CONTRACT DOCUMENTS

FOR

BARTON DAM CONCRETE TESTING AND ACCESS SYSTEM

JANUARY, 2010

FILE NO. 10003


BID NO. ITB-4066

PUBLIC SERVICES DEPARTMENT

CITY OF ANN ARBOR


100 North Fifth Avenue
Ann Arbor, Michigan 48104

Version 06/2004
CREST BEAM

PIER

Crest Beams, Piers, Spillway Face – Cores shall be taken into the vertical faces of the crest beams and piers. Cores shall also be taken
into the spillway face.

V:\2075\active\2075090900\Task XXX.XXX Barton Concrete Repair_June 08 Proposal\Photos\img_barton_dam_photos_&_captions_20100111.doc


Spillway Face – Cores shall be taken into the spillway face. Shown above is the spillway face looking down from the walkway on top
of the dam.

V:\2075\active\2075090900\Task XXX.XXX Barton Concrete Repair_June 08 Proposal\Photos\img_barton_dam_photos_&_captions_20100111.doc


Downstream Left Wing Wall – Cores shall be taken into the vertical face of the downstream left wing wall just above the water line.

V:\2075\active\2075090900\Task XXX.XXX Barton Concrete Repair_June 08 Proposal\Photos\img_barton_dam_photos_&_captions_20100111.doc


Upstream Right Retaining Wall – Cores shall be taken into the vertical face of the upstream right retaining wall just above the water
line.

V:\2075\active\2075090900\Task XXX.XXX Barton Concrete Repair_June 08 Proposal\Photos\img_barton_dam_photos_&_captions_20100111.doc


UPSTREAM RIGHT
RETAINING WALL

INTAKE
STRUCTURE

Intake Structure – Cores shall be taken into the vertical faces of the intake structure just above the water line.