OAG GROUP OF COMPANIES

OAG Engineering Sdn. Bhd. (502076-K)


OAG Offshore Sdn. Bhd. (631808-U)
OAG International Ltd. (18362-Samoa)

Corporate Profile
Oil & Gas Division
1. About OAG Oil & Gas Division 1

2. Company Profile 3

3. Project Management Services 4

4. Construction Management Services 6

5. Engineering and Inspection Services 8

6. Pipeline Joint In Fill & Coating Services 9

7. Past Projects 14

8. Contact Details 21
1. ABOUT OAG OIL & GAS DIVISION
OAG Group of Companies ('OAG') was established in 1999 and based in Kuala Lumpur,
Malaysia. Since our inception, we have specialized in the provision of professional and
consultancy services for the oil and gas industries through our Oil & Gas Division which
consists of the following companies:

 OAG Engineering Sdn. Bhd.


 OAG Offshore Sdn. Bhd.
 OAG International Ltd.

We provide services for all stages from the design phase right through to and beyond the
construction phases to commissioning.

OAG's directors and associates combine consultancy experience and qualifications with
wide-ranging experience in the oil, gas and engineering industry. OAG's directors have direct
experience of management of major projects in a variety of countries and environments
and, as such, we are well qualified to understand and rapidly respond to the needs of
different clients and situations.

OAG has succeeded in providing professional and consultancy services to companies in


Malaysia and around the region, namely Thailand, Indonesia and Vietnam.
We have extensive experience and have worked in close cooperation with many reputable
companies including multinationals. Please refer to section 8: Past Projects.

OAG offers the following professional and consultancy services for the oil and gas industries.

 Project Management Services


 Construction Management Services
 Engineering and Inspection Services
 Pipeline Field Joint InFill & Coating Services

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 1
Organization Chart

The organization of OAG is mainly made up of a team of administration personnel headed


by the Managing Director who has extensive experience in construction and development
of oil and gas facilities.

OAG currently has under its employment, over 20 personnel all under full time direct
employment with the company. Additional personnel are hired from time to time to meet
the requirements of our projects and to support the needs of our clients.

The organization chart for OAG is provided below.

ORGANIZATION CHART

Managing Director
Jonathan Chong

Business Development Manager


James Ng

Engineering Department Admin & Accounts Sales & Support


• Faizah Ibrahim • Siti Hasmah Mohamad
• Noorni Zakiah Khalid • Nik Hasrin Farrini Hassan
Project Engineer • Nor Dilawati Abu Talib • Mimi Musyahirah Maharam
Field Engineers
•Yutthana Jantarapitak • Suhaila Asmuni • Yuniza Md Yusop
• Anuarriduan Abd Jalil
• Aainaa Basitah Abd Rani • Suriani Shamsudin
• Mohd Redzuan
Samsudin
• Mohd Shafiq Suhaimi Design Engineer
• Teo Swee Teck • Samuel See

Technician
• Mohamad Norhadi Ibrahim
• Ang Peng Kheong
• Devandran a/l Arumugam
• Mohd Akhmal Haizam Idris
• Mohd Farid Zaini
• Puventhara s/o Sundra Sagam
• G. Thevagar s/o Gurunathan
• Ahmad Khairul Za’im Ismail

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 2
2. COMPANY PROFILE

Corporate Name : OAG Group of Companies

Business Office : Box No. 388, Suite 7.15, Level 7


Wisma Central, Jalan Ampang
50450 Kuala Lumpur
Malaysia

OAG Engineering OAG Offshore OAG International


Type of Entity Sdn Bhd Sdn Bhd Limited (by shares)
Registration
Place Malaysia Malaysia Singapore
Date 23 Dec 1999 20 Oct 2003 30 Sep 2004
Reference 502076-K 631808-U 183362
Equity
Shareholder 1 Jonathan Chong Jonathan Chong Jonathan Chong
Nationality Malaysian Malaysian Malaysian
Share Equity 90% 51% 50%
Shareholder 2 Deanna Goh OAG Engineering Deanna Goh
Nationality Malaysian - Malaysian
Share Equity 10% 49% 50%

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 3
3. PROJECT MANAGEMENT SERVICES

OAG specializes in providing project management services for any or all phases of a project.
Our project managers have extensive expertise to perform the following tasks proficiently.

 Direct, support and coordinate the engineering, drafting, construction, engineering


and inspection activities of any job whether large or small;
 Oversee and direct both internal company support work and third party
subcontractors to ensure that budget and schedule constraints are met;
 Work as the right hand of the client to carry out all required tasks;
 Play an integral role in defining the infrastructure needed to support project
execution;
 Ensure coordination between the various resources and activities, which is necessary
for the entire project phases; and
 Customize a reporting program that is most sensible to the client.

Our project managers are experienced, hands-on engineers and they have the knowledge
to fully understand the interrelationships necessary to efficiently resolve technical project
issues.

The project management process evolves through several key project areas as described
below.

Project Initiation & Planning

 Focus on preparation.

 Define and clarify the basis that will dictate subsequent project activities.

 Establish processes to clearly define mutual objectives and to eliminate the


ambiguities often associated with the work scope, work responsibilities, and work
relationships.

 Develop schedules, execution plans, subcontracting strategies, budgets, reporting


format and frequency, risk quantification, and QA/QC requirements. For larger
projects, define the role, authority and relationships between all interacting
companies.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 4
 Establish a communication plan to ensure complete and accurate information
dissemination during the project.

Execution and Control

 Focus on performance.

 Manage and monitor progress, resource, cost, scope change, performance quality
and document with timely reporting.

 Monitor performance by measuring progress against project forecasts.

 Tailor reporting system to meet individual needs.

 Identify potential problems and suggest alternate approaches for successful project
completion.

Project Close-out

 Close out project properly.

 Complete documentation to leave client with all necessary information to


subsequently track all aspect of the project and its final configuration.

OAG strives to develop and maintain strong allegiances among its clients. Our innovative
approach oversees the success of each project to ensure that each client's expectations are
fully met.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 5
4. CONSTRUCTION MANAGEMENT SERVICES

OAG has the relevant expertise to perform offshore installation and construction. Due to our
extensive experience, we able to perform most of the engineering required to support the
activities of fabrication and offshore installation work.

Engineering studies that cannot be performed in-house, can be outsourced to affiliates, who
are specialist in their respective fields.

The engineering work that can be offered by OAG includes all engineering required for the
installation of offshore facilities i.e. including platforms, pipelines and risers, mooring buoys,
storage facilities and transportation of these facilities.

The following engineering works are anticipated for typical offshore installation work:

Facility Engineering Work Description


Platform • Pile driveability, stick-up, pick-up, conductor hang off
studies.
• On-bottom stability studies.
• Lifting, rigging and structural components integrity check.
• Launch, floatation and pending.
• Installation aids design.
• Procedures for installation of platforms, storage and other
facilities.

Pipeline • Pipelay, initiation, abandonment analyses, Pipeline lifting


analyses for risers installation.
• Allowable weld excavation length.
• Pipeline and riser installation procedures.

Loadout & • Transportation (motion) and stability, tie-down and


Transportation seafastening.
• Linepipe stacking height
• Loadout procedures

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 6
With our extensive experience, the above installation engineering work can be performed
with the primary objective of producing a more efficient design from the stand point of
offshore installation aspect of the work, while fulfilling all requirements of the specifications,
codes and standards.

Verification and Review Services

OAG also perform review and verification of offshore installation on behalf of verification
authorities and oil and gas companies.

OAG is able to offer this expertise to ensure that facilities are being installed in accordance
with the relevant codes, standards and specifications. This service will greatly benefit facilities
owners as it will ensure maximum compliance by contractors during offshore installation and
therefore minimize the occurrence of defects resulting from installation activities. The defects
that may occur otherwise, may be defects that can only be detected after several years of
facility operation, possibly resulting in deterioration in the operation of the facilities and
reduced operating life.

The usually short duration of offshore installation activities does not justify the requirement for
a full time expert/specialist in offshore installation to perform verification services. Therefore,
this service by OAG offers the following advantages to facilities owners, to ensure
compliance with the company specifications, codes and standards, during installation of the
facilities:
 Commercially attractive option where specialists need not be hired fulltime but
instead only during the short planning and execution stage;
 Relieve facilities owner from task of sourcing personnel as experts and specialists in
this field are few in number.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 7
5. ENGINEERING AND INSPECTION SERVICES

Engineering and Inspection Services are an integral factor of a successful project


management in the oil and gas industry. The necessary requirements are personnel with
experience, expertise, certifications and relevant training.

OAG offers engineers and inspection personnel with the appropriate credentials necessary
to verify compliance with customer specifications. These include AWS certified welding
inspectors, NACE certified coating inspectors, API and ASME qualified inspectors, as well as
ASNT rated inspectors. This guarantees the highest level of performance by contractors in
any marine construction or pipeline environment.

Our experienced personnel have been involved in the following disciplines.

 Ultra deep water pipe lays, directional drills, beach approaches, river crossings, high
temperature, and H2S pipelines.

 Platform, deck and module construction, metering facilities, pressure vessels,


interconnecting piping, along with instrumentation and electrical inspections.

Our personnel maintain a communication link with our clients to ensure proper exchange of
information that is critical to the successful completion of the project.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 8
6. PIPELINE FIELD JOINT IN-FILL & COATING

OAG is a specialist for the application of High Density Polyurethane Foam (HDPUF) for
pipeline field joint in-fill. The product is made up of a two liquid chemical system i.e. Polyol
and Isocyanate.

The purpose of the HDPUF system is to fill up the area of the pipeline field joint so that the
outer diameter of the pipeline at the field joint area is approximately the same as the other
sections of the pipeline.

The purpose of this includes:


1) To provide protection to the pipeline at the field joint location,
2) To provide a homogeneous outside diameter for the entire length of the pipeline to allow
the pipe to move smoothly over the rollers and
3) In some instances, to provide insulation to the pipeline at the field joint area.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 9
HDPUF Chemical Profile

General Properties

Item Description Specification


1 Appearance Light Brown Liquid
2 Specific Gravity@ 25°C 1.04 – 1.06 g/cm³
3 Viscosity @ 25°C 270 – 430 mPa.s

Item Description Specification


1 Appearance Dark Brown Liquid
2 Specific Gravity@ 25°C 1.22 – 1.26 g/cm³
3 Viscosity @ 25°C 150 – 250 mPa.s

Typical Reaction Data

Item Description Specification


1 Mixing Ratio 100 : 118
2 Chemical Temperature 25-35 ºC
3 Cream Time 28-30 sec.
4 Gel Time 53-55 sec.
5 Free Rise Cup Density 120-126 kg/m³

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 10
Product Specifications & Properties

Property Test Standard Unit Value


Overall Moulded Density ASTM D1622 kg/m³ (pcf) 130-190 (8-12) / or to suit
Client’s requirement
Compressive Strength
ASTM D1621 MPa (psi) 1.3 (185)
(10% deflection)
Compressive Strength
ASTM D1621 MPa (psi) 6.7 (967)
(90% deflection)
Open Cell Content ASTM D2856 % 90

Note : When tested in field at 6.5 minutes demoulds and a load of 125 psi is applied, a
deflection of 4- 6 mm was observed.

Impact Test Results (max 35.5mm deflection)

Equipment

The equipment that will be utilized for the work is PU foam proportioning/metering unit. The
general specifications of the proportioning/metering units are as follows:
1) Metering Pump with delivery capacity - between 25 to 130kg/minute.
2) Tank Volume – 90dm3
3) Total Power – 14kW
4) Air Consumption – 130 NI/shot
5) Dimensions – Base Unit : 1.2m x 1.2m x 1.6m
6) Metering Pump with delivery capacity – up to 15kg/minute.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 11
PU Foam proportioning/metering units

Advantages of HDPU Foam against Mastic

HDPUF have been used for pipeline installation since the early 1980’s and have proven to
be advantageous in the following areas:

 Non hazardous – the chemicals and final product do not emit toxic fumes when
dispensed and provides a safe environment for personnel in the field joint station.
 Handling – The chemicals expand approximately 6 times the actual volume.
Therefore, 6 times less materials to handle, store and transport.
 Easy Application – Dispensing the chemicals do not require high temperature and
therefore eliminate the hazard of burns to the personnel.
 Chemicals ready to be used immediately, does not need high labor to prepare.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 12
Other Related Products

In addition to the provision of HDPUF application services, OAG Engineering Sdn. Bhd. is able
to provide the following product for pipeline field joint application:

• Cold Applied Anti Corrosion Tape Wrap – BITUTAPE 165PVC


• BITUTAPE 165PVC is a cold applied anti corrosion tape wrap that has been proven as an
effective an anti corrosion coating for pipeline field joints.
• BITUTAPE 165PVC can be applied to suit the requirement of the designers i.e. by spiral
wrap or cigarette wrap methods.

The general specification of BITUTAPE 165PVC is as follows:

Properties Standard Unit Value


Backing Color - - Black / Blue
Backing Type - - PVC
Backing Thickness ASTM D 1000 microns 750
Total Thickness ASTM D 1000 mm 1.65
Tensile Strength ASTM D 638 N/mm2 28.7
Elongation BS 2782 % 290
Tape Strength ASTM D 1000 N/mm >12
Tear Resistance ASTM D 1004 N >75
Adhesion to Primed Steel ASTM D 1000 N/mm 5
Adhesion to Self ASTM D 1000 N/mm 8
Impact Resistance DIN 30672 N.M 25
Di Electric Strength BS 2782 Kv >40
Insulation Resistance ASTM D 257 Ohms 9.8 x 1013
Cathodic Disbondment ASTM G 8 mm <10
Resistance
Water Vapor Transmission ASTM E 90 gms/m2/24 hrs 0.88
Water Absorption ASTM D 570 % 0.01
Resistance to Bacterial Attack ASTM G21
oC
Excellent
Application Temperature oC
+5 to +50
Service Temperature -20 to +100

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 13
7. PAST PROJECTS
List of the main Projects undertaken since commencement of operation/ business:

February 2000 to mid 2002

Client Germanischer Lloyd (Malaysia) Sdn. Bhd.


Project Cakerawala Gas Field Development Project for Carigali-Triton Operating
Company
Scope of Work  Provision of Technical/Engineering Services/Personnel for
fabrication and construction of offshore facilities
 Provision of Inspection Services/Personnel for the offshore
installation and construction of offshore facilities

December 2000
Client Icon Engineering Pte. Ltd
Project Installation of Platform at Bunga Kekwa field for Lundin
Scope of Work Provision of Supervisory and rigging /welding personnel for the offshore
construction.

December 2001 to May 2002


Client Saipem Asia (M) Sdn. Bhd.
Project Wenchang, China and Batam.
Scope of Work Provision of Safety personnel for the offshore construction activities.

January 2002 to April 2002


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Gas Transmission and Distribution Project Sakernan-Kuala Tungkal at
Hicom Petro-Pipes Sdn. Bhd.
Scope of Work Provision of Inspection Services/Personnel for the fabrication of spiral
welded carbon steel tubulars.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 14
March 2002 to July, 2002

Client Global Offshore Malaysia Sdn. Bhd.


Project  Installation and testing of subsea pipelines for Chevron (Thailand)
 Offshore Installation of platform and pipelines in Semarang Kecil
field for Petronas Carigali Sdn. Bhd.
Scope of Work Provision of Pigging and hydrotesting services including supply of
manpower, equipment and instrumentation for the project.

Mid 2002 to Mid 2003


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project BRA CCP Topside Project, Vinashin Site Vietnam for Talisman Energy.

Scope of Work Provision of Technical/Engineering/Inspection/Personnel for fabrication


and construction of offshore facilities.

End 2002 to Mid 2003


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Scope of Work Provision of Inspection Services at Brooke Dockyard, Kuching Sarawak for
& Project Talisman Malaysia Ltd.
Location

Early 2003 to Mid 2003


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Location Muthurajah Tank, Wattala Sri Lanka for Intec
Scope of Work Provision of Inspection and surveillance services

Year 2003 to 2004


Client PT Sempec Indonesia
Project Betara Complex Development Project – Phase 3
Scope of Work Provision of technical support for development of installation procedures
to complete the installation of the terminal.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 15
Year 2003 to 2005
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project & PM-3 CAA Phase 2 & 3 Development, MSE Pasir Gudang, Johor Malaysia
Location for Talisman Malaysia Sdn. Bhd.
Scope of Work Provision of Technical/Engineering Services/Personnel for fabrication and
construction of offshore facilities.

Mid 2003 to End 2004


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Offshore, Talisman 35-A & BR-K Hook-up & Commissioning
Scope of Work Provision of Inspection Services.

April 2003 to End 2005


Client Carigali-Triton Operating Company (CTOC)
Project Location Offshore Cakerawala, JDA Gas Field, Malaysian-Thailand.
Scope of Work Provision of Technical, Engineering and Inspection Services.

Mid 2003 to End 2003


Client Pegasus Oil & Gas Consultants Sdn. Bhd
Project Location Offshore /onshore Iran
Scope of Work Provision of the Engineering services

Mid 2003 to End 2003


Client Nippon Steel Construction (M) Sdn. Bhd.
Project Location Offshore/onshore Sarawak for Sarawak Shell Bhd.
Scope of Work Provision of the Technical, Engineering services.

Mid 2003
Client Oilfield Pipeline Inspection Sdn. Bhd.
Project Transportation & Installation of Offshore Facilities in Sarawak for Sarawak
Shell Berhad, pre-commissioning of 32” B11DR-A to E11R-B Pipeline.
Scope of Work Provision of Dewatering, Vacuum Drying and Nitrogen Packing for Nippon
Steel Construction Sdn. Bhd.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 16
Mid 2003 to Present
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Talisman Hook-Up & Commissioning Project, Kemaman Supply Based,
Terengganu, Malaysia.
Scope of Work Provision of the Technical, Engineering services.

End 2003
Client Nippon Steel Construction (M) Sdn. Bhd.
Project Transportation & Installation of Offshore Facilities in Sarawak for Sarawak
Shell Berhad, pre-commissioning of 32” B11DR-A to E11R-B Pipeline.
Scope of Work Supply of the equipments and spares.

Year 2004
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Trans Thai Malaysia Pipeline Project, Sungai Petani, Kedah Malaysia.
Scope of Work Provision of the Inspection Services.

Year 2004 to 2005


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Development of the facilities for Sudan Oil Field.
Scope of Work Provision of the Inspection Services.

Year 2005
Client Geocean SAS
Project Sakhalin Project
Scope of Work Provision of construction technical personnel for the installation of
pipeline.

Year 2005 - 2007


Client PT GL Nusantara
Project Kerisi Development Project
Scope of Work Provision of inspection services for fabrication of crane and pipe coating.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 17
Year 2005 to 2008
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Cakerawala Gas Field Development
Scope of Work Provision of inspection services for hook up and commissioning.

Year 2005
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Ruby B Topsides
Scope of Work Provision of marine warranty services for the load out of Ruby B Topsides.

Year 2005 to Present


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Bulan, Bumi, Suriya Field Development Project
Scope of Work Provision of technical, engineering and inspection services.

Year 2006
Client PT Geocean Indonesia
Project PGN Phase 1, South Sumatera – West Java Gas Pipeline Project
Scope of Work Provision of HDPUF application for pipeline field joint in-fill.

Year 2006
Client APECS Offshore Pte Ltd
Project ABU A 6” and 8” Pipeline Installation (RENTIS Technique)
Scope of Work Provision of HDPUF application for pipeline field joint in-fill.

Year 2007 to Present


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Bulan, Bumi, Suriya Field Development
Scope of Work Provision of inspection services for hook-up and commissioning.

Year 2007
Client Leighton Contractors Singapore
Project MPA Singapore / Pasir Panjang & Pulau Bukom Pipelines
10.75” OD x 6km x 2 lines
Scope of Work Provision of HDPUF application and Inspection Personnel for pipeline field
joint in-fill.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 18
Year 2007
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Northern Field Pipeline Installation Project.
Scope of Work Provision of Inspection Personnel.

Year 2007
Client JFE Engineering (S) Pte. Ltd.
Project PetroVietnam / DQR – 30” Onshore & Offshore pipeline
Scope of Work Provision of equipment and manpower for pipeline field joint in-fill.

Year 2007 - Present


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project MTJDA B-17 Field Development for Carigali – PTTEPI Operating Company
Sdn. Bhd. (CPOC)
Scope of Work Provision of Inspection Personnel for QA/QC Services.

Year 2007 - Present


Client PT Java Velosi Mandiri, Indonesia
Project North Belut Project, ConocoPhillips Inc. Ltd.
Scope of Work Provision of inspection services for fabrication of crane and pipe coating.

Year 2007
Client Sapura Acergy Sdn Bhd
Project Kikeh Gas Pipeline Project – Murphy Oil Malaysia
Scope of Work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill and
supervision of Heat Shrink Sleeves (HSS) application.

Year 2007
Client Kencana HL Sdn Bhd
Project Puteri Field Development Project – Riser and PLEM Field Joints for Petronas
Carigali Sdn Bhd
Scope of Work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill and
Heat Shrink Sleeves (HSS) for riser field joint.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 19
Year 2007 - 2008
Client Det Norske Veritas AS, Vietnam (DNV)
Scope of Work Provision of Services for Civil Engineer.

Year 2007 - 2008


Client Germanischer Lloyd Industrial Services (GL Vietnam)
Project Block 9 – 2, CNV Oilfield Project for Hoan Vu Joint Operating Company
(HVJOC).
Scope of Work Provision of QA/QC Engineer.

Year 2007 - 2008


Client Bureau Veritas Thailand
Project Pipeline Installation Project for Total E & P Myanmar
Scope of Work Provision of Inspection Personnel – Safety Officer.

Year 2007 - 2008


Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Northern Field Development Project (BOA).
Scope of Work Provision of Coating Inspector.

Year 2008
Client Germanischer Lloyd (Malaysia) Sdn. Bhd.
Project Bunga Orkid – A, Central Processing Platform.
Scope of Work Provision of Safety Officer.

Year 2008
Client Swiber Offshore Construction Pte. Ltd.
Project Puteri Field Development Project for Petronas Carigali Sdn. Bhd.
Scope of Work Provision of Inspection Personnel - QA/QC Services for Pipeline Installation.

Year 2008
Client Barmada McDermott
Scope of Work Provision of Inspection Personnel for QA/QC Services of G7 CRA Pipe
Receiving Inspection for Sarawak Shell Berhad.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 20
Year 2008
Client Barmada McDermott
Scope of Work Provision of Inspection Personnel for SADERI Project for Sarawak Shell
Berhad.

Year 2008
Client Kencana HL Sdn Bhd
Project Sarawak Gas Development Project – Field Joint coating for pre-installed
risers for Murphy Sarawak Oil Co.
Scope of Work Subcontract services for the supply of equipment, personnel and
materials for the application of Heat Shrink Sleeves (HSS) for riser field joint.

Year 2008
Client Swiber Offshore Construction Pte. Ltd.
Project Puteri Field Development Project for Petronas Carigali Sdn. Bhd.
– HDPUF In Fill Coating for the Pipeline Field Joints
Scope of Work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill.

Year 2008
Client Swiber Offshore Construction Pte. Ltd.
Project West and East Field Pipeline Replacement for Brunei Shell Petroleum
– HDPUF In Fill Coating for the Pipeline Field Joints
Scope of Work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill.

Year 2008
Client Swiber Offshore Construction Pte. Ltd.
Project West Madura and Poleng Fields for Kodeco, Indonesia – HDPUF In Fill
Coating for the Pipeline Field Joints
Scope of Work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 21
Year 2008
Client Jindal Saw Ltd-Valentine Maritime Ltd
Project Takula Gas Processing Platform for Chevron
Scope of work Subcontract services for the supply of personnel and materials for the
application of HDPUF for riser field joint in-fill.

Year 2008
Client Barmada McDermott
Scope of Work Provision of Inspection Personnel for M3S Pipe Project for Sarawak Shell
Berhad.

Year 2008
Client Kencana HL Sdn Bhd
Project MOC-Golok Substructure
Scope of work Subcontract services for the supply of, equipment, personnel and
materials for the application of HDPUF for riser field joint in-fill and Heat
Shrink Sleeves (HSS) for riser field joints.

Year 2008

Client Swiber Offshore Construction Pte Ltd


Project Hybrid Rentis Pipeline Installation for Murphy Sarawak
24’’x 33KM x 2 lines, 24’’x 2.18KM x 2 lines and 20’’ x 4.2KM
Scope of work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill

Year 2008
Client Germanischer Lloyd Industrial Services (GL Vietnam)
Project Ca Ngu Vang WHP Project for Hoan Vu Joint Operating Company
(HVJOC).
Scope of Work Provision of Safety Personnel - QA/QC Services for Pipeline and Offshore
Operation.

Year 2008
Client J. Ray McDermott Far East Inc (JRMFEI)
Scope of Work Provision of Coating Inspector.

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 22
Year 2008 (Future-Sept 08)

Client Swiber Offshore Construction Pte Ltd


Project North Belut Pipeline Installation for Conoco Philips
22’’ x 10KM, 16’’x 37KM and 10’’x 37Km
Scope of work Subcontract services for the supply of equipment, personnel and
materials for the application of HDPUF for pipeline field joint in-fill

© 2008 OAG Group of Companies - Oil & Gas Division. All Rights Reserved. 23
8. CONTACT DETAILS

OAG Group can be contacted at the following address and contact numbers:

OAG Group of Companies.


Suite 7.15, Level 7,
Wisma Central, Jalan Ampang
50450 Kuala Lumpur
MALAYSIA

Tel. No. : (+603) 2166 1068


Fax.No. : (+603) 2166 2068

E-mail : oag.engineering@oag-group.com
Website : oag-group.com

Managing Director
Name : Jonathan Chong
Mobile No. : +6 016 336 2833
E-mail : jonathan.chong@oag-group.com

Business Development Manager


Name : James Ng
Mobile No. : +6 016 697 5616
E-mail : james.ng@oag-group.com