Republic of the Philippines

Department of Education
Region V
Division of Sorsogon

TALAONGA NATIONAL HIGH SCHOOL


Sta. Magdalena

SESSION PLAN IN TLE


Sector
Qualification Title
Unit of Competency/ Lesson
Module Title
Date

: Industrial Arts
: ELECTRICAL INSTALLATION & MAINTENANCE
: Install electrical lighting systems on auxiliary outlets and lighting fixtures
: Installing electrical lighting systems on auxiliary outlets and lighting fixtures
: January March 2015

Learning Outcomes

LO1. Lay out and install electrical wiring using knob and tube method.
LO 2. Lay out and install PVC raceway/molding.
LO 3. Lay out and install rigid non-metallic conduit.
LO 4. Lay out and install flexible non-metallic conduit.
LO 5. Assemble fluorescent lighting fixtures.
LO 6. Lay out and install fluorescent lighting fixtures.
LO 7. Lay out and install incandescent lamps.
A. Introduction
This module covers the knowledge, skills, and desirable attitudes required in installing the lighting fixtures Specifically, this module covers
installation of knob and tube, Polyvinyl Chloride conduit (PVC) raceway/molding, rigid nonmetallic conduit, flexible non-metallic conduit,
fluorescent lighting fixtures, and incandescent lamps.
B. LEARNING ACTIVITIES
LO5. Assemble fluorescent lighting fixtures.

Learning Content

Method

1. Principle and operation Self-Paced Instruction


Modular
of fluorescent lamp
Computer Based
Learning
2.

Parts and functions of Self-Paced Instruction


Modular
fluorescent lighting
Computer Based
fixtures

Presentation

Practice

Read

Information

Sheet

5.1-1

Principle

Answer Self Check 5.1-1

on

Feedback
Compare to answer

Info Sheet, Answer

key 5.1-1

Sheet/Answer Key

and

operation
fluorescent lamp
Read Information

Resources

e-learning

of

software
Answer Self Check 5.1-2

Sheet 5.1-2
Perform Task Sheet 5.1-1

e
7:30
8:30
am

Compare to answer

handouts
Info Sheet, Answer

7:30

key 5.1-2

Sheet/Answer Key

Evaluate with

Task Sheet

Performance Criteria

Activity Sheet

Checklist 5.1-1

e-learning
software
1 set Fluorescent
Lamp
Pliers
Screw Driver.
Long Nose Plier
Multi-tester

LO 6. Lay out and install Compact fluorescent Lamp.

Tim

8:30
am

1.

Lay outing and

installing Compact
fluorescent Lamp.

Self-Paced Instruction
Modular
Computer Based
Learning

Watch Video

Answer Self Check 6.1-1

presentation of
Installing CFL
controlled by a two
(2) SPDT or (single
pole- double throw)
switch

Perform Job Sheet 6.1-1


Install three (3)
fluorescent lamp
controlled by three (3)

Compare to answer

Job Sheet,

7:30

key 6.1-1

Video presentation

handouts
Evaluate with

CFL, electrical

Performance Criteria

Tools, wires,

8:30
am

Checklist 6.1-1

SPST switch using


Flexible Non-metallic
Conduit.
Perform Job Sheet 6.2;
Install two (2) fluorescent
lamp controlled by two (2)
three way-switch and One
(1) SPST switch using
Flexible Non-metallic
Conduit.

LO 7. Layout and install incandescent lamp.


1. The Incandescent Light Self-Paced Instruction
Modular
Bulb
Computer Based
Learning

Read

Information

sheet 7.1 about the


history

and

development
incandescent lamp

of

Answer the Self-check 1-3


Perform Job Sheet 7.1;
Installation of
incandescent lamp using
Rigid Non-metallic
Conduit.

c. Assessment Plan

Check your answer

Job Sheet,

7:30

by using the answer

Video presentation

key.

handouts

Incandescent
Evaluate with

Lamp, electrical

Performance Criteria

Tools, wires,

Checklist 6.1-1

8:30
am

A. Written Test on:


a) Fluorescent Lamp
b) Parts and Functions of FL
c) Types of FL
d) Incandescent lamp
B. Demonstration with Oral Questioning / Interview
C. Teachers Self-Reflection of the Session

LO 6. Lay Out and Install Fluorescent Lighting Fixtures

ASSESSMENT CRITERIA:
1. Materials, tools, and instruments are prepared in accordance with the
job requirements.
2. Functionality of fluorescent lighting fixtures is checked and tested in
accordance with the plan specifications.
3. Fluorescent lighting fixtures are installed in line with the job
requirements.
4. Switching control is applied in accordance with the work plan.
5. Workplace is cleaned and made safe upon completion of the job.

CONTENTS:
Preparation of materials, tools and instruments
Application of switches in controlling lights
Procedures of mounting/installing of recessed/surfaced fluorescent
lighting fixtures
CONDITIONS:
The following resources are needed:

Tools
linemans pliers
long nose pliers
Philips
screwdriver
flat screwdriver
gimlet
hammer
metric rule
level bar
try square

METHODOLOGIES:
Group Discussion
Demonstration
ASSESSMENT METHODS:

Supplies and
Materials
electrical tape
switches
fluorescent
fixtures
wires
Learning
Materials
learning
elements

books
manuals
wiring plan
Equipment
Supplies
wiring booth
multi-tester
Personal
Protective
Equipment
(PPE)

Demonstration
Written test

LO 5: Assemble Fluorescent Lighting Fixtures


ASSESSMENT CRITERIA:

1. Fluorescent lighting fixtures are identified and described according to the


specifications.
2. Parts and functions of fluorescent fixture are explained.
3. Sizes, shapes, and ratings of fluorescent lighting fixtures are identified and
described.
4. Schematic diagram of fluorescent lighting fixtures is interpreted.
5. Tools, instruments, and materials are selected in line with the job requirements.
6. Fluorescent lighting fixtures are assembled in line with the job requirements.
7. Fluorescent lighting fixtures are wired according to the schematic diagram.
8. Workplace is cleaned and made safe upon completion of the job.
CONTENTS:
Principle and operation of fluorescent lamp
Characteristics of fluorescent lighting fixtures
Parts and functions of fluorescent lighting fixtures
Interpretation of schematic diagram of fluorescent lighting fixtures
Fluorescent sizes, shapes, and ratings available in the market
Different kinds of ballasts used in fluorescent fixture
Factors that affect the life span of fluorescent fixtures
Procedure in assembling fluorescent lighting fixtures
CONDITIONS:
The following resources are needed:
Tools
linemans pliers
long nose pliers
diagonal cutting
pliers
Philips
screwdriver
flat screwdriver

Supplies and
Materials

electrical tape
ballasts
fluorescent tube
fluorescent lamp

holder
starter
starter holder

wires
fluorescent frame
Learning Materials
learning elements
drawing plan
books, manuals,
and catalogs
Philippine
Electrical Code

Equipment

simulated work
place or actual
work place

METHODOLOGIES:

multi-tester
Personal Protective
Equipment (PPE

ASSESSMENT METHODS:

Group Discussion

Demonstration

Demonstration
Written test

Republic of the Philippines


Department of Education
Region V
Division of Sorsogon

TALAONGA NATIONAL HIGH SCHOOL


Sta. Magdalena

TRAINING ACTIVITY MATRIX


Sector
Qualification Title
Unit of Competency/ Lesson
Module Title

:
:
:
:

Industrial Arts
ELECTRICAL INSTALLATION & MAINTENANCE
Install electrical lighting systems on auxiliary outlets and lighting fixtures
Installing electrical lighting systems on auxiliary outlets and lighting fixtures

LO 5 Assemble fluorescent lighting fixtures.


LO 6. Lay out and install fluorescent lighting fixtures
Person
Training Activity

Involve/

Facilities

Venue

Date/Time

Trainee
A. Preliminaries:
- Prayer
- Recap of the
-

activity
Unfreezing Activity

B. Activities:

12/17/2014
Teacher/
All
trainees

Contextual
Laptop, Module

Learning
Area

8:00-8:10

Remarks

1. Read Information Sheet 5.11 on Principle and operation of


fluorescent lamp

2. Perform Task Sheet 5.1-2


Assembling Open type 20

Group

Module/Informatio

Learning

n Sheet 5.1-1

Resource

Pilikitot

Self Check

Area

Duday

Answer Key 5.1-1

Group

Task Sheet 5.1-2

Simulation

1 set Fluorescent

Area

Lamp, Pliers, Long

watts Fluorescent Lamp

8:10-9:00

8:10-9:00

Nose Plier, Screw


3.

Watch Video presentation on

Group

Driver, Tester, PPE


Laptop

Installing CFL controlled by

Projector

a two (2) SPDT or (single

Install CFL controlled by a two (2)


SPDT or (single pole- double

Laboratory

Video Presentation

pole- double throw) switch

4. Perform Job Sheet 6.1-1

Computer
8:10-9:00

Self-Check

Group

Job Sheet 6.1-1

Practical

CFL, Receptacle,

Work Area

Junction box,

( Station # 5)

throw) switch

Utility Box, CB,

8:10-9:00

wires, Pliers, Screw


Drivers, Electrical
Tape, Tester,
5. Perform Job Sheet 6.1-1

Advance

Conduits
Job Sheet 6.1-1

Institutional

8:10-9:00

Install CFL controlled by a two (2)


SPDT or (single pole- double
throw) switch

Students

CFL, Receptacle,
Junction box,
Utility Box, CB,
wires, Pliers, Screw
Drivers, Electrical
Tape, Tester,
Conduits

Assessment
Area

S-ar putea să vă placă și