Documente Academic
Documente Profesional
Documente Cultură
Chetak SA316B
VT-EGP
Inspections
MGB oil drained and replaced with new Oil
25 Hrs./ 15 days inspection
50 Hrs. / 30 days inspection
25 Hrs./ 15 days inspection
100 Hrs/ 180 Days inspection
25 Hrs./ 15 days inspection
100 Hrs/ 180 Days inspection special for C Of A
50 Hrs. / 30 days inspection
Tail gear box oil changed replaced with fresh oil
25hrs/15days inspection
50hrs/30days inspection
200 Hrs / 1 year inspection
Duplicate inspection carried out after 200 hrs inspection
Cabin Fire Ex Removed, re-weighed and installed back
25hrs/15days inspection
50hrs/30days inspection
25hrs/15days inspection
50hrs/30days inspection
100hrs/180days inspection
Duplicate inspection of main rotor and tail rotor control
25hrs/15days inspection
MGB oil drained and replaced with new Oil
After Removal of & installation of main rotor sleeve, Duplicate
inspection is carried out.
50hrs/30days inspection
Duplicate inspection of controls after co-pilot control installation
25hrs/15days inspection
Date
10/05/2012
15/05/2012
22/05/2012
28/05/2012
03/06/2012
08/06/2012
15/06/2012
16/06/2012
17/06/2012
01/07/2012
15/07/2012
23/07/2012
23/07/2012
28/07/2012
07/08/2012
14/08/2012
23/08/2012
31/08/2012
09/09/2012
09/09/2012
23/09/2012
24/09/2012
27/09/2012
02/10/2012
13/10/2012
17/10/2012
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
VT-EGP
25hrs/15days inspection
50hrs/30days inspection
400 Hrs/ 2 years inspection
Duplicate inspection carried out after 400 hrs inspection
5 Hrs inspection carried out after 400 Hrs inspection
25hrs/15days inspection
MGB oil drained and replaced with new Oil
50hrs/30days inspection
Tail gear box oil changed replaced with fresh oil
25hrs/15days inspection
50hrs/30days inspection
100hrs/180days inspection
25hrs/15days inspection
MGB oil drained and replaced with new Oil
50hrs/30days inspection
Cabin Fire Ex Removed, re-weighed and installed back
25hrs/15days inspection
50hrs/30days inspection
25hrs/15days inspection
200 Hrs / 1 year inspection
Duplicate inspection carried out after 200 hrs inspection & co-pilot
controls installation.
25hrs/15days inspection
50hrs/30days inspection
25hrs/15days inspection
100hrs/180days inspection
27/10/2012
31/10/2012
21/11/2012
21/11/2012
22/11/2012
29/11/2012
29/11/2012
08/12/2012
08/12/2012
19/12/2012
26/12/2012
02/01/2013
18/01/2013
18/01/2013
25/01/2013
25/01/2013
08/02/2013
22/02/2013
10/03/2013
10/03/2013
10/03/2013
20/03/2013
29/03/2013
05/04/2013
02/05/2013
VT-EGP
Inspections
Date
23.07.2011
22.08.2011
20.09.2011
20.10.2011
20.11.2011
20.12.2012
08.01/2012
11.01.2012
19.01.2012
18.02.2012
18.03.2012
18.04.2012
10.
11.
12.