Documente Academic
Documente Profesional
Documente Cultură
CLIENTE:
NO
ING117-IMCC-120-CA-0006
HOJA
PROYECTO:
1 de 9
TITULO:
DOCUMENTO ORIGINAL:
REVISIN NDICE
REV.
0
1
REV. 0
REV. 1
27/09/2014
03/10/2014
EJECUCION
DC
DC
VERIFICACION
TA
TA
APROBACION
JH
JH
FECHA
REV. 2
REV. 3
REV. 4
LA INFORMACION DE ESTE DOCUMENTO ES PROPIEDAD DE YPFB REFINACION S.A., SIENDO PROHIBIDA SU UTILIZACION FUERA DE SU FINALIDAD
REV. 5
REV. 6
REV. 7
MEMORIA DE CALCULO
NO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
2 de 9
TITULO:
INDICE
1.
OBJETIVO ..................................................................................................................... 3
2.
ALCANCE ..................................................................................................................... 3
3.
4.
CALCULO ..................................................................................................................... 3
4.1
4.2
Datos ............................................................................................................................. 4
4.2.1
Presin de diseo................................................................................................. 4
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.3
Anexo 1 .................................................................................................................................. 9
NO
MEMORIA DE CALCULO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
3 de 9
TITULO:
1.
OBJETIVO
2.
ALCANCE
3.
DOCUMENTOS DE REFERENCIA
Process Piping
REF. 2
ING117-120-IMCC-PI-0003
REF. 3
REF. 4
ING117-136-IMCC-LT-007
4.
CALCULO
4.1
Frmula de clculo
La frmula utilizada est basada en la norma ASME B31.3 - 2012. A continuacin se indica la
formula y la descripcin de cada variable:
2 ( + )
= +
Dnde:
tc
Espesor calculado
[inch]
[psig]
[inch]
[psi]
[s.u.]
NO
MEMORIA DE CALCULO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
4 de 9
TITULO:
4.2
[s.u.]
[s.u.]
tn
[inch]
[inch]
Datos
SMYS (psi)
20000
MEMORIA DE CALCULO
NO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
5 de 9
TITULO:
MEMORIA DE CALCULO
NO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
6 de 9
TITULO:
Los calculo del espesor de tubera se realizaran en los valores limites de Rating.
4.3
Con la frmula detallada en el punto 4.1 y los datos del punto 4.2 se elabor la siguiente tabla
que muestra los espesores calculados y la especificacin de la tubera seleccionada para la
lnea de la esfera TK-2953:
Material Specification =
Quality Factor, E =
A106 Gr B
1,00
15,51 barg
30,0C
Design Pressure =
Design Temperature =
Allow. Stress @ 30C =
Corrosion Allowance =
= 225,00 psig
= 86,0F
= 137,90 MPa
= 0,06 inch
Y Coefficient @ 30C =
Ratio of (P/SE) =
20,000 ksi
1,59 mm
0,4
0,011
tpressure =
(P x D) / [2 x {(S.E) + (P.Y)}]
= 0,0055997276 x D inch
Print Sheet(s).
Pipe NPS
inch (mm)
" (15)
" (20)
1" (25)
1" (32)
1" (40)
2" (50)
2" (65)
3" (80)
3" (90)
4" (100)
5" (125)
6" (150)
8" (200)
10" (250)
12" (300)
14" (350)
16" (400)
18" (450)
20" (500)
Pipe OD
D (mm)
21,34
26,67
33,40
42,16
48,26
60,33
73,03
88,90
101,60
114,30
141,30
168,28
219,08
273,05
323,85
355,60
406,40
457,20
508,00
Factores
W
E
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
tc
(mm)
A
tn
Sch /
(mm) (mm)
Thk. (inch)
Column "A"
0,08 1,59
1,66 Sch.40
0,10 1,59
1,68 Sch.40
0,12 1,59
1,71 Sch.40
0,15 1,59
1,74 Sch.40
0,17 1,59
1,76 Sch.40
0,22 1,59
1,81 Sch.40
0,26 1,59
1,85 Sch.40
0,32 1,59
1,91 Sch.40
0,37 1,59
1,95 Sch.40
0,41 1,59
2,00 Sch.40
0,51 1,59
2,10 Sch.40
0,61 1,59
2,20 Sch.40
0,79 1,59
2,38 Sch.40
0,99 1,59
2,57 Sch.40
1,17 1,59
2,76 Sch.40
1,29 1,59
2,87 Sch.40
1,47 1,59
3,06 Sch.40
1,65 1,59
3,24 Sch.40
1,84 1,59
3,42 Sch.40
Nominal
Min. Thk.
Max.Allow. Ratio
Check
Thk. (mm) T (12,5% por fabricacin) P (barg)
(D/t)
(T>tmin)
Tnom
Column "B"
Check (>6)
2,77
2,42
111,42
25,55 Passed.
2,87
2,51
98,26
28,87 Passed.
3,38
2,96
116,82
24,41 Passed.
3,56
3,11
102,65
27,67 Passed.
3,68
3,22
96,05
29,51 Passed.
3,91
3,42
85,99
32,87 Passed.
5,16
4,51
114,09
24,97 Passed.
5,49
4,80
102,65
27,67 Passed.
5,74
5,02
95,84
29,57 Passed.
6,02
5,27
91,14
31,06 Passed.
6,55
5,73
82,88
34,08 Passed.
7,11
6,22
77,68
36,30 Passed.
8,18
7,16
71,56
39,34 Passed.
9,27
8,11
67,19
41,85 Passed.
10,31
9,02
64,51
43,55 Passed.
11,13
9,73
64,37
43,65 Passed.
12,70
11,11
65,87
42,67 Passed.
14,27
12,49
67,05
41,93 Passed.
15,09
13,20
64,23
43,74 Passed.
MEMORIA DE CALCULO
NO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
7 de 9
TITULO:
Con la frmula detallada en el punto 4.1 y los datos del punto 4.2 se elabor la siguiente tabla
que muestra los espesores calculados y la especificacin de la tubera seleccionada para la
lnea de blending:
Material Specification =
Quality Factor, E =
Design Pressure =
A106 Gr B
Design Temperature =
Allow. Stress @ 30C =
Corrosion Allowance =
Y Coefficient @ 30C =
Ratio of (P/SE) =
= 86,0F
30,0C
= 137,90 MPa
20,000 ksi
= 0,06 inch
1,59 mm
Valid for t<D/6
0,4
Check Passed.
0,007
(P x D) / [2 x {(S.E) + (P.Y)}]
= 0,0036145186 x D inch
tpressure =
1,00
10,00 barg
Print Sheet(s).
Pipe NPS Pipe OD
inch (mm) D (mm) Y
" (15)
" (20)
1" (25)
1" (32)
1" (40)
2" (50)
2" (65)
3" (80)
3" (90)
4" (100)
5" (125)
6" (150)
8" (200)
10" (250)
12" (300)
14" (350)
16" (400)
18" (450)
20" (500)
21,34
26,67
33,40
42,16
48,26
60,33
73,03
88,90
101,60
114,30
141,30
168,28
219,08
273,05
323,85
355,60
406,40
457,20
508,00
Factores
W
E
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
tc
(mm)
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
A
tn
Sch /
(mm) (mm)
Thk. (inch)
Column "A"
0,08 1,59
1,66 Sch.40
0,10 1,59
1,68 Sch.40
0,12 1,59
1,71 Sch.40
0,15 1,59
1,74 Sch.40
0,17 1,59
1,76 Sch.40
0,22 1,59
1,81 Sch.40
0,26 1,59
1,85 Sch.40
0,32 1,59
1,91 Sch.40
0,37 1,59
1,95 Sch.40
0,41 1,59
2,00 Sch.40
0,51 1,59
2,10 Sch.40
0,61 1,59
2,20 Sch.40
0,79 1,59
2,38 Sch.40
0,99 1,59
2,57 Sch.40
1,17 1,59
2,76 Sch.40
1,29 1,59
2,87 Sch.40
1,47 1,59
3,06 Sch.40
1,65 1,59
3,24 Sch.40
1,84 1,59
3,42 Sch.40
Nominal
Min. Thk.
Max.Allow. Ratio
Check
Thk. (mm) T (12,5% por fabricacin) P (barg)
(D/t)
(T>tmin)
Tnom
Column "B"
Check (>6)
2,77
2,42
111,42
25,55 Passed.
2,87
2,51
98,26
28,87 Passed.
3,38
2,96
116,82
24,41 Passed.
3,56
3,11
102,65
27,67 Passed.
3,68
3,22
96,05
29,51 Passed.
3,91
3,42
85,99
32,87 Passed.
5,16
4,51
114,09
24,97 Passed.
5,49
4,80
102,65
27,67 Passed.
5,74
5,02
95,84
29,57 Passed.
6,02
5,27
91,14
31,06 Passed.
6,55
5,73
82,88
34,08 Passed.
7,11
6,22
77,68
36,30 Passed.
8,18
7,16
71,56
39,34 Passed.
9,27
8,11
67,19
41,85 Passed.
10,31
9,02
64,51
43,55 Passed.
11,13
9,73
64,37
43,65 Passed.
12,70
11,11
65,87
42,67 Passed.
14,27
12,49
67,05
41,93 Passed.
15,09
13,20
64,23
43,74 Passed.
MEMORIA DE CALCULO
NO
REV.
ING117-IMCC-120-CA-0006
PROYECTO:
HOJA:
8 de 9
TITULO:
5.
CONCLUSIONES
MEMORIA DE CALCULO
NO
PROYECTO:
HOJA:
Anexo 1
REV.
ING117-IMCC-120-CA-0006
9 de 9