Documente Academic
Documente Profesional
Documente Cultură
Graf
Objectives:
Initial focus is on bringing an efficient strategy for the implementation effort for the chosen
Project Management software solution for a pilot project given the unique needs and
requirements of each clients business environment.
Secondary focus is given to the task of the implementation of an Enterprise solution for the
business using the pilot project as the starting point.
Summary
Legal ability to work in both Canadian and United States work environments with no
restrictions
Project Controls consultation work, systems integration, database management
Strong Project Controls background in cost engineering, database administration, and
planning/scheduling
Prism PPM, PrismG2, and EcoSys software solutions
Strong background in EPC work (Engineering, Procurement, and Construction)
Strong background in both private and government contracting work
Strong skills in oral and written communications (procedure writing, formal presentations,
specifications, technical papers, etc.) in the English Language
Demonstrated achiever with good knowledge of industry business practices
People and customer oriented: sensitive to inter-relational work environment
Cheerful disposition, positive outlook, and team player
Education
Bachelor of Science, Building Construction & Contracting
Purdue University, Indiana, USA
Graduated with 4.0 GPA (w/ a base of 4.0) First in Class Ranking Highest
Scholastic Distinction
1993
1990
Awards
1990 Presidential Scholar Award
Montgomery College, Maryland, USA
Given to a maximum of one student per year in demonstration of outstanding
contribution to the college (as president of an on-campus organization), good
grades, and leadership capabilities
1992 Outstanding Junior Award
Purdue University, Indiana, USA
1990
1992
Page 1 of 7
Language Skills
Spanish
Moderately good reading and conversational capabilities
Apr
2014
April
2015
Page 2 of 7
Nov
2013
Directed Client assessment and discovery workshops for CNRL and EnCana on
behalf of ARES
Apr
2014
Assessment and Proposal authorship for these Clients based on client workshop
discoveries and results
Extensive testing of the PrismG2 Product for Client release
May
2012
Nov
2013
May
2012
Primary consultative lead on the PrismG2 implementation effort for the TOS
Division, and implementation consultant for the Oil Sands Division of Nexen.
As the TOS Division has no familiarity with any Prism product, this group needed
consultative help in understanding the basic structure and capabilities of the
PrismG2 product, PrismG2 Fundamentals training, and day-to-day help in getting
basic project information into the system.
The Oil Sands Division required PrismG2 implementation consultation due to their
unique use of a highly customized version of Prism Project Manager. These
duties included Client-specific testing of the PrismG2 program and administrating
some special needs for desired customization of the PrismG2 product.
April
2012 -
I left my assignment with MEG Energy for a short period of time to attend to
this Clients needs with regard to their PrismG2 implementation effort.
Dec
2011
Dec
2011
The focus for this Client was getting certain issues documented and submitted
to ARES for resolution, which included custom report specifications and desired
programmatic changes to the PrismG2 Program.
Page 3 of 7
March
2011
Primary lead on the PrismG2 Implementation, which included the overall planning
and scheduling effort, PrismG2 personnel training, testing the application for
Client-specific scenarios, liaison to ARES on outstanding Client issues, custom
report and custom programming specifications, and the application of Client
solutions given PrismG2 capabilities.
Primary focus with this Client also included realignment of Projects Department
Project Control processes, procedures, and structures in conjunction with the
implementation of the PrismG2 software.
Provided the framework and the foundation for a new company Cost Breakdown
Structure. Also worked on a global WBS structure
As this Client utilizes Prism Project Manager (PPM) in a Production environment,
scope of work included the transfer of existing projects from PPM to Prism G2.
Scope of work also included the auditing and cleanup of PPM data for fitness to
transfer to PrismG2, which is very important with these types of
implementations.
Other duties included the authorship of detailed desk instructions related to the
transfer of existing PPM project to PrismG2 and creating PrismG2 projects from
scratch based on Client specifications.
March
2012
June
2007
Jan
2011
Page 4 of 7
June
2006
Project Controls Specialist working at Albian Sands Energy, Inc., north of Fort
McMurray, Alberta. Provided Client with specialized Project Controls consultancy
services in an industrial environment, including baseline tracking, project
analyses and assessment, project management financial controls systems
integration, and reconciliation of and balance between schedule and cost control
tools.
Software implementation specialist for specialized Project Management software
(PRISM suite of tools). Helped with development of specialty software authored
specifically for Albian Sands. Provided training, procedure writing, and QA/QC
functions in relation to this aspect of the work.
Implementation of databases to streamline and greatly increase worker
productivity for basic project controls functions.
Jan
2004
May
2006
May
2002
Set up and maintained Quantity Tracking Program for Waste Treatment Plant
Project (WTP). Duties also included analysis, evaluation, and coordination of
quantity tracking for design, procurement, and installation of bulk quantities on
11 billion dollar US federal project
Dec
2003
Generated project procedure and desk instructions for the Quantity Tracking
Program and trained others in the use of the associated tools
Initiated, coordinated, and executed process improvements for the Quantity
Tracking Program
Field Project Controls Engineer - Bechtel Corp., Oil & Gas Division
St. Croix, US Virgin Islands - Client: Hess Oil Corporation
May
2007
Jun
2000
Maintained both field cost and schedule data for various sub-projects on Delayed
Coker Project including labor performance, Primavera monthly updates, 3-week
craft schedules and 90-day detailed schedules
Set up and maintained MS Access database for field change control processes
Coordinated and implemented efforts to reforecast field labor hours and costs
Reviewed and approved all field material requisitions and craft time sheets
April
2002
Page 5 of 7
Lead field cost engineer responsible for labor reporting and change control
Reviewed and approved all field material requisitions and craft time sheets
Aug
1999
May
2000
Lead Field Project Cost Engineer - Bechtel Corp., Oil & Gas Division
Pascagoula, Mississippi, USA - Client: Chevron Oil Corporation
Set up and maintained field cost reporting for two Chevron projects
Paraxylene Expansion and Ethylbenzene Projects
Managed field change control and was responsible for generation, processing,
and incorporation of all field trends into the cost tools
Led periodic efforts to reforecast labor hours and costs
Reviewed and approved all field material requisitions and craft time sheets
July
1999
Nov
1996
Monthly and bi-monthly cost reporting to the Client for schedules, narratives, &
personnel
Maintained craft safety statistics, approved field material requisitions, and
approved craft time sheets
Field Project Controls Engineer - Bechtel Corp., Oil & Gas Division
Martinez, CA & Houston, TX, USA - Client: Shell Oil Corporation
Feb
1994
Oct
1996
June
1993
Jan
1994
Page 6 of 7
Journeyman Carpenter
1992 &
Prior
Page 7 of 7