Documente Academic
Documente Profesional
Documente Cultură
By :
LUKAS UTOJO WIHARDJO
FREELANCER
OPEN HOLE
WELL LOG
INTERPRETATI
ON :
LITHOLOGY,
POROSITY &
SATURATION
Cement
Evaluation
SATURATION
PEN
HOLE WELL LOG
MONITORING
PRODUCTION
LOGGING
WATER FLOW
LOGGING
Zonal Hydraulic-isolation
Gas Zone
Prevents
Oil
Zone
Shale
Zone
Water
Zone
Casing
Oil
Zone
It will potentially
create :
Mixing of unwanted fluids
Fluids escaping to surface
Casing
Casing Corrosion
Casing Collapse
Environment Descriptions
Fluid filled Annulus
Top of Cement
Micro-Annulus
b
Double Casing
To Evaluate Cement
Job
Check Integrity of Cement
Oil
Zone
Water
Zone
Casing
[ by performing a SQUEEZE]
Where is the Top of the
Cement ?
CBL-VDL
Cement Bond Logging
Physics of Measurement
Good
Bond
3 ft
R3
R5
5 ft
T0
|--- Resulting Sound--|
Time
ms
- T0 : Firing Pulse
- Resulting Sound wave : as
recorded at the Receivers
Tx
3 ft
R3
R5
Sound to Signal
Magnetostrictive transducer (Tx)
A high current is passed through a coil surrounding a magnetic
material introducing a strain and causes a ticking sound (Joule effect)
DL / L
Piezoelectric transducer
(Rx)
voltage
NMSG
CBLG
NMSG
CBLG
AMSG
SGW
SGCW
Amplitude is CBSL,
Tx
R3
R5
5 ft
time
Slowness
Slowness =
time
=
velocity
distance
= 57 msec/ft
= 75 msec/ft
100 msec/ft
189 msec/ft
Z1
Z2
r: density of material
Water
Steel
Cement
Sound
V: velocity of sound
on that material
The amount of sound transmitted between two different
materials depends on their
acoustic impedance difference
CASING ARRIVALS
TRAVEL TIME
DT Casing = 57 msec/ft
DT Cement = 75 msec/ft
DT Formation 100 msec/ft
DT Fluid
189 msec/ft
265.5 ms
FORMATION ARRIVALS
TRAVEL TIME
TTF
DT Casing
DT Cement
DT Formation
DT Fluid
= 57 msec/ft
= 75 msec/ft
100 msec/ft
189 msec/ft
419.5 ms
FLUID ARRIVALS
TRAVEL TIME
DT Casing
DT Cement
DT Formation
DT Fluid
TTf = FLUID
= 3 ft x 189 ms/ft
567.0 ms
= 57 msec/ft
= 75 msec/ft
100 msec/ft
189 msec/ft
[ms]
[mV]
TT
200 0
[ms]
CCL
GR
CBL
[mV]
100 200
VDL
[ms]
1200
[ms]
[mV ]
Threshold
TT TT
DT
Stretching
E1
T0
Threshold
TT TT
DT
TT Cycle Skipping
E1
T0
E3
Threshold
TT
TT
E2
TRANSIT
TIME
CBL
AMPLITUDE
NORMAL
HIGH
Casing Arrivals
Usually No Formation
Arrivals
NORMAL to
HIGH /
NOISY
LOW
No Casing Arrivals
Formation Arrivals
NORMAL to
HIGH
CAN BE
NOISY
LOW
No Casing Arrivals
No Formation Arrivals
NORMAL
MEDIUM to
HIGH
Microannulus
NORMAL
MEDIUM to
HIGH
Formation Arrivals
Casing Arrivals
Channeling
NORMAL
MEDIUM to
HIGH
Formation Arrivals
Casing Arrivals
Fast Formations
LOW
HIGH
Formation Arrivals
No Casing Arrivals
Eccentered Tool
LOW
LOW
DEPENDS
Free Pipe
VDL
If no Casing-Cement bond,
CBL Interpretation
100
Perfect
Chevron Patterns
Depth Match
Chevron Patterns
will be low
CBL: Free Pipe
CBL: Good Bond
GR
WF1 VDL
(Standard VDL)
WF2 VDL
GR
CCL
WF1 VDL
(Standard VDL)
WF2 VDL
Formation Arrivals
Transit Time
Low
with some
Stretching
<----------------------------------------CBL Amplitude
X
No
Casing Arrivals
Irregular Bond
5
contaminated cement in an
interval, the poorer the bond
If cement job is not perfect,
the amplitude is less
attenuated
Stable
Medium
Transit Time
<------------------------------CBL Amplitude
X
Strong
Casing Arrivals
No
Formation Arrivals
Transit Time
X
Low
with some
<----------------------------------------CBL Amplitude
Cycle
No
Skipping
Casing Arrivals
X
Micro Annulus
5
Cement
Caused for instance by contraction of
casing after cement sets if Casing Fluid is
changed
E1 amplitude resembles a poorer bond
than actual
Only a pressure pass can be done to
eliminate the micro annulus
CBL: Poor Bond
Tool Eccentering
5
Damaged Casing
Unbalanced sound paths
Consequences
Eccentering Analysis
Resulting Waveform
T0
Short Path
Normal Waveform
Waveform
Threshold
TT
Delayed Waveform
not recoverable
in Playback
amplitude
Fast Formation
5
will be affected
Fast Formation
arrival.
FAST FORMATION
Transit Time
High
Shorter than
<----------------------------------------CBL Amplitude
Casing
on areas of
arrivals
fast formation
<----------------------------------------
arrivals
BOND INDEX
BI =
Attenuation in best Cemented Section [dB/ft]
Bond Index
CBL
Quantitative
Interpretation
M1 Chart
Casing Data
O.D. 7, 29 lbm/ft
Casing Thickness
[from tables] .408 in
Cement Compresive
Strength
3000 psi