1. EO No

I~EV.

EO-2013-3197

__

ISSUED D:-\TE.

FORi\13003

OTHER REF

26 JUN _2013

AO~.-i.~~72!2Q..11/05 issue 2

2. TITLE.

Engine nncelle oil cooler flaps ;nspection


3. EFFECTIVITY BY REG/MSN NUMBER/ENG.S/N

---------

[gJ AlC

/PART NUMBER

---_.-

-----------

ATR72

0 Engines
0 Units
---

-------

_~=t-=~~---=t~~-=t_=t-=--=E~_ j-E~~ Al.L MS

4_CATEGORY--[
5. TASKTYPE'--------------_._-----Mandatory
f] Modification

o
o Alert

[g] Recommended

[l R2pairIDeviation

o Attrition

IZl Proal'to.

-----

IZ?J Int81val

prgrn c~ldnge

? MANUALS AFFECTED

02 JUL 2013.

Inspection

0 Maint

o Retrofit

G. SCI-lEDULI~IG PRIORITY

-------

? DAYS

Maintenance Manu31

[]

Illustrated ?arts Catalogue

Wiring diagram

o Overhaul

o Limit.

M3nual

0 FM/FCOM

______
.___
8. Wl::IGHT & BALANCE

[]

WI. Change (+/- Ibs)

Center of Gravity Change (e/- % MAC)

N/A

!'_I/A

Ot~_e._r
_.

9, COIVlMr:NTS
This EO is issued to perform inspection Engine nacelle oil cooler flaps for ATR airplanes lAW
recommendation ref. AOl'vl 42/72/2011/05 issue 2.

------------------------_._-----------

__________

'IO_._h_P_P_R_O_V_AL(ENGINEERING

Engineering Division
Performed by. Ha Quang Vinh
Sign.

Accepted by. Tran


Sign.

Date. 26

Date 26 .JUN 2013


11. COST/ INVESTMENT (if required)
Man hour

DEPT.)

XU8,l

-----

Duong

Jf!::r-

12. MANAGEMENT

ATR

APPROVAL

(if required)

Material
Tools/ Equipment
Total per unit

Date.

Total fleet investment

ISS. 02. REV. 02 - DATE: 22 NOV 2012

I'ag<:: I

()r~

VIET NAM AIRLINES ENGINEERING COMPANY

FORM 3003

ENGINEERING ORDER

WORKSHEET

CH LNH K THUT
1. EO No:
EO-2013-3197

REV.

ISSUED DATE:
26 JUN 2013

OTHER REF:
AOM 42/72/2011/05 issue 2

2. TITLE :

Engine nacelle oil cooler flaps inspection


13. PLANNING INFORMATION
A/C REG./ MSN
WO No.

CARD No.

STATION

DEADLINE

WP Ref.

COMMENTS:

14. TOOLING AND MATERIALS


ITEM
P/N
DESCRIPTION
1.
2.
15. WORK RECORD
ITEM
WORK REQUIREMENT
A

QTY.

MECH.

GRN

INSP.

PROCEDURE
FOR LH ENGINE
- Perform DVI OF NACELLES FRONT SECTION CENTER AND
REAR OIL COOLER FLAPS I.A.W AMM (JIC) 541261-DVI-10020
(File attached)
- Confirm inspection results:
Nacelles Front Section Center and Rear Oil
Cooler Flaps condition

Yes

No

Is there any cracks and abnormal plays/gaps


on Flap (1) external surfaces?

Is there any cracks and abnormal plays/gaps


on Flap (1) internal surfaces?

Is there any cracks and abnormal plays/gaps


on Flap (2) external surfaces?

Is there any cracks and abnormal plays/gaps


on Flap (2) internal surfaces?

Is there any cracks and abnormal plays/gaps


on hinge fittings (3)?

Is there missing or loose fasteners, screws,


nuts. on hinge fittings (3)?

Is there any cracks and abnormal plays/gaps


on hinge fittings (4)?

Is there missing or loose fasteners, screws,


nuts. on hinge fittings (4)?

- In case of findings during these inspections, send a detailed damage


report showing crack(s) location and dimension with mapping and
pictures to Engineering Dept. and go to next step.
Remarks:

....
ISS. 02, REV. 02 - DATE: 22 NOV 2012

Page 2 of 4

VIET NAM AIRLINES ENGINEERING COMPANY

FORM 3003

ENGINEERING ORDER

WORKSHEET

CH LNH K THUT
1. EO No:
EO-2013-3197

REV.

ISSUED DATE:
26 JUN 2013

OTHER REF:
AOM 42/72/2011/05 issue 2

2. TITLE :

Engine nacelle oil cooler flaps inspection


ITEM

WORK REQUIREMENT

MECH.

INSP.

FOR RH ENGINE
- Perform DVI OF NACELLES FRONT SECTION CENTER AND
REAR OIL COOLER FLAPS I.A.W AMM (JIC) 541261-DVI-10020
(File attached)
- Confirm inspection results:
Nacelles Front Section Center and Rear Oil
Cooler Flaps condition

Yes

No

Is there any cracks and abnormal plays/gaps


on Flap (1) external surfaces?

Is there any cracks and abnormal plays/gaps


on Flap (1) internal surfaces?

Is there any cracks and abnormal plays/gaps


on Flap (2) external surfaces?

Is there any cracks and abnormal plays/gaps


on Flap (2) internal surfaces?

Is there any cracks and abnormal plays/gaps


on hinge fittings (3)?

Is there missing or loose fasteners, screws,


nuts. on hinge fittings (3)?

Is there any cracks and abnormal plays/gaps


on hinge fittings (4)?

Is there missing or loose fasteners, screws,


nuts. on hinge fittings (4)?

- In case of findings during these inspections, send a detailed damage


report showing crack(s) location and dimension with mapping and
pictures to Engineering Dept.
Remarks:

CLOSE UP
Put aircraft back to serviceable configuration.

ISS. 02, REV. 02 - DATE: 22 NOV 2012

Page 3 of 4

VIET NAM AIRLINES ENGINEERING COMPANY

FORM 3003

ENGINEERING ORDER

WORKSHEET

CH LNH K THUT
1. EO No:
EO-2013-3197

REV.

ISSUED DATE:
26 JUN 2013

OTHER REF:
AOM 42/72/2011/05 issue 2

2. TITLE :

Engine nacelle oil cooler flaps inspection


16. Statement:
The articles identified above were maintained/altered and inspected in accordance with current regulations
of the competent Authority and is approved for return to service.
.....................................................................................................................................................................
.....................................................................................................................................................................
17. Approval of competent Authority:
CAAV approval No. VN-268/CAAV

FAA approval No. V48Y426B

FAA approval No. V48Z426B;

............................................................................

18. Date: .......................... Name: ............................................... Signature / Stamp:


19. TECH. RECORD REQUIREMENT:
Record the accomplishment of the AOM 42/72/2011/05 issue 2 into AIRCRAFT LOG BOOK.
Signature/ Stamp:
20. REMARKS/ FINDINGS:

ISS. 02, REV. 02 - DATE: 22 NOV 2012

Page 4 of 4

Job Instruction Card


541261 DVI 10020
DVI OF NACELLES FRONT SECTION CENTER AND
REAR OIL COOLER FLAPS
TECHNICAL DATA
ZONING DATA
ZONE:
Z 451

Z 461

ACCESS:
PREPARATION
WORK

: SKILL

ELAPSED TIME

GSE

SPARE
EXPENDABLE

:
:

BULK MATERIAL

MEN

01

ACCESS PLATFORM

01
01

MAGNIFYING GLASSES
LIGHT SOURCE

MAN-HOURS

PUBLICATION

CUSTOMER:

EFFECTIVITY: ATR 42-500 / ATR 72

DATE: 08/03/13

PAGE 1

Job Instruction Card


541261 DVI 10020
TASK DESCRIPTION
001

PREPARATION
1. DISPLAY WARNING NOTICE PROHIBITING THE
OPERATION OF ENGINE CONTROLS
2. INSTALL ACCESS PLATFORM AT ENGINE

002

DETAILED VISUAL INSPECTION OF


NACELLES FRONT SECTION CENTER AND
REAR OIL COOLER FLAPS
REF. FIG. 541261-DVI-00130
CAUTION : THIS INSPECTION IS TO BE DONE ON
BOTH SIDES OF FLAPS AND ESPECIALLY
IN ARTICULATION AREA.
NOTE : IN ORDER TO CORRECTLY INSPECT INTERNAL
ZONES OF FLAPS :
- OPERATE FLAPS BY HANDS,
- USE MAGNIFYING GLASSES AND ADAPTED
LIGHT SOURCE.
1. CAREFULLY INSPECT FLAPS (1) & (2) FOR :
- CRACKS AND ABNORMAL PLAYS/GAPS ON
EXTERNAL SURFACES.
- CRACKS AND ABNORMAL PLAYS/GAPS ON
INTERNAL SURFACES.
2. CAREFULLY INSPECT HINGE FITTINGS (3) & (4)
FOR :
- CRACKS AND ABNORMAL PLAYS/GAPS.
- MISSING OR LOOSE FASTENERS, SCREWS,
NUTS.
3. CHECK FOR REDUCED GAPS AND FREEDOM OF
MOVEMENTS.

003

CLOSE-UP
1. MAKE CERTAIN THAT THE WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEMS
OF EQUIPMENT.
2. REMOVE ACCESS PLATFORM.
3. REMOVE WARNING NOTICES.

CUSTOMER:

EFFECTIVITY: ATR 42-500 / ATR 72

DATE: 08/03/13

PAGE 2

Job Instruction Card


541261 DVI 10020

Figure: 541261-DVI-00130
DETAILED VISUAL INSPECTION OF
OIL COOLER CENTER AND REAR FLAPS

CUSTOMER:

EFFECTIVITY: ATR 42-500 / ATR 72

DATE: 08/03/13

PAGE 3