Sunteți pe pagina 1din 3

AFCM

PRELIMINARY REPORT
DATE: 27TH FEB 2015
Customer Name: ERB West Platform, Petronas Carigali Sdn Bhd (SBO)
Status of Call: Contractor

Instruction From: En. Agku Suffian B Pg A. Razak


NATURE OF WORK

Problem Reported:
Please refer to details below.
System Down: Yes / No

Inspection Type:
Routine Vibration Survey

Call Reported by: Muhammad Harizuan/Mohd Fazli Jaafar/Muhammad Nizamuddin

Time: Day

Location of Inspection: All Area


SERVICE DETAILS
Service Rendered:
Routine vibration survey on Rotating Machineries.
Background:
February 15 routine visit.
DIAGRAM
Analysts Summary Report:
Review has been completed on below list of machine:
1.0 Event Logs:
1.

REINJECTION COMPRESSOR
i.
ii.
iii.

2.

COOLER FAN (EWGA)


i.
ii.
iii.
iv.
v.
vi.

3.

E-6270 :- Normal
E-6290 :- Highest vibration at Fan Gearbox NDE Vertical axis.
* Full diagnosis report will be provided.
E-6320 :- Normal
E-6340 :- Normal
E-6370 :- Normal
E-6390 :- Normal

EWAC GAS COMPRESSOR


i.

4.

K-6260 :- Under commissioning


K-6310 :- Normal
K-6360 :- Normal

K-2410 :- Normal

COOLER FAN (EWDPA)


i.

ii.
iii.
iv.

1|Page

E-2420 Unit A :-Highest vibration at Motor NDE Horizontal axis is increased from previously 7.00mm/s to 12.83mm/s. This motor is running
in Zone D within this zone is normally considered to be of sufficient severity to cause damage to the machine.

* Full diagnosis report will be provided.

E-2420 Unit B :- Normal


E-2450 Unit A :- Normal
E-2450 Unit B :- Normal

5.

GAS GENERATOR
i.
ii.
iii.

6.

LUBE OIL COOLER FAN


i.
ii.
iii.

7.

P-802
P-803
P-804
P-805

::::-

Normal
Standby
Normal
Normal

INSTRUMENT AIR COMPRESSOR


i.
ii.
iii.

9.

G-6590C :- Normal
G-6600C :- Normal
G-6610C :- Normal

COT PUMP
i.
ii.
iii.
iv.

8.

G-6590 :- Trending vibration level show gradually increase.


* Full diagnosis report will be provided.
G-6600 :- Normal
G-6610 :- Normal

K-5455 :- Normal
K-5430 :- Normal
K-6645 :- Normal

GLYCOL PUMP
i.
ii.
iii.
iv.

P-6205
P-6215
P-6110
P-6120

::::-

Unable
Unable
Unable
Unable

to
to
to
to

measure
measure
measure
measure

due
due
due
due

to
to
to
to

blasting
blasting
blasting
blasting

activity
activity
activity
activity

10. DIESEL FIRE WATER PUMP


i.

P-6530 :- Standby

11. STANBY DIESEL GENERATOR


i.

G-6720 :- Standby

2.0 Preliminary Recommendations:


1.

E-6290
- Refer to diagnosis report.

2.

E-2420 Unit A
- Refer to diagnosis report.

3.

G-6590
- Refer to diagnosis report.

3.0 Summary:
3.1 CBM has completed routine survey on ERB West Platform.
3.2 Based on the preliminary results, only 3 machines were found with significant vibration level which required further action.
3.3 The full report will be released within 7 working days after visit completion.

2|Page

Status after Service:


(Please circle)

Complete/ Incomplete/Under Observation/


Working solution provided
Events for Tomorrow:
None

Start of Service:
9th Feb 2015

End of Service:
23th Feb 2015

PERSONNEL INVOLVED:
1)
2)
3)

Muhammad Harizuan Bin Harudin - CBM Tech


Mohd Fazli Jaafar - CBM Tech
Muhammad Nizamuddin Bin Mazlan - CBM Tech
PLEASE RATE THIS CALL BY TICKING AN OPTION
Extremely Satisfied

Satisfied

Dissatisfied

Annoyed

CUSTOMER FEEDBACK
Remarks:
Name :

Designation:

Phone/Fax:

Date:

Place:

Email:
Signature: