Sunteți pe pagina 1din 8

Method Statement

and Risk
Assessment for
General Stone
Masonry including
Dry Stone Walling

Issue 01

-1

Contents of Method Statement

1.

Scope and method of work

2.

Project organisation for health and safety control

3.

Health and safety risk control / Assessment

4.

Workplace access and egress

5.

Workplace lighting

6.

Plant and equipment

7.

Personnel training certification

8.

Hazardous materials and substances

9.

Waste management

10. Special control measures


11. Contact Numbers
12.
Issue 01

Communication of Method Statement


-2

1. Scope and method of work


The method statement relates to the safe way in which T.Moore Stone Masons will
conduct Stone Masonry work in a safe and proper manner.
Method of Work
Stages of the work we will be undertaking
Arrival on site.
Get to place of work. The area will be assessed to ensure a safe route is
possible. Vehicles will be parked in the correct location and where required
High Visibility clothing will be worn at all times.
Steel toe capped boots will be worn at all times.
Any equipment and stone brought onto site will be unloaded in a safe area and
near the area of work.
An area for waste will be established and any waste materials generated will
be kept in this area. Waste materials will be removed off site by T.Moore Stone
Masons unless it is agreed with the client that their waste facilities can be
used.
Gloves will be worn when handling and transporting any materials.
Foundations / footings may need to be dug. This will either be done manually
by spade or for large areas by mechanical digger. Only suitably trained
operatives will use mechanical equipment.
Stones will be lifted into the correct position. Heavy or awkward shaped
stones will be lifted by two people.
Stones may require some cutting. In which case a stihl saw is used. All
operatives will be suitably trained in using a stihl saw safely. Dust mask and
eye protection will be worn when using the saw.
The job may require cement to be mixed. In which case gloves will be worn.
The cement will either be mixed manually or by machine. If a machine is used
then the operator will be suitably trained to operate it safely.
Once the job is completed all waste will be removed from site
Any issues that arise during the job will be discussed with the client before
continuing.

Issue 01

-3

No work will be started if there is a risk to the health and safety of ant
T.Moore Stone Masons staff or subcontractors or any other contractors or
visitors who maybe on site.

2. Project Organisation for Health and Safety Control


All T.Moore Stone Masons staff will be fully trained in the work they are doing. They
can contact T.Moore at any time.
Title

Name

Contact No

Stone Masons and Company


owner
Stone Mason

Thomas Moore

07855863942

Joe Bloggs

12345678910

All stone masonry work will be overseen by T.Moore. All staff report to him and are
instructed to report any Health and Safety issues immediately.
All staff and subcontractors will receive a copy of this method statement and will
work in accordance to it.

Issue 01

-4

3. Health and Safety risks and controls / Assessment


Task

Building and repair of dry stone walling and


general stone masonry

Assessment covering

T.Moore Stone Masons and all their


employees and sub contractors.

T.Moore Stone Masons will turn up to site and perform stone masonry work,
such as dry stone walling. This is the core business of T.Moore Stone
Masons and all employees are well experienced in this task which they do
on a daily basis.

Description of task and frequency

Task

Describe Hazard and possible Harm

Describe who
might be harmed

List ALL existing controls

Lifting / Transporting
stones

Failure to lift stones correctly could result in


serious muscular damage or impact damage
from dropping the stones

All T.Moore Stone


Masons staff

Wherever possible stones are lifted by mechanical


means.

Risk Rating
Likelihood X consequence
L
C
RR
2
3
6

Further Action Required


.None

Heavy stones will always be lifted by two people.


All staff have General Manual Handling Training

Lifting /Transporting
Stones

Sharp edges and awkward shaped stones


could cause cuts to hands

All T.Moore Stone


Masons staff

All staff will wear suitable PPE to include steel toe


capped boots
Gloves will be worn whilst lifting and transporting
stones

Moving around site, often


uneven/ wet ground

Uneven or wet ground could easily cause slips


and trips.

All T.Moore Stone


Masons staff

All staff are responsible for ensuring they have safe


access to the walling area.

None

None

None

Correct footwear will be worn at all times with good


grip. Worn out boots will be replaced as required

Dressing Stone

Chips from stones could get into the eyes or


hit the face and cause cuts. Stone dust could
cause inhalation problems

All T.Moore Stone


Masons staff

Area will be kept as clear as possible with designated


area for stacked stones.
safety glasses will be worn whilst dressing stone
Dust mask will be worn when cutting stone.

Scoring System. Likelihood 1=Highly Unlikely through to 5=Very Likely to happen. Consequence 1= Very Minor accident requiring no first aid through to 5= Fatal Accident
RR = 1-5 Acceptable (no further action), 6-9 Ok to work but try to improve 10-16 Improve before starting work, 20 25 DO NOT undertake any work until extra controls put into place.

Issue 01

-5

Task

Describe Hazard and possible Harm

Describe who
might be harmed

List ALL existing controls

Risk Rating
Likelihood X consequence
L
C
RR

Further Action Required

Working in adverse
weather conditions.

The sun could cause sunburn /skin


cancer if working for long periods outside.
Also the cold and wet weather could
serious health issues such as
hyperthermia.

All T.Moore
Stone Masons
staff

All staff will take frequent rest breaks in


adverse weather. Protection from the sun /rain /
cold can be obtained by sitting in the van/vehicle.

None

On hot sunny days sun hats/caps will be worn


and sun cream will be applied to protect the skin.
In cold or wet weather correct protective PPE
will be worn at all times.

Dealing with Accidents

Failure to get emergency help or issue


first aid could make any injury worse.

All T.Moore
Stone Masons
staff

Using Machinery

Stone masonry does not require much


use of powered machinery however stihl
saws and cement mixers maybe used.
These can cause serious cuts or
entanglement injuries.

All T.Moore
Stone Masons
staff

All staff carry a mobile phone to get help if


required
First aid kit carried in all vans
Any staff who operate the machinery will have
the correct training for such machinery.

None

None

If the machinery is broken or damaged in any


way it will not be used.
PPE will be worn at all times

Use of chemicals

Cement, Lime and petrol are all handled


and used. These can cause contact
burns and in the case of petrol is highly
flammable.

All T.Moore
Stone Masons
staff other
contractors or
people on site.

Replacement blades for stone cutters will be


replaced as and when required and only by
trained staff.
A Chemical assessment will be completed for
each chemical used.
Overalls and gloves will be used when
handling cement and lime.
All chemicals will be stored correctly. Petrol will
be stored in a metal storage can designed to
hold petrol.

Scoring System. Likelihood 1=Highly Unlikely through to 5=Very Likely to happen. Consequence 1= Very Minor accident requiring no first aid through to 5= Fatal Accident
RR = 1-5 Acceptable (no further action), 6-9 Ok to work but try to improve 10-16 Improve before starting work, 20 25 DO NOT undertake any work until extra controls put into place

Issue 01

-6

None

4. Workplace access and egress


Access and egress to site will be provided by the customer.
Access around egress around the site will be assessed before starting work to ensure
it is safe.
5. Workplace Lighting
Generally work is outside and natural light it suitable to do the task.
6. Plant Equipment
PPE
All PPE provided by T Moore Stone Masons will conform with the relevant EN
number and be fit for purpose.
Electrical Equipment
It is not anticipated electrical equipment will be required for this work.
Lifting Equipment
It is not anticipated that the job will require any form of load bearing equipment.
General Equipment
The following Equipment will be used as part of the job

Cement Mixer
Stihl Saw

7. Personnel Training Certification


All T.Moore Stone masons staff have CSCS cards
All staff have had manual handling instruction.
8. Hazardous Material and Substances
Three hazards substances maybe used during the work. A chemical risk assessment
has been completed for each one.
Cement and lime
Gloves and protective clothing will be worn at all times when handling when cement
Petrol
This will be stored in suitable metal containers. Petrol is only used to power
equipment listed above.

Issue 01

-7

9. Waste Management
All waste generated will be removed off site by T.Moore Stone Masons unless it is
agreed with the client that there waste disposal maybe used.
10. Special Control Measures
It is not anticipated any special control measures are required.
11. Contact Details
Emergency Services
Fire/ Ambulance
Company Owner
Stone Mason

999 or 112 from mobile or landline


T.Moore
Joe Bloggs

07855863942
12345678910

12. Communication of Method Statement


Details below show that person involved with of the method statement and understand
their responsibilities within this document.
The method statement has been talked through with T.Moore Stone Masons staff
and subcontractors.
All employees or sub contractors who do not work to this method statement when
doing work on behalf of T Moore Stone Masons will be removed from site.
Employee Name (print)

Issue 01

Signature

Date

-8