QAC-GTL-069 Rev. O

10

11

12

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

EQUIPMENT RECEIPT CHECK SHEET

ITEM No:

PO No:

UNIT No:

MANUFACTURER :

ITEMS TO BE CHECKED

REQ No:

INSPECTOR
INITIAL

REMARKS

1 Name Plate
2 Preparation and painting
3 Desiccant installed
4 Moisture present
5 Nozzle flange faces acceptable
6 Temporary nozzle protection
acceptable
7 Internals and accessories complete
and storage acceptable
8 Purge - pressure:
Purge monitoring date:
Date of initial inspection:

Name and signature of Inspector:

GAM-QCR-QAC-GTL-080 Rev. O

Pressure

VISUAL INSPECTION REPORT FOR EQUIPMENT/STRUCTURAL STEEL


Project Name : ASU C2 PEARL GTL PROJECT

Date :
Report No :

SL
No

Welder
Name of Welder

ID

Equipment Type

WPS No

Process

Location

Visual
Inspection

Date of
Acceptance Visual
Inspection

Remarks

Note: Acceptence Criteria-

Prepared By
Signature :

Name :
Date :

GAM-QCR-QAC-GTL-161 REV. O

Checked By: GAMA QATAR QC

LINDE QC

Company / PMC QC

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Q A T A R

AIR INTAKE FILTER INSTALLATION PROCESS SHEET

Tag No:
Item Description:

Report No:
Date:

Drawing No:
System No:
Item
No

Area:
Sub-System No:
Description

Signature & Date


Gama
Linde QSGTL

1.
2.

Foundation complete, Level & Accepted.


Shim plates as per drawings

3.

Installation of Staircase, ladder, gratings, toe plates etc.

3.1
4

Installation of Weather hood


Installation of 1st , walkway and second cabins

5
5.1
5.2

Installation of accessories (doors, CAS access hatch etc)


Air tightening Inspection
Louver section installation

5.3
6

Transition duct installation


Silencer duct installation

6.1
7
8
9

Round to square duct installation


Hooper fan installation
Filter element installation
Final Inspection (Cleanliness, air tightness, visual checks etc.)

Remarks:

The Installation of the above Air Intake Filter has been satisfactorily completed in accordance
with the Drawings & Specifications
ORGANIZATIONS
GAMA QATAR REP
LINDE REP
QSGTL REP
GAM-QCR-QAC-GTL-183 Rev. O

DATE

NAME

SIGNATURE