Scheduling/Leveling Report - 05-Jun-15 - PM.

exe
===============================================
Default Project..................................................EC00515
Projects:
EC00515.........................................................
.City Center Office Building Addition
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Success
or Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Total F
loat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................71
# Not Started....................................................55
# In Progress....................................................3
# Completed......................................................13
# Relationships..................................................105
# Activities with Constraint.....................................0
Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
EC00515 Activity:
EC1010 Start Office Bui
lding Addition Project
Activities without successors....................................3
Project:
EC00515 Activity:
EC1410 Begin Structural

Phase
Project:

EC00515 Activity:

EC1590 Close-In Phase B

Project:

EC00515 Activity:

EC1860 Building Additio

egins
n Complete
Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0
Milestone Activities with invalid relationships..................0
Finish milestone and predecessors have different calendars.......0
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................71
# Relationships with other projects..............................12
Data Date........................................................01-May11
Earliest Early Start Date........................................01-May11
Latest Early Finish Date.........................................23-Jul13
Number of float paths............................................10
Exceptions:
----------Critical Activities..............................................19
Project:
EC00515 Activity:
EC1190 Prepare and Soli
cit Bids for Heat Pump
Project:
EC00515 Activity:
EC1240 Review Bids for
Heat Pump
Project:
EC00515 Activity:
EC1270 Award Contract f
or Heat Pump
Project:
EC00515 Activity:
EC1290 Fabricate and De
liver Heat Pump and Controls
Project:
EC00515 Activity:
EC1650 Set Heat Pump
Project:
EC00515 Activity:
EC1660 Connect Equipmen
t
Project:
EC00515 Activity:
EC1670 Relocate HVAC Ch
iller
Project:
EC00515 Activity:
EC1680 Startup and Test
HVAC
Project:
EC00515 Activity:
EC1690 Rough In Complet
e
Project:
EC00515 Activity:
EC1700 Drywall in Offic
es
Project:
EC00515 Activity:
EC1740 Install Ceiling
Grid
Project:
EC00515 Activity:
EC1790 Install Floor an
d Carpeting
Project:
EC00515 Activity:
EC1800 Finish Carpentry
and Millwork
Project:
EC00515 Activity:
EC1810 Install Plumbing
Fixtures
Project:
EC00515 Activity:
EC1820 Touch-up and Cle
an-up
Project:
EC00515 Activity:
EC1830 Test and Balance
HVAC Equipment

Project:

EC00515 Activity:

EC1840 Finishes Complet

Project:
Project:

EC00515 Activity:
EC00515 Activity:

EC1850 Punch List


EC1860 Building Additio

e
n Complete
Activities with unsatisfied constraints..........................0
Activities with unsatisfied relationships........................0
Activities with external dates...................................0
Activities that are not on any float paths.......................31
Project:
EC00515 Activity:
EC1010 Start Office Bui
lding Addition Project
Project:
EC00515 Activity:
EC1030 Review and Appro
ve Designs
Project:
EC00515 Activity:
EC1040 Assemble Brick S
amples
Project:
EC00515 Activity:
EC1050 Assemble Technic
al Data for Heat Pump
Project:
EC00515 Activity:
EC1060 Assemble and Sub
mit Flooring Samples
Project:
EC00515 Activity:
EC1070 Review and Appro
ve Brick Samples
Project:
EC00515 Activity:
EC1080 Review and Appro
ve Flooring
Project:
EC00515 Activity:
EC1090 Begin Building C
onstruction
Project:
EC00515 Activity:
EC1100 Site Preparation
Project:
EC00515 Activity:
EC1160 Review Technical
Data on Heat Pumps
Project:
EC00515 Activity:
EC1170 Prepare and Soli
cit Bids for Flooring
Project:
EC00515 Activity:
EC1180 Prepare and Soli
cit Bids for Brick Exterior
Project:
EC00515 Activity:
EC1220 Review Bids for
Brick
Project:
EC00515 Activity:
EC1250 Review Bids for
Flooring
Project:
EC00515 Activity:
EC1260 Award Contract f
or Brick
Project:
EC00515 Activity:
EC1280 Deliver Brick
Project:
EC00515 Activity:
EC1300 Award Contract f
or Flooring
Project:
EC00515 Activity:
EC1310 Fabricate and De
liver Flooring
Project:
EC00515 Activity:
EC1330 Install Undergro
und Electric Conduit
Project:
EC00515 Activity:
EC1380 Foundation Phase
Complete
Project:
EC00515 Activity:
EC1410 Begin Structural
Phase
Project:
EC00515 Activity:
EC1440 Set Mechanical a
nd Electrical Equipment
Project:
EC00515 Activity:
EC1460 Erect Stairwell
and Elevator Walls
Project:
EC00515 Activity:
EC1470 Concrete Basemen
t Slab
Project:
EC00515 Activity:
EC1490 Rough-In Phase B

egins
Project:

EC00515 Activity:

EC1500 Install HVAC Duc

Project:
Rails and Equipment
Project:
Window Frames
Project:
Doors and Windows
Project:
egins
Project:

EC00515 Activity:

EC1520 Install Elevator

EC00515 Activity:

EC1560 Install Door and

EC00515 Activity:

EC1580 Install Exterior

EC00515 Activity:

EC1590 Close-In Phase B

EC00515 Activity:

EC1630 Insulate Ducts

ts