Documente Academic
Documente Profesional
Documente Cultură
ITP No.:
EXW-P015-0000-QM-LNTIT-00066 Rev CB
Page 1 of 5
S
l
Applicable
specification
and clause
reference
Type of
Check
Frequency of
inspection
and/or testing
Acceptance Criteria
The
verifying
records
Sub
C
Legend
s
L&T = Larsen
Toubro
Limited
Infrastructure IC
&
Sub C = Subcontractor
CM = Construction
Manager, SM = Section
Manager PE = Project
Engineer
SE
=
Section
Engineer/Site
Engineer
ME = Material Engineer
NA = Not Applicable
PQP WP = Project Quality Plan
Procedure
QCE = QA/QC
Engineer
ENG = Engineers
Representative
Party
Level of Control:
KM- KHARAMAA
SIS - Service Information Sheet
PTW- Permit to Work
H = activity to be inspected/ signed-off by
relevant prior to the next activity
W = activity may proceed with or without
inspection by relevant party
L&T
ENG
Responsibility
for signature(s)
on verifying
records
TPI/TPL
DR = Document Review
T = Test Conduction
MTC = Manufacturer Test Certificate
MAN = Material Arrival Notification.
DN = Delivery Note = Manufacturer Test Certificate
S = Surveillance
C = Inspection ,Testing & Control on activity
Prequalification of
Subcontractor
Document
Review
PQP WP 10
Submission:
2.1 Method Statement
2.2 Drawing IFC/
Shop Drawing
2.3 Material Submittal
2.4 Stakeholders
approvals
2.5 Work Permits (prior
to start related activity)
PQP WP 11
QM-LNT-IT-00066-Rev.CB
Document
Review
Before start of
work
Before start of
work
Date: 26.04.2015
ENG
approval
Transmittal
Form
LTCD/QM
S/PLAN/01
ENG
approval
Transmittal
Form
LTCD/QM
S/PLAN/01
and
Stakehol
ders
Approval
C&H
QCM /ME/
CM/SM and
ENG
QCM /ME/
CM/SM and
ENG
EXW-P015-0000-QM-LNTIT-00066 Rev CB
Page 2 of 5
S
l
Applicable
specification
and clause
reference
Type of
Check
Frequency of
inspection
and/or testing
Acceptance Criteria
The
verifying
records
Sub
C
QCS 2010
Section 8, Part
3 Project
Specification,
Manufacturer
ITP
L&T
ENG
MTC review
for each
delivery
Test
reports as
per
Supplier
ITP
C&H
Mix Design
Review of
Supplier
Supplier
s Mix
Design
C&H
MTC
Review
Each Source
MTC
C&H
Mix Design
Review of
Supplier
Supplier
s Mix
Design
C&H
1000 cubic
meter
Test
Report
C&H
3.2
3.3
Pulling Rope
3.4
Concrete Surround
3.5
Approved
Shop/IFC
Drawing
3.6
Warning Tape
As per QCS
2010 Section
21 Part 30
Cl 30.2.7
MTC
Review
Each Source
Supplier
s Test
Report
C&H
3.7
As per QCS
2010
MTC
Review
Each Source
Supplier
s Test
Report
C&H
3.8
QCS 2010
Visual
inspection
Each Source
DN
C&H
Test
TRENCH EXCAVATION
QM-LNT-IT-00066-Rev.CB
TPI/TPL
Document
Review/Insp
ection and
Testing
3.1
Approved
Shop /IFC
Drawing
Approved
Shop /IFC
Drawing
Approved
Shop /IFC
Drawing
Responsibility
for signature(s)
on verifying
records
Date: 26.04.2015
ME / QCE /
QCM and
ENG
PE/SM/CM
and ENG
EXW-P015-0000-QM-LNTIT-00066 Rev CB
Page 3 of 5
S
l
Applicable
specification
and clause
reference
Type of
Check
Frequency of
inspection
and/or testing
Acceptance Criteria
The
verifying
records
Sub
C
5.1
5.2
5.3
5.4
Record of Existing
Ground level
Identification of
utilities, Protect,
Relocate, Demolition
and removal of Existing
utilities upon Approval
from Authority
QCS 2010
S21:P30
QCS 2010
S6:P1 Cl 1.3
Inspection
IR
Ahead of
trench
excavation
Every 50
meters
QCS 2010 S 2
P2, S6 P 11,
S8:P4
Inspection
Ahead of
trench
excavation
Excavation
QCS 2010 S 6
P3
Inspection
Each section
5.6
QCS 2010
S:8 P:2 Cl
2.2.6
Visual
Inspection/Tes
t/Measuremen
t/IR Survey
After Trench
Excavation
7.1
7.2
7.3
ENG
TPI/TPL
5.5
L&T
Responsibility
for signature(s)
on verifying
records
Approved
Shop
Drawing
Approved
Shop
Drawing
Approved
Shop
Drawing
QM-LNT-IT-00066-Rev.CB
Survey IR
Form
C&H
Survey IR
Form
C&H
IR Form
C&H
IR Form
C&H
Approved
Shop
Drawing/F
DT Report
C&H
Each DN
DN
C&H
Inspection/
Test
One Section
IRWorks
C&H
Temperature,
Pressure with
Time
Each joint
IRSurvey
C&H
DR
Date: 26.04.2015
Surveyor &
ENG
Surveyor &
ENG
PE/SM/CM/
ENG
Surveyor &
ENG
EXW-P015-0000-QM-LNTIT-00066 Rev CB
Page 4 of 5
S
l
Applicable
specification
and clause
reference
Type of
Check
Frequency of
inspection
and/or testing
Acceptance Criteria
The
verifying
records
Sub
C
Approved
Shop
Drawing
Approved
Shop
Drawing /
Method
Statement
Approved
Shop
Drawing
Inspection
L&T
ENG
Each Section
IRSurvey
C&H
Each Section
IRWorks
C&H
7.4
Duct Profile
7.5
7.6
Backfilling with
suitable fill material ( if
applicable)
QCS 2010
IR
1 test every
20m on Each
Layer.
FDT
Report
C&H
Method
Statement
Inspection
Each Section
IRWorks
C&H
Inspection
Responsibility
for signature(s)
on verifying
records
TPI/TPL
Name :
Signature:
Position
Date:
Prepared by:
Binu John
QA/QC Manager
26/04/2015
Reviewed by:
Gica Pricop
Head QA/QC
26/04/2015
Authorized by:
Manuel Abella
Project Director
26/04/2015
Approved
by
Representative
Engineers
QM-LNT-IT-00066-Rev.CB
Date: 26.04.2015
Description of
works/activity/characteristics
Applicable
specification
and clause
reference
Type of
Check
Frequency of
inspection
and/or testing
Acceptance Criteria
The
verifying
records
Sub
C
QM-LNT-IT-00066-Rev.CB
Date: 26.04.2015
EXW-P015-0000-QM-LNTIT-00066 Rev CB
Page 5 of 5
L&T
ENG
TPI/TPL
Responsibility
for signature(s)
on verifying
records