Documente Academic
Documente Profesional
Documente Cultură
Rating
Single fatality or Permanent Total Disability: From an accident Major Damage: Partial operation loss (2 weeks shutdown
or Occupational illness (poisoning, cancer)
coasts up to $150.000 from $50.000)
Major injury, lost time accident >3 days. e.g. falling from
height.
Minor Damage: Brief dis-ruption (coast less than $5.000 from Minor leak/spill. Public concern. No lasting effect. e.g. condensate
$500)
leak from road tanker.
Slight leak. Spill minimal. Effect contained locally. e.g. leak from a
chemical drum.
Consequence
2 3 4 5
Injury
Multiple fatalities: From an accident or Occupational illness
(poisoning, cancer)
10 15 20 25
12 16 20
12 15
10
Likelihod
Likelihood Rating Guidance Description
Likelihood Guidance
Certain or Imminent
Harm from a hazard is certain or imminent if no control measures are provided at all and/or if one or more of the following factors also apply:a) the hazard is a cause of large numbers of injuries or ill health in national or location statistics e.g. cholera epidemic;
b) people are exposed to the hazard continuously e.g. noise level above 85 dB;
c) safety is not considered high priority by those involved including manager and supervisors. e.g. non adherence to PTW.
Rating
Very Likely
Harm is very likely if the control measures provided depend on an individual using them on every occasion (e.g. personal protective equipment, PTW system) or if training and supervision are
minimal, and/or if one or more of the above factors are present.
Likely
Harm is likely if the control measures provided depend on an individual using them or adjusting them on every occasion (e.g. portable gas detectors, safe working procedures), or if training is
provided and work supervised, and/or if any of the factors given for certain or imminent harm also apply.
May Happen
Harm may happen if control measures include measures that do not depend on the operator but can break down or be removed or defeated (e.g. pressure safety valve), or if there is no defined
system of maintenance or supervision of the control measures. Other factors include hazards, which are a significant cause of injury or ill health, or those to which a number of people are often
exposed.
Unlikely
The circumstances under which harm may happen will reduce to harm being unlikely if there is a defined system of supervision and maintenance, or if training is provided and repeated regularly.
Other factors making harm unlikely include hazards which are a cause of few injuries or cases of ill health, or those to which a few people are occasionally exposed.
JOB STEP
POTENTIAL HAZARD
Transporting of elements to
site.
1.1
Initial Risk
L
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
MTEK A.
Subcontractor
12
Speeding.
1.3
Risk
1.2
Control Measures
(Control measures have been identified using the Hierarchy of
16
Struck by Vehicle
3
12
JOB STEP
POTENTIAL HAZARD
1.4
Initial Risk
L
Risk
Collapse of materials,
struck by material
12
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
MTEK A.
Residual Ris
L
JOB STEP
POTENTIAL HAZARD
3
L
Initial Risk
4
12
C
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
MTEK A.
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
1 4
L
MTEK A.
MTEK A.
Area Work
4
2.1
2.2
2.3
12
JOB STEP
POTENTIAL HAZARD
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
16
MTEK A.
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
16
2.4
Overturning cranes.
2.5
JOB STEP
POTENTIAL HAZARD
Control Measures
(Control measures have been identified using the Hierarchy of
Risk
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Control
Responsibility
MTEK A.
Residual Ris
L
STEP
NO
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
MTEK A.
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
MTEK A.
2.7
12
Wind hazards.
3.1
MTEK A.
JOB STEP
POTENTIAL HAZARD
3.2
3.3
4.1
Initial Risk
L
Risk
Hand injury.
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
12
MTEK A.
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Control
Responsibility
Residual Ris
L
10
JOB STEP
POTENTIAL HAZARD
4.2
4.3
4.4
4.5
4.6
Initial Risk
L
Risk
Improper rigging.
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
MTEK A.
MTEK A.
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
11
JOB STEP
POTENTIAL HAZARD
Installation of temporary
support for frame stability.
5.1
Initial Risk
L
Risk
Hand injury.
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
12
POTENTIAL HAZARD
(Against each step list the potential / risk hazards that
could cause injury / damage when the task step is
performed.)
5.2
6.1
Risk
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Residual Ris
L
MTEK A.
Subcontractor
Damage at goods to be
lifted/Injured body parts
16
6.1.2
6.1.3
6.1.4
6.1.5
6.1.6
6.1.7
6.1.8
JOB STEP
POTENTIAL HAZARD
16
Initial Risk
L
Risk
6.1.9
Subcontractor
Control
Responsibility
Residual Ris
L
14
16
Subcontractor
Control
Responsibility
Residual Ris
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Subcontractor
Subcontractor
Subcontractor
6.2
6.2.2
3
6.3
6.2.3
6.2.4
6.3.1
6.3.2
2
6.3.3
6.3.4
6.3.5
6.4
Unqualified crane
drivers/operators.
2
6.4.1
6.4.2
15
JOB STEP
POTENTIAL HAZARD
6.5
Initial Risk
L
Risk
Sub-standard cranes
2
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
6.5.1
6.5.2
6.5.3
Subcontractor
Residual Ris
L
16
JOB STEP
POTENTIAL HAZARD
6.6
Initial Risk
L
Risk
12
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
6.6.1
6.6.2
6.6.3
6.6.4
6.6.5
6.7
Underrated
slings/hooks/shackles.
6.7.1
6.7.2
3
6.8
12
People/material struck by
swinging loads/crane in motion.
6.8.1
6.8.3
5
6.7.3
6.8.2
Control
Responsibility
10
6.8.4
Subcontractor
Residual Ris
L
Subcontractor
MTEK A.
17
People/material
struck MAKNA
by
MTEK
NAAT TESSAT ELEKTRK KLMA A. .
swinging loads/crane in motion.
Khabat Thermal Power Plant Units 1&2
JOB SAFETY ANALYSIS / RISK ASSESSMENT
STEP
NO
MTEK A.
JOB STEP
POTENTIAL HAZARD
2
L
Initial Risk
5
10
C
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
6.8.5
6.8.6
Control
Responsibility
Residual Ris
1 5
L
18
JOB STEP
POTENTIAL HAZARD
6.9
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
6.9.1
6.9.2
8
6.9.3
6.10
7.1.3
7.2.1
7.2.2
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
7.2
Control
Responsibility
MTEK A.
19
JOB STEP
POTENTIAL HAZARD
7.3
Fall of personnel.
7.4
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
7.2.3
7.3.1
7.4.1
7.4.2
7.4.3
7.4.4
Control
Responsibility
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
20
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
7.5.1
7.5.2
7.5.3
7.5.4
8
Welding works.
8.1
Electrocution.
8.1.1
8.1.2
8.1.3
12
8.1.4
8.1.5
8.1.6
8.1.7
8.1.8
8.2
Control
Responsibility
Residual Ris
L
MTEK A.
MTEK A.
Burn Injury.
12
21
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
12
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
MTEK A.
Residual Ris
L
22
JOB STEP
POTENTIAL HAZARD
8.3
Initial Risk
L
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
MTEK A.
8
8.3.2 Provisions for mechanical ventillation.
8.4
8.5
8.6
Arc rays.
3
Poor housekeeping.
12
23
JOB STEP
POTENTIAL HAZARD
4
L
Initial Risk
3
12
C
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Control
Responsibility
MTEK A.
Residual Ris
1 3
L
9.1
16
MTEK A.
24
JOB STEP
POTENTIAL HAZARD
9.2
Initial Risk
L
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
MTEK A.
MTEK A.
MTEK A.
12
9.4
Risk
9.3
Control Measures
(Control measures have been identified using the Hierarchy of
12
10
16
25
POTENTIAL HAZARD
(Against each step list the potential / risk hazards that
could cause injury / damage when the task step is
performed.)
Risk
16
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Control
Responsibility
MTEK A.
Residual Ris
L
26
11
JOB STEP
POTENTIAL HAZARD
Initial Risk
L
Risk
11.1 Shock,falls,injuries
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Ris
L
MTEK A.
Subcontractor
20
12
Radiography works.
20
27
JOB STEP
POTENTIAL HAZARD
4
L
5
20
Initial Risk
C
Risk
Control Measures
Subcontractor
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
2 5
Residual Ris
L
28
29
30
31
32
33
34
35
36
37
38
39
40
Residual Risk
Risk
41
42
43
44
45
2
46
47
4
48
49
50
51
4
52
53
10
54
55