MUNICIPAL CORPORATION OF DELHI

OFFICE ORDER

In supersession of all previously purchases on the topic described above, permission/License for set up of short-term
components on Roof-Tops/Ground stage of various property for Cellular/Basic Ulefone Be Pure Cellular Phone
Solutions shall be accepted as per the plan accepted by the Organization vide Item no.U.B.No.392 old Sixteenth Goal,
2010, previously accepted by the Position Panel vide Quality No.722 old 09/02/10 and para 25 customized vide in
expectation acceptance from Chair Position Panel old 29.03.10 and Honble Gran (for Corporation) on old 06.04.10,
topic to the following conditions:

1 For set up of Platform Place Antennas, clearances is needed from Worldwide airports Power of Native indian,
DUAC, Primary Flame Official (DFS), ASI & DMRC (wherever applicable).

2 Structural balance certification from any one of the following five organizations are needed to be obtained by the
Cellular and Primary Cellular Operators:(a) Indian Institution of Technological innovation (IIT), Delhi.
(b) Central Developing Research Institution (CBRI), Roorkee.
(c) Rail Native indian Technical & Economic Solutions Ltd.(RITES), Delhi.
(d) National Regulators for Concrete & Developing Material, 34 KM Rock, Delhi Mathura Street, Faridabad
(Haryana).
(e) Indian Institution of Technological innovation (IIT), Roorkeee.

4 In situation of components which were illegal or which may be so announced at a later factor of your energy and
effort, authorization for set up of framework shall be provided on satisfaction of all the conditions. However, that shall
not indicate any change at all in the status of the illegal building and shall be without tendency to the right of MCD to
destroy the said building through the due procedure of law. While challenge such a demolition, MCD will not be
under any responsibility to send before intimation to the proprietor of the framework, nor will it be accountable for
lack of the framework as a impact of demolition of the illegal building. The suppliers shall indemnify MCD to this
impact.

The licensees shall share the systems for solving their specific antennas given that the recommended conditions are
properly satisfied so as to make sure limiting of several systems and improving the use of the current ones.

5
Priority of Selection of website, shall be as under:a. All Community Buildings such as Community Facilities, except educational organizations, medical centers &
shops.
b. Other Government Buildings.
c. Other Non-Residential Buildings i.e. commercial, commercial & institutional components.
d. Along the right of way of major empties after acceptance from DEMS of MCD.
e. Vacant place after acceptance from involved authority.
f. i.) Personal empty story making 3M drawback all around.
ii) Personal components.
Note:- Development of Cellular Tower on residential components shall only be allowed in those cases where no
substitute is available.
iii) Team Housing

6 Fees:
Rs.5 lacs per framework plus.
Rs. 1 lacs per support organization in situation of discussing.


7 For Community Buildings Rs.25/- per sq. ft. monthly shall be billed towards certification fee for the place to be
used for setting up the short-term framework topic to at the least Rs.25,000/- monthly. License fee shall be due for
three several weeks in advance and thereafter by Tenth day of each 30 days.

Any Cellular Owner wanting to hard framework on any Community Developing or place will implement to the place
having organization i.e. to the workplace of ADC(L&E) for Community Buildings and to the Property Division of
Slum & JJ for their components and also perform an contract for certification fee as described above.

The certification fee shall be placed in the workplace of ADC(L&E) and Property Division of Slum & JJ, as the
situation may be:
(i) No argument from the involved department having its management management on the building/land where
erection of Cellular Tower is suggested.
(ii) No argument from Technological innovation Division from architectural protection perspective. In situation, the
Technological innovation Division is not in a position to approve the architectural protection aspect, the same could be
got analyzed by Cellular Operators from the Institutions already recognized and accepted for private components.

Once the contract for certification is joined into, Cellular Owner can implement for a authorization to the EE(Bldg.) of
involved Area, who will procedure the situation for allow of authorization depending on the recommendations released.

8 That Cellular Owner shall be completely accountable for any damage to the property and for public protection.

9 That Cellular Owner shall take special safety measures for fire protection, whitening etc.

10 That Cellular Owner shall provide to Assessor & Enthusiast, MCD a duplicate of the contract implemented
between the Cellular or Primary Telecommunications Owner and the proprietor of the property.

11

12 Generator places set up at the framework website to serve the energy specifications of the aerial should comply
with the disturbance and omission standards and other specifications recommended by DPCC.

That Cellular & basic Telecommunications Operators shall produce a certification from the Producer of D.G. set to the
impact that set set up satisfies the following Requirements and Guidelines as set down in the Noise Contamination
(Regulation and Control) Rules, 2000 as informed by Assistant of state for Environment and Woodlands vide its notice
old Fourteenth Feb, 2000.

NOISE STANDARDS FOR DG SETS (15-500KVA)


The total sound energy, Lw of a DG Set should be less than 94+10 log10(KVA), db(A), at the production stage, where
KVA is the affordable energy ranking of a DG Set.

This stage should fall by 5 db(A) every five year, until 2007 i.e. in 2002 and then in 2007.

13 MANDATORY ACOUSTIC ENCLOUSRE / ACOUSTIC TREATMENT OF ROOM FOR STATIONARY DG


SETS (5 KVA & ABOVE)
Noise from the DG Set should be managed by providing an acoustic property or by dealing with the place acoustically.

The acoustic enclosure/acoustic treatment of the place should be designed for lowest 25 dB(A) placement reduction or
for conference the normal disturbance standards, whatever is on the greater part (if the real normal disturbance is on
the greater side), it may not be possible to check the efficiency of the acoustic enclosure/acoustic treatment. Under

such conditions the efficiency may be examined for disturbance reduction up to real normal disturbance stage, ideally,
in the nightime. The statistic for placement reduction may be done at different points at 0.5m from the acoustic
enclosure/room, and then averaged.

The DG set should also be offered with proper fatigue muffler with placement lack of lowest 25 dB(A). To make sure
the conformity of Guidelines at user end, Cellular Operators will provide noise-monitoring review from DPCC.

14 The Owner shall make sure to prevent the accessibility base station aerial websites for public by appropriate
indicates such as cable walls, securing of the entry to the ceiling etc., accessibility framework website even for
servicing employees should be for a lowest interval as far as possible.

15
Installation of Platform Place Antennas shall be allowed only on:(a) The components which abuts on lowest 9.00 M wide road in order to reduce the threats due to any earth quake or
wind related catastrophe.

(b) The current websites of the Cellular Towers abutting on streets having ROW less than 9.00 M could only be
regularized after the particular acceptance from the Flame Division regarding the size of the way.

16 The Platform Place Antennas should be at least 3m away from the encompassing building and antennas should not
directly face the property. Further, the lower end of the aerial should be at least 3.00 gauge above the ground or
ceiling.

17 In situation of several transmitter websites at a particular area discussing of a common framework facilities,
should be researched, as far as possible which can be synchronized through a nodal organization.

18 Access to Platform Place Antenna websites should be banned for public by appropriate indicates such as cable
walls, securing of the entry to the ceiling etc. Access to framework website, even for the servicing employees, should
be for a lowest interval as far as possible.

19 Sign boards/Warning signs are to be offered at Platform Place Antenna websites which should be clearly
noticeable and recognizable. A red light should be placed at the entry of such zone.

20 The Warning Sign should prevent longer stay in the zone, even for the servicing employees. The indication panel
may contain the following text :
i. Danger ! RF rays, Do not enter.
ii. Restricted Area.
21 The suppliers and servicing employees, who are working with rf devices, specially with Platform Place Antenna
set up on systems and at any other outdoor websites, should be secured from electro-magnetic rays. The operator and
servicing employees working with the rf devices should be properly knowledgeable for possible threats and for taking
actions for protection from electro-magnetic rays when & where needed.

22 Submission of an challenge from the Owner that set up of Cellular Tower does not cause any negative impact to
the wellness of human being of the place and MCD shall be kept safe out of this.

23 The operator shall show on panel (minimum size 24x48) at noticeable place of the property at Ground Floor, the
following information :

(i) Operators name & Deal with


(ii) Contact Persons name, address & Phone Number
(iii) Address of Issue Redressing Regulators with Ulefone Be Touch 2 phone Numbers
(iv) Police Control Space : 100
(v) Fire management Space : 101

(vi) Ambulance : 102


(vii) Any other important info, if any
(viii) Details of insurance policy policy

24 In situation of any problems against such framework construction, the same shall be referred to the workplace of
Director/General Cellular Operators Organization of Native indian and Assistant Common, Organization of Primary
Telecommunications Solutions, to examine the problems and to take helpful actions wherever necessary.

25 The suppliers, who have constructed cell systems without authorization, shall implement to MCD for
regularization within 30 days, as per previously plan in force, before execution of this new plan after acquiring NOC
from ASI & AAI wherever appropriate.

NOC from R.W.A.s shall not be was adament upon and the fee shall be paid as per the new plan. In situation of noncompliance, action for removal of Cellular systems shall be started as per Law. The current systems abutting on streets
having ROW less than 9 Mtrs. shall be regularized after acceptance of the Flame Division.

26 Identification of the sites:For providing of any NOC, a suggestions is to be given by TRAI to the fact that the suggested framework is basically
needed at the site/vicinity as the closest framework of this organization is current at a distance of .M. and no
discussing of framework with other organization is available. In situation of residential components, it shall also be
qualified that no other substitute is available with the support organization.

27 NOCs:

(i) In situation of group property residential building, NOC from all the citizens of the property prevent alongwith the
NOC of the community is needed.
(ii) (a) In situation of the plotted residential building possessed by different floor entrepreneurs, NOC from all the
ground entrepreneurs is needed.
(b) In situation of rental hold property NOC of lessor is needed.
(iii) In situation, building abuts on road having less than 9 M ROW, NOC from Flame Division is needed.

28 Application:

(a) Before erection of Cellular Tower, program shall be authorized together by the owner(s) of the property & the
Cellular Service Company Co. Copy of contract between the support organization organization & the proprietor shall
also be presented alongwith the program.
(b) In situation of the Community components, NOC of the Head of the Department/Land & Property Deptt. under
whose authority building or place is located is needed.
(c) The program shall be authorized under the trademark of Designer, authorized with the Regulators of Structure who
will approve that the suggested framework is safe in all regard. Alongwith the architectural design computation on the
basis of which certification is being released for record purpose.
(d) Erection of framework shall only be allowed only on regularized components.
(e) A certification on affidavit shall be presented by the support organization organization that erection of the
suggested framework is not harmful to the wellness of the encompassing citizens.
(f) Permission shall only be provided to the companies who have certification form Telecom Division, Government.
of Native indian.
(g) The support organization organization shall provide 3rd party insurance policy and information of the plan plan
shall be portrayed on the show panel.
(h)
(i) The NOC shall be got restored on transaction of essential fee every 5 decades.
(ii) The Towers current more then 5 decades are also needed to be restored within one 30 days. On transaction of
essential fee.
(iii) MCD supplies its right to take out authorization whenever you want without giving any reason.


(i) The erection of the framework shall be completed within 3 several weeks from allow of NOC and review of
erection be made to the Developing Deptt. of the involved Area.

29 Revised recommendations shall be prepared a chance to time paying attention to the international standards &
technology.